scholarly journals Project management and its relation to long-term project success : an empirically based theoretical framework.

2014 ◽  
Author(s):  
Youssef Boudlal
Author(s):  
Daniel M. Brandon

Software engineering is vital for the proper planning of IT projects, although it is not a formal part of project management. The software engineering embedded in the acquired products will significantly affect long-term project success factors, even for IT projects that primarily involve software acquisition and integration instead of software development,. In this chapter I review software engineering and its relation to IT project management.


Author(s):  
Andrea Lorenzo Capussela

This chapter lays out one part of the theoretical framework of the book, drawn from institutional economics. This literature maintains that institutions are the main determinant of long-term growth, and that to remain ‘appropriate’ institutions must evolve in synchrony with an economy’s progress through the stages of its development. Their evolution depends on a society’s openness to political creative destruction. Limited-access social orders tend to constrain it, to safeguard elites’ rents, and typically undermine progressive institutional reforms, breaking that synchrony. The transition from that social order to the open-access one is an endogenous and reversible process, in which inefficient institutions, which allow elites to extract rents, coexist with appropriate ones, which constrain their power and make it contestable. The hypothesis is advanced that Italy has not yet completed this transition, and that the tension between its efficient and inefficient institutions can endogenously generate shocks, which open opportunities for equilibrium shifts.


2006 ◽  
Vol 25 (1) ◽  
pp. 31-50
Author(s):  
Kensei Hiwaki ◽  
Junie Tong

This article provides a theoretical framework for a long-term socioeconomic lethargy (Credibility Trap) that results from the liquidation of holistic society-specific culture. As for example, it deals with the cases of Japan today and China tomorrow, elaborating on the slight of their respective society-specific cultures in a century-long process of “modernization”. The present theoretical framework primarily consists of three pivotal concepts, viz., Credibility Trap, society-specific cultures (Cultures) and market fundamentalism (Market), which facilitates a clear, concise and effective argument that the liquidation of their respective holistic Cultures may intimately relate to their actual and potential socioeconomic lethargy. Also, the present article concentrates on the elaboration of some promising avenues for prevention and cure of Credibility Trap. Such avenues comprise the necessary and sufficient conditions for a balanced socioeconomic development; a theoretical framework for a perpetual “virtuous” circle among cultural enrichment, comprehensive human development and balanced socioeconomic development; and a normative framework of multi-faceted value enhancement for vitality augmentation and cultural enrichment within a society.


2021 ◽  
Vol 13 (11) ◽  
pp. 6347
Author(s):  
Marco Nunes ◽  
António Abreu ◽  
Célia Saraiva

Projects are considered crucial building blocks whereby organizations execute and implement their short-, mid-, and long-term strategic visions. Projects are thought, developed, and implemented to solve problems, drive change, satisfy unique needs, add value, and exploit opportunities, just to name a few objectives. Although existing project management tools and techniques aim to deliver projects with success, according to the latest reviewed literature, projects still keep failing at an impressive pace. Among the extensive list of factors that may threaten project success, several articles from the research literature place particular importance on a still underexplored factor that may strongly lead to unsuccessful project delivery. This factor—usually known as corporate behavioral risks—usually emerges and evolves as organizations work together to deliver projects across a bounded period of time, and is characterized by the mix of formal and informal dynamic interactions between the different stakeholders that constitute the different organizations. Furthermore, several articles from the research literature also point out the lack of proper models to efficiently manage corporate behavioral risks as one of the major factors that may lead to projects failing. To efficiently identify and measure how such corporate behaviors may contribute to a project’s outcomes (success or failure), a heuristic model is proposed in this work, developed based on four fundamental fields ((1) project management, (2) risk management, (3) corporate behavior, and (4) social network analysis), to quantitatively analyze four critical project social networks ((1) communication, (2) problem-solving, (3) advice, and (4) trust), by applying the theory of social network analysis (SNA). The proposed model in this work is supported with a case study to illustrate its implementation and application across a project lifecycle, and how organizations can benefit from its application.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Aqsa Ameer ◽  
Farah Naz ◽  
Bushra Gul Taj ◽  
Iqra Ameer

Purpose The purpose of this study is to determine the effect of conscientiousness and extraversion personality traits on project success. The relationship is mediated by affective professional commitment, whilst the relationship between personality traits and project success is moderated by organizational project management maturity. Design/methodology/approach The deductive approach is used to achieve the objectives of this study. Data were collected through a purposive sampling technique from 250 respondents with the help of questionnaires from information technology sectors. The structural equation modelling (SEM) in partial least squares-SEM and SPSS is used to analyse the data and to examine the hypothesis. Findings The outcomes demonstrate the partial mediating impact of affective professional commitment between the relationship of conscientiousness and extraversion personalities with project success. Additionally, it proves the moderating effects of project management maturity between the relationship of conscientiousness and extraversion personalities with project success. Practical implications This study reflects that employee personality appears to be a reliable indicator of how an employee is faithful to his profession. This faithfulness or duty decides the employee’s execution in terms of offering a successful project. Thus, achieving employee commitment needs to be done by completing the project successfully by the organizations in the presence of project management maturity systems. Originality/value It is the first study of its kind to provide experimental proof of the impact of a manager’s personality traits on project success in the presence of affective professional commitment (mediator) and organizational project management maturity (moderator).


2005 ◽  
Vol 4 (1-2) ◽  
pp. 27-32 ◽  
Author(s):  
Colin A Sharp

The use of Capability Maturity Models in financial management, project management, people management and information systems management in a wide variety of organisations indicates the potential for an Organisational Evaluation Capability Hierarchy to guide the self-diagnosis of organisations in building their evaluation maturity. This paper is about the theory behind this growing trend in organisational governance and organisational diagnosis, and explores its relevance to evaluation theory and practice. This theoretical analysis may have long-term practical benefits for evaluation practitioners, as is being developed in the fields of project management, financial management, and people management in a wide range of organisations.


2005 ◽  
Vol 36 (1) ◽  
pp. 37-50 ◽  
Author(s):  
Mark Ives

Change within organizations is becoming the rule rather than the exception as businesses seek to respond to an increasingly fluid, complex, and global business environment. This drive demands that organizations embrace a more strategic response to avoid being leap-frogged by more nimble competitors. As Cicmil points out (1997, 1999), strategic organizational change is most likely facilitated and managed through an organization's use of the project management disciplines. This study attempts to develop a greater understanding of the contextual aspects of project management in an organizational change setting. In reviewing the current literature, I have found an increasing use of project management within organizations and an attendant poor rate of success among these projects; interestingly, I also found only limited research on the context and fit of projects within organizations. I have addressed this void with an essentially exploratory research project that utilizes inductive strategy. The process I have used is qualitative and based on in-depth interviews with four people.


2019 ◽  
Vol 9 (2) ◽  
pp. 56-65
Author(s):  
Michael Pace

Abstract This non-experimental correlational study extends previous research investigating the relationship between project management methodology and reported project success, as well as the moderating variables of industry and project manager experience. The sample included North American project managers with five years’ experience, 25 years of age or older, and experience with multiple project management methodologies. The survey instrument consisted of 58 questions, utilizing a 5-point Likert scale to record responses. The survey contained three sections, including demographic information, questions related to a successful project, and questions related to a less-than successful (failed / challenged) project. 367 usable responses were received. The examination of the constructs included Pearson’s correlation coefficient as well as linear regression to determine the impact of moderating variables. Results indicated that project management methodology has a weak correlation with reported project success, and this correlation is not moderated by industry nor project manager experience. The results did not align with previously conducted studies, illustrating a need to continue the study of methods impacting success including investigating additional moderating variables.


Sign in / Sign up

Export Citation Format

Share Document