scholarly journals IMPROVEMENT OF SYSTEMS OF TECHNICAL WATER SUPPLY WITH COOLING TOWERS FOR HEAT POWER PLANTS TECHNICAL AND ECONOMIC INDICATORS PERFECTION. Part 2

Author(s):  
Yu. A. Zenovich-Leshkevich-Olpinskiy ◽  
N. V. Shiroglazova ◽  
A. Yu. Zenovich-Leshkevich-Olpinskaya
2021 ◽  
Vol 25 (4 Part B) ◽  
pp. 3209-3218
Author(s):  
Dongliu Huang ◽  
Jianluan Guo ◽  
Wenjun Ouyang

The paper starts with calculating the share of heat of condensate in thermal power plants in the total heat of steam, expounds the purpose, significance, and principle requirements of condensate recovery. Introduces the composition and classification of condensate recovery system, proposes technical and economic indicators for condensate recovery, and derives them a simple algorithm for the benefit of condensate recovery is presented. Finally, two calculation examples are used to illustrate the considerable benefits of condensate recovery.


2021 ◽  
Vol 264 ◽  
pp. 04056
Author(s):  
Muradilla Mukhammadiev ◽  
Kurbon Dzhuraev ◽  
Sanjar Juraev ◽  
Abdurauf Abduaziz Uulu ◽  
A Makhmudov

In our country, a lot of attention is paid to the development of the energy sector. A lot of work is underway to modernize existing capacities and commission new capacities. At the same time, the unit capacities of units and power plants also increase, which ensures faster commissioning of capacities in the power system and an increase in the efficiency of power plants. Attention is also paid to the development of power plants based on renewable energy sources (hydraulic, solar, wind, etc.). One of the most important tasks in the power industry is to cover peak minimum and maximum loads, which is becoming increasingly important in connection with the growth of the power system's capacity. As is known, according to world indicators, the maneuverable capacities should be about 25% of the total power of the EPS. The most promising maneuverable capacities are hydroelectric power plants. However, in our country, hydroelectric power plants account for about 14.3%. This task will become more complicated with the introduction of capacities based on solar and wind energy and the commissioning of new hydroelectric and thermal power plants in the Republic. This is because RES capacities have a significant discontinuity even during the day, and the water resources in the Republic are primarily for irrigation and drainage purposes and are significantly variable during the season. One way to solve these problems in the world is the creation and use of pumped storage power plants (PSPP). The peculiarities of the creation and use of pumped storage power plants in our region are that the available hydro resources of our region are mainly of water management importance, while the task is also to increase the energy efficiency of existing reservoirs. Based on the foregoing, we can say that the development of methods for determining the economic efficiency of pumped storage power plants, taking into account direct and indirect effects, taking into account the peculiarities of their use in energy and water management systems of Uzbekistan is the main task for the present time. To solve the set tasks, a new methodology and program for substantiating the technical and economic indicators of pumped storage power plants in Uzbekistan's energy and water management systems have been developed. The schemes of using pumped storage power plants at four energy and water management facilities, that is, the Tuyamuyun hydro subunit, Arnasai, Talimarjan, and Khodjikent reservoirs, were considered, and for these facilities, based on the developed methodology and program, their technical and economic parameters of the pumped storage power plant were determined. Based on the results obtained, it can be said that using the PSPP in four facilities, it is possible to generate a total of about 418 MW of capacity and more than 930.0 million kWh of electricity, as well as to save 139 thousand tons of fuel equivalent per year, with this, the annual economic efficiency will be about 700.0 billion sums.


2020 ◽  
Vol 164 ◽  
pp. 13009
Author(s):  
Yevgeniy Umerenkov ◽  
Elina Umerenkova ◽  
Ekaterina Pakhomova ◽  
Natalia Semicheva

A variant of the problem statement is proposed to develop an algorithm for calculating a solar collector of hot water supply for an individual dwelling. The purpose of the calculations is to determine the approximate values of the main characteristics of the heliosystem of hot water supply, which affect the technical and economic indicators of the system and determine the operating mode of the system, its comfort in use and maintenance.


2021 ◽  
pp. 52-62
Author(s):  
B. V. Lukutin ◽  
◽  
D. I. Muravyev ◽  

In this article, a simulation model of an autonomous PVdiesel power supply (PDPS) system with direct current is considered. The autonomous PDPS is implemented in the Simulink programming environment of the Matlab software package. The system includes: a photovoltaic power station (PPS), a diesel generator (DG), an energy storage system (ESS), a remote consumer as well as auxiliary converters. The PDPS model makes it possible to analyze the energy balance between generation, consumption, and the energy exchange available from the ESS connected via a DC bus (DCB). With the help of the proposed model, it is possible to analyze and optimize the technical and economic indicators of DC power plants with the priority of the PPS contribution: reducing the consumption of diesel fuel and carbonation of the air reducing the cost of 1 kWh for the remote consumer and controlling the switching in the power plants as per logical conditions. The obtained technical and economic indicators of the PDPS using direct current are superior to similar systems based on alternating current due to an increase in the contribution of the PPS to the energy balance. As a result of experiments with changing input conditions, i.e. annual changes in insolation and temperature at different latitudes, the authors justify technical, economic, and environmental criteria for the effectiveness of decision-making and recommendations for the design and operation of PDPS power plants. Intelligent algorithms for effective control of PV-diesel power systems based on DC are developed and suggested


Author(s):  
S.f. Antonov ◽  
◽  
E.F. Kutsevich ◽  
A.I. Matveeva ◽  
R.V. Bartko ◽  
...  

Variants of the intensification of the solvent dewaxing process, which increase the yield of base oils, are described. One of the promising ways to improve the technical and economic indicators of the dewaxing process is the use of modifying additives. The work shows that the introduction of a polymer additive requires a decrease in the filtration rate and, accordingly, an increase in the performance of the dewaxing unit. This results in a petrolatum with a reduced oil content, which is a qualifying factor for the production of high-melting ceresins, protective-wax components, and lubricants for various purposes.


Author(s):  
В.В. ГОРДЕЕВ ◽  
В.Е. ХАЗАНОВ

При выборе типа доильной установки и ее размера необходимо учитывать максимальное планируемое поголовье дойных коров и размер технологической группы, кратность и время одного доения, продолжительность рабочей смены дояров. Анализ технико-экономических показателей наиболее распространенных на сегодняшний день типов доильных установок одинакового технического уровня свидетельствует, что наилучшие удельные показатели имеет установка типа «Карусель» (1), а установка типа «Елочка» (2) требует более высоких затрат труда и средств. Установка «Параллель» (3) занимает промежуточное положение. Из анализа пропускной способности и количества необходимых операторов: установка 2 рекомендована для ферм с поголовьем дойного стада до 600 голов, 3 — не более 1200 дойных коров, 1 — более 1200 дойных коров. «Карусель» — наиболее рациональный, высокопроизводительный, легко автоматизируемый и, следовательно, перспективный способ доения в залах, особенно для крупных молочных ферм. The choice of the proper type and size of milking installations needs to take into account the maximum planned number of dairy cows, the size of a technological group, the number of milkings per day, and the duration of one milking and the operator's working shift. The analysis of technical and economic indicators of currently most common types of milking machines of the same technical level revealed that the Carousel installation had the best specific indicators while the Herringbone installation featured higher labour inputs and cash costs. The Parallel installation was found somewhere in between. In terms of the throughput and the required number of operators Herringbone is recommended for farms with up to 600 dairy cows, Parallel — below 1200 dairy cows, Carousel — above 1200 dairy cows. Carousel was found the most practical, high-performance, easily automated and, therefore, promising milking system for milking parlours, especially on the large-scale dairy farms.


Sign in / Sign up

Export Citation Format

Share Document