scholarly journals CONTRACTORS SELECTION CRITERIA FRAMEWORK FOR CONSTRUCTION PROJECT IN KLANG VALLEY

2021 ◽  
Vol 1 (1) ◽  
pp. 22-34
Author(s):  
Mohd Shahril Zainal Abedin ◽  
Siti Rashidah Mohd Nasir ◽  
Abdullah Basri

Malaysia's construction industry is going from strength to strength, with a whole host of newly-announced projects promising to increase activity. Moreover, the construction industry is a very important part of Malaysian economy. The country already has a lot of projects ongoing and under the pipelines, with an ever-changing urban landscape offering plenty of opportunities. The evaluation of project success and the level of success criticality in the development of construction projects in Malaysia are according to the specific requirements and priorities of different project stakeholders and varies from project to project. However, the issues related to maintenance and project functionality are of main concerned to most Government Agencies in Malaysia at the project completion stage apart from client satisfaction on the good services and excellent product deliverables. In the contractor selection stage is commonly used procedure for identifying a pool of competitive, competent and capable contractors from which tenders may be sought. It can aid public and private owners in achieving success by ensuring that only qualified contractor is selected to execute the work. The findings results indicate that several of the criteria highlighted as the most influential criteria of contractor selection for construction project. Another important understanding from the research is that the developing the framework to show the most appropriate ways to select the best contractor for the project. The weightage of each criterion are effective for assessing the technical and commercial tender submission during the tender process. Analysis indicated the top 3 of most influential criteria for contractor selection for construction project in Klang Valley are participation in stakeholders bid process, good tender proposal and method of statement.

Buildings ◽  
2021 ◽  
Vol 12 (1) ◽  
pp. 26
Author(s):  
Mohammed Albattah ◽  
Amna Shibeika ◽  
Muhammad Sami Ur Rehman

The construction industry in the United Arab Emirates (UAE) is faced with negative project performance, including low productivity, higher costs, delays in project completion, and defects during construction. One of the main reasons for these issues is the engagement of unskilled craft workers. Despite these labor issues, demand for construction projects in the UAE has been explosively increasing, in part due to Dubai winning the hosting of Expo 2020, which has given rise to an unprecedented demand for skilled construction craft workers. This study aimed to investigate the views and experiences of construction project managers regarding the reasons and challenges associated with the hiring of skilled craft workers in the construction labor market of the UAE. To fulfill the study purpose, the authors conducted structured open-ended interviews with UAE construction project managers. The results revealed several reasons for hiring craft workers despite a clear lack of qualifications and suggest some potential solutions.


2021 ◽  
Vol 13 (12) ◽  
pp. 6933
Author(s):  
Aziz Naghizadeh Vardin ◽  
Ramin Ansari ◽  
Mohammad Khalilzadeh ◽  
Jurgita Antucheviciene ◽  
Romualdas Bausys

Sustainable development of any country to some extent depends on successful accomplishment of construction projects, particularly infrastructures. Contractors have a key role in the success of these projects. Hence, the selection of a competent contractor as a complicated and hard decision process has a vital importance in the destiny of any construction project. Contractor selection is in essence a multicriteria decision-making that ought to encompass so many aspects of the project and the client’s requirements on one hand and the capabilities and past records of the contractors on the other hand. Failure in selecting a competent contractor may cause time and cost overruns; quality shortcomings; increasing in claims, disputes and change orders; and even failure of the project. In spite of deficiencies of selecting a contractor by the rule of “the lowest bid price”, it still prevails in many countries including Iran. In this paper, a new contractor selection model based on the best-worst method (BWM) and well-known Fuzzy-VIKOR techniques is proposed as a solution to overcome the deficiencies of the traditional “lowest bid price” rule. An illustrative example of a water channel construction project verified the applicability of the proposed model in practice.


2020 ◽  
Vol 8 (3) ◽  
pp. 359-365
Author(s):  
Nor Haslinda Abas ◽  
Mohammad Hafiz Nurahim ◽  
Norazam Yasin ◽  
Muhamad Hanafi Rahmat

2017 ◽  
Vol 1 (1) ◽  
pp. 39-52
Author(s):  
Ibrahim Saidu ◽  
W Shakantu ◽  
A Adamu ◽  
I Anugwo

The problems of material waste and cost overruns are common in the construction industry. These problems occur at different stages of a construction project, from planning, design to project completion. The argument on how to eliminate cost overrun has been on-going for the past 70 years as on-site wastage of materials leads to increase in the final project cost. This paper examines the relationship between the causes of material waste and those of cost overrun at the pre-contract and post-contract stages of a project. The desktop methodological approach was firstly adopted in comparing the causes of material waste and those of cost overruns from the literature, in order to determine the possible relationship. Subsequently, interviews were purposively conducted with construction professionals within Abuja, Nigeria, in order to verify the literature based information. The result reveals that all the causes of material waste also cause cost overrun at the pre-contract and the post-contract stages of a project. 96.88% and 81.81% of the causes of cost overrun also cause material waste at the pre-contract and post-contract stages respectively. Other causes which are not related are mostly, the micro-economic and macro-economic factors. These results are not different from those of the interviews conducted with professionals and summarised in the tick box. It was also found that to achieve Effective Construction Material Waste Management (ECMWM) for any construction project, material waste must be controlled at its sources and causes, and at different stages of a project. Based on these findings, it can be concluded that effective management of material waste would translate into a reduction in the level of project cost overrun. The study recommends that construction-project managers, as well as the construction practitioners should encourage the management of material-waste causes, as it has the potential to minimise cost overrun for projects. 


2017 ◽  
Vol 15 (6) ◽  
pp. 803-825 ◽  
Author(s):  
Jeffrey Boon Hui Yap ◽  
Anna Lock

Purpose Knowledge management (KM) is the central know how for the construction industry. However, the delivery of construction projects is often plagued by schedule delays and cost overruns due to lack of working knowledge of project personnel. Hence, the need to appraise the practices of knowledge management in the construction industry has become all the more germane. This paper aims to determine the awareness of KM practices in Malaysia-based construction small and medium enterprises, and to investigate the benefits, tools and techniques, and challenges associated with knowledge management implementation so that effective measures can be devised to address them. Design/methodology/approach The research data were gathered using a structured questionnaire survey disseminated in the Klang Valley region in Malaysia. Responses were collected from 107 industry practitioners. The quantitative data are subjected to descriptive statistics, and the ranking with category of significance of the hypothesised variables is determined using the relative importance index (RII) technique. Findings The key benefits of KM practices are predominantly raising efficiency, quality, productivity and decision-making. The most preferred KM techniques are “face-to-face interaction”, “mentoring” and “documents and reports”. The highly significant tools are “groupware” and “telephone”. The major organisational issue hampering the implementation of knowledge management practices is “lack of motivation” while the critical cultural issue is relating to “bureaucracy and hierarchical”, and the vital people issue concerns “lack of trust”. Research limitations/implications The respondents were limited to only small and medium construction enterprises located in the Klang Valley region in Malaysia, which makes generalisation challenging. Practical implications KM provides not only a pragmatic but also a proactive approach to raising the competitive edge and capabilities of a construction company. Identification of the critical attributes of KM provides the basis for project managers in formulating KM strategies to enhance the chances of successful delivery of future projects. Originality/value The study contributes to the debate on the knowledge agenda in the construction industry, particularly from a fast developing economy’s perspective, where an effective KM can further contribute to realising a reasonable level of competitiveness operation.


2018 ◽  
Vol 33 ◽  
pp. 03010 ◽  
Author(s):  
Irina Zaychenko ◽  
Alexandra Borremans ◽  
Svetlana Gutman

The article describes the concept and types of administrative barriers encountered in various areas of the enterprise. The particularities of the Russian high-rise construction industry are described and a comparative analysis of administrative barriers in this sector is performed. The main stages and administrative procedures when the developers implement investment and construction projects in the field of high-rise construction are determined. The regulatory and legal framework for the implementation of investment and project activities in the high-rise construction industry has been studied and conclusions have been drawn on its low level of precision in the issue of the formation of competitive and efficient high-rise construction markets. The average number of administrative procedures for the implementation of the investment and construction project in the field of high-rise construction is determined. The factors preventing the reduction of administrative barriers in the high-rise construction industry are revealed.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Benti Gadisa ◽  
Hong Zhou

PurposeIt is well recognized that the construction industry is characterised by inefficient and ineffective service delivery due to various causative factors. Thus this study aims to examine the influential factors affecting public construction project performance in Ethiopia to improve the industry's service delivery.Design/methodology/approachFrom the extensive literature reviewed, 58 potential factors affecting construction project performance have been compiled. Based on the evidence accumulated, the conceptual model of this paper has been developed. By using survey questionnaires, valuable data were collected from the construction industry professionals in Ethiopia; analysed and interpreted with the use of both SPSS and AMOS software.FindingsIt is concluded that failure factors related to the “performance” of the contractor, the “capability” of the owner, the “project design-procurement process,” and project contract management can significantly contribute to the poor performance of public construction projects in Ethiopia. Ten key factors include inadequate contractor capacity, weak project site management and supervision, weak project management skills and capabilities of the owner, additional work orders, delayed payment, lack of comprehensive project plans between parties and incomplete project design, rising material prices, ineffective project schedules, and cost management, rising market prices and devaluation of the currency.Research limitations/implicationsThe scope of this study confined to public projects in Ethiopia. It suggests that further research needs to consider public and private construction from a comprehensive perspective in the developing countries.Practical implicationsIt provides practitioners with information and guidance on the factors that affect the performance of construction projects.Originality/valueIt provides inclusive evidence related to many factors that affect the performance of public construction projects.


2019 ◽  
Vol 277 ◽  
pp. 03013
Author(s):  
Noraziah Mohammad ◽  
Zabidi Hamzah

Variation order refers to any changes from the scope, plan, specification or contract document in the construction project. This changes of work is a common problem in construction projects in Malaysia. It is inevitable in any construction project and this problem can become more serious when variation order causes work progress to be impaired as a results it increased the construction time and cost that affects the construction industry in Malaysia. This paper critically review the causes of variation order in the construction industry on the double-storey terrace housing project in Malaysia. The discussions began with the construction industry in Malaysia and then related parties involved in the construction industry. The extensive local and abroad literature review on the definitions of variation order and analysis of past studies conducted on variation order and the previous study of the prediction model of variation. The extensive literature on variation order in the construction of building project may help to improve the performance in term of time, cost and quality of the construction of building projects in Malaysia.


2019 ◽  
Vol 9 (1) ◽  
pp. 282-291 ◽  
Author(s):  
Michał Tomczak

AbstractOne of the key problems in managing the realization of a construction project is the selection of appropriate working crews and coordinating their activities in a way that ensures the highest degree of implementation of defined goals (minimizing the project duration and/or reducing downtime and related costs). Most of the existing methods of work harmonization used in construction industry allow obtaining the desired results only in relation to the organization of the processes realization in repetitive linear projects. In case of realization of non-linear construction objects or construction units, it is usually necessary to choose between the reduction of the project implementation time and maintaining the continuity of crews work on the units. It was found that there is a lack in the literature of developed method enabling harmonization of crews’ work, while minimizing the downtime at work and the duration of the entire project taking into account additional constraints, e.g. the need to not exceed the deadlines for the realization of the project stages.The article presents the concept of a multi-criteria optimization method of harmonizing the execution of non-linear processes of a multi-unit construction project in deterministic conditions. It will enable the reduction of realization time and downtimes in work, taking into account the preferences of the decision maker regarding the relevance of the optimization criteria. A mathematical model for optimizing the selection of crews and order of completion of units in multi-unit construction projects was also developed. In order to present the possibility of usage of the developed concept, an example of the optimal selection of crews and their work schedule was solved and presented. The proposed method may allow for better use of the existing production potential of construction enterprises and ensure synchronization of the crews employed during the work, especially in the case of difficulties in acquiring qualified staff in construction industry.


2014 ◽  
Vol 548-549 ◽  
pp. 1587-1595
Author(s):  
Waled Alzober ◽  
Abdul Razak Yaakub

A complex or unstructured problem is based on multi criteria not on a single criterion. A contractor selection problem is a multi-criteria problem. A correct decision-making is required for selecting the appropriate contractor for a construction project. Selection of a contractor is a key decision made by clients and the process of selection a contractor has become an important issue in construction projects. Many multi-criteria techniques have been proposed and applied to such problems solution. This paper aims to propose integrated model for MCDM. The integrated model contains two stages. First stage integrates two MCDM methods are AHP and ANN to prepare a shortlist of the best alternatives. Second stage apply statistical model COP to choose the optimum alternative from the best alternatives in a shortlist. Proposed model for tendering system provides automated a decision-making process that reduces the time and manpower requirements for processing tender