Operation with biological nutrient removal with stable nitrification and control of filamentous growth

1998 ◽  
Vol 37 (4-5) ◽  
pp. 549-554 ◽  
Author(s):  
Maria Rothman

Bromma WWTP is the second largest wastewater treatment plant in Stockholm, Sweden. To meet new regulations regarding nitrogen removal the plant needs to be operated with nitrogen removal all year round. In previous years, severe bulking problems during the winter have made it impossible to maintain nitrification during colder temperatures. Microscopic examination of the activated sludge has increased the understanding of bulking. The bulking is mainly due to excessive growth of filamentous organisms, mainly Microthrix parvicella. By operating the plant with a high F/M ratio and decreasing the F/M ratio when filamentous growth occurs, excessive growth of these organisms can be avoided. The nitrification rate is optimized by adjusting the concentration of mixed liquid suspended solids in the tanks so that the nitrification is complete and by operating the tanks at a DO concentration of 4 mg/l. By this process strategy it is now possible to operate the plant with nitrification all year round.

2013 ◽  
Vol 67 (7) ◽  
pp. 1481-1489 ◽  
Author(s):  
R. Barat ◽  
J. Serralta ◽  
M. V. Ruano ◽  
E. Jiménez ◽  
J. Ribes ◽  
...  

This paper presents the plant-wide model Biological Nutrient Removal Model No. 2 (BNRM2). Since nitrite was not considered in the BNRM1, and this previous model also failed to accurately simulate the anaerobic digestion because precipitation processes were not considered, an extension of BNRM1 has been developed. This extension comprises all the components and processes required to simulate nitrogen removal via nitrite and the formation of the solids most likely to precipitate in anaerobic digesters. The solids considered in BNRM2 are: struvite, amorphous calcium phosphate, hidroxyapatite, newberite, vivianite, strengite, variscite, and calcium carbonate. With regard to nitrogen removal via nitrite, apart from nitrite oxidizing bacteria two groups of ammonium oxidizing organisms (AOO) have been considered since different sets of kinetic parameters have been reported for the AOO present in activated sludge systems and SHARON (Single reactor system for High activity Ammonium Removal Over Nitrite) reactors. Due to the new processes considered, BNRM2 allows an accurate prediction of wastewater treatment plant performance in wider environmental and operating conditions.


2009 ◽  
Vol 4 (1) ◽  
Author(s):  
E. Choi ◽  
Z. Yun ◽  
K.S. Min

In a densely populated area, a large wastewater treatment plant (WWTP) has been constructed in the underground. The plant is practically “invisible” to visitors and neighbours, and the ground level is used as a park and sport facilities in order to avoid the “not in my backyard” phenomenon. The WWTP has a 5-stage biological nutrient removal system utilizing the denitrifying PAO (dPAO) with a step feed in order to treat the weak sewage with higher nutrient removal requirement. Although the underground installation could be expected to increase plant operating temperature, the temperature increase was only 1°C. The polished final effluent from a sand filter produced average TN and TP concentrations of 5.11 mg/L and 0.91 mg/L, respectively with SS concentrations of 0.61 mg/L, indicating that the dPAO system combined with sand filter effectively produced a high quality effluent.


2004 ◽  
Vol 48 (11-12) ◽  
pp. 453-462
Author(s):  
E.U. Cokgor ◽  
C.W. Randall

The Wilderness Wastewater Treatment Plant (WWTP) located in Orange County, Virginia is a four concentric ring oxidation ditch activated sludge system with a rated capacity of 1,935 m3/day. The three outer rings are used for wastewater treatment and the inner ring is used as an aerobic digester. The flow capacity has been increased from 1,935 to 3,760 m3/d, however, the desired design capacity has since been increased to 3,870 m3/d, and there are plans to eventually expand to approximately 4,840 m3/d with improved nitrogen removal. The design goal for the planned upgrade is to discharge an effluent that contains less than 10 mg/l total nitrogen (TN) at all times, with an annual average of 8 mg/l or less. In this study, the pre-upgrade performance of the Wilderness Wastewater Treatment Plant was evaluated and several modifications were recommended for the incorporation of biological nutrient removal (BNR).


2004 ◽  
Vol 48 (11-12) ◽  
pp. 419-428 ◽  
Author(s):  
L. Larrea ◽  
A. Abad ◽  
J. Gayarre

The effect on NH4-N removal rates in nitrification biofilters of filtered biodegradable COD and particulate COD leaving predenitrification biofilters was studied in a lab scale plant configured with the separated system of biofilters for secondary nitrogen removal from urban wastewaters. Applying a typical COD load of 11 kg/m3.day to the predenitrification biofilter and maximizing its COD removal by adding nitrates or by operating an improved control of the internal recycle, only 60% removal of filtered biodegradable COD was found. This value corresponds to the complete removal of the readily biodegradable substrate (30% of influent filtered COD) and 36% of filtered slowly biodegradable substrate (50% of influent COD). The remaining 64% of the latter entered the nitrification biofilter, causing competition between heterotrophs and nitrifiers for dissolved oxygen in the inner layers of the biofilm. Consequently the nitrification rate had relatively low values (0.5 kgN/m3.d) at 14°C despite using dissolved oxygen levels of 6 mg/l. This behaviour may explain the lower nitrification rates obtained in some cases of nitrification biofilters compared to those in tertiary nitrification after activated sludge processes. The particulate COD entering the nitrification biofilter is associated with the suspended solids leaving the denitrification biofilter which are adsorbed by the external layers of the biofilm, increasing its thickness. The activity of the nitrifiers was affected because of a lack of oxygen when the thickness was left to grow considerably. Therefore no significant particulate COD effect is expected to occur as long as backwashing is carried out with the appropriate frequency.


1996 ◽  
Vol 33 (12) ◽  
pp. 155-162 ◽  
Author(s):  
Clifford W. Randall ◽  
Dipankar Sen

One of the two trains of the 37,000 m3/d Annapolis, Maryland step aeration activated sludge treatment plant was modified for single-sludge anoxic-aerobic operation, and then fixed-film media were integrated into the aerobic zone to enhance nitrification. Rope-like Ringlace media was selected for integration, and 30,000 meters were installed in a volume of 475 m3 for a pilot demonstration. The purpose of the integrated fixed-film media was to upgrade the short hydraulic retention time (HRT) basin (6 hrs nominal) for efficient, year-round nitrogen removal without construction to increase basin volume. An engineering study had concluded that upgrading the facility for year round complete nitrification, without nitrogen removal, would cost US$24 million. The modified train was operated for 12 months, six in the plug-flow MLE configuration, and six in a step-feed configuration. The integrated Ringlace media increased the nitrification rate per unit volume to 225% of that observed in the control section, attaining a value of 1.75 kg/d NH3-N per linear meter at 15°C. The media also increased denitrification in the aerobic media section to the extent that between 30 and 88% of the nitrates formed in the section were denitrified within it, permitting a potential 25% or more reduction in the volume of the anoxic zone. An IFAS retrofit design was developed which incorporated step-feed operation, and reduced the projected construction cost to US$9.2 million.


2009 ◽  
Vol 60 (9) ◽  
pp. 2439-2445 ◽  
Author(s):  
A. Lynggaard-Jensen ◽  
P. Andreasen ◽  
F. Husum ◽  
M. Nygaard ◽  
J. Kaltoft ◽  
...  

Most wastewater treatment plants have several secondary clarifiers or even more sets of clarifiers including several secondary clarifiers, and in practice it is a well known problem that equal distribution of the load to the single clarifier (or set of clarifiers) is very difficult—not to say impossible—to obtain. If the problem is neglected, quite a big percentage of the total clarifier capacity—measured as the max. allowed hydraulic load—can be lost. Further, return sludge rates are seldom controlled by any other means than as a (typically too high) percentage of the inlet to the wastewater treatment plant—giving a varying and too low suspended solids concentration in the return sludge, which again can lead to an unnecessary use of polymer in the pre-dewatering of the surplus sludge taken from the return sludge. A control of the return sludge rate divided into two parts - control of the total return sludge flow and control of how the total flow shall be distributed between the secondary clarifiers - is able to solve the mentioned problems. Finally, as shall be demonstrated on full scale wastewater treatment plants, a considerable increase of the hydraulic capacity of the treatment plants can be obtained.