Analysis of Resource Moment Approach and Release & Rehire Approach for Resource Optimization in Construction Project
2021 ◽
Vol 9
(9)
◽
pp. 192-200
Keyword(s):
Abstract: Building approaches frequently produce schedules which induce undesired, cost-effective resource variations in the field. Two sorts of situational limitations and resource restrictions occur often with a project manager. The resources for carrying out the tasks are required for a project. These resources comprise the necessary effort, equipment and supplies. The resources in the ideal world are infinite but typically not endless throughout the real world, and the project team needs to level off resource usage. Keywords: Resource, Levelling, Resource moment, Minimum moment method, RRH