scholarly journals Wood analyses helped to determine the location and approximate construction period of the Roman bridge over the Drava River in ancient Poetovio (Ptuj, Slovenia)

Les/Wood ◽  
2021 ◽  
Vol 70 (2) ◽  
pp. 71-85
Author(s):  
Andrej Gaspari ◽  
Katarina Čufar ◽  
Maks Merela

We present the results of a dendrochronological study and radiocarbon dating of the wooden piles of the bridge over the Drava River in Ptuj. The piles, together with stone elements (a fragment of an imperial building inscription and parts of the architectural decoration) were retrieved from the riverbed in 1913 and are now in the Regional Museum Ptuj - Ormož. Using dendrochronology, radiocarbon dating of carefully selected annual rings in the wood and calibration with the wiggle-matching method, the date of the last (outermost) annual ring on the pile was determined to be 161 ± 27 cal AD (1σ) or 160 ± 32 cal AD (2σ). Since the pile contained no sapwood, the dating approximately agrees with the date of the building inscription on the stone slab, which attributes the commission for the reconstruction or construction of the bridge to Emperor Hadrian in the last years of his reign (117-138 AD). The dating of the wood has thus confirmed that the remains examined do indeed belong to a Roman bridge, probably built or renovated during the reconstruction of the road network in the area of the colony of Poetovio under Hadrian or one of his successors.

2018 ◽  
Vol 7 (12) ◽  
pp. 472 ◽  
Author(s):  
Bo Wan ◽  
Lin Yang ◽  
Shunping Zhou ◽  
Run Wang ◽  
Dezhi Wang ◽  
...  

The road-network matching method is an effective tool for map integration, fusion, and update. Due to the complexity of road networks in the real world, matching methods often contain a series of complicated processes to identify homonymous roads and deal with their intricate relationship. However, traditional road-network matching algorithms, which are mainly central processing unit (CPU)-based approaches, may have performance bottleneck problems when facing big data. We developed a particle-swarm optimization (PSO)-based parallel road-network matching method on graphics-processing unit (GPU). Based on the characteristics of the two main stages (similarity computation and matching-relationship identification), data-partition and task-partition strategies were utilized, respectively, to fully use GPU threads. Experiments were conducted on datasets with 14 different scales. Results indicate that the parallel PSO-based matching algorithm (PSOM) could correctly identify most matching relationships with an average accuracy of 84.44%, which was at the same level as the accuracy of a benchmark—the probability-relaxation-matching (PRM) method. The PSOM approach significantly reduced the road-network matching time in dealing with large amounts of data in comparison with the PRM method. This paper provides a common parallel algorithm framework for road-network matching algorithms and contributes to integration and update of large-scale road-networks.


2017 ◽  
Vol 2017 ◽  
pp. 1-14 ◽  
Author(s):  
Md. Shohel Reza Amin ◽  
Umma Tamima ◽  
Luis Amador Jimenez

This study demonstrates through a case study that detailed analyses, even after the construction of a project, are feasible using current technologies and available data. A case study of highway 25 is used to illustrate the method and verify the levels of air contaminants from additionally induced traffic during and after the construction of highway. Natural traffic growth was removed from the effect of observed gas emissions by comparing observed levels on other further locations in the same metropolitan area. This study estimates air pollution from the additional traffic during and after the construction of A-25 extension project. NO2 levels were spatially interpolated during peak and off-peak hour traffic and traffic density simulated on the road network for four scenarios. Comparing the four scenarios, it was found that levels of NO2 concentrations were reduced at neighbor areas due to less traffic during the construction period. Levels of NO2 after the construction were higher than those in 2008. The simulated traffic density for four scenarios revealed that traffic density was significantly increased on both arterial and access roads within the close vicinity of the extension project during and after its construction.


2017 ◽  
Vol 11 (3) ◽  
pp. 255
Author(s):  
Jeky El Boru

Abstract: This research aims to analyze the impact of Janti Flyover Construction toward the growth of layout at Janti Urban Area, including structured space, open space, and linkage. Method used for data collecting are observation, air photograph monitoring, and interview, whereas the analysis method is qualitative description, which is the superimposed method of two layers, that are the layout condition before and after flyover construction. The result shows that the impact of Janti Flyover construction can be seen on building mass (solid), the increasing number of open spaces, including the road network, parking place, and park, whereas the relation between spaces, visually and structurally, can be seen on the growth of buildings which have new shapes and styles, therefore the performance of the overall building does not have a proportional shape. Considering Janti Street at the collective relation, its role is getting stronger as the main frame road network.Keywords: Flyover construction, layout changing, Janti AreaAbstrak: Penelitian ini bertujuan untuk menganalisis pengaruh pembangunan Jalan Layang Janti terhadap perkembangan tata ruang Kawasan Janti, meliputi ruang terbangun, ruang terbuka, serta hubungan antar ruang (“linkage”). Metode pengumpulan data dilakukan melalui observasi, pengamatan foto udara, dan wawancara; sedangkan metode analisis melalui deskripsi secara kualitatif yang berupa “superimposed method” dari dua lapisan kondisi lahan, yakni kondisi tata ruang sebelum dan sesudah pembangunan jalan layang. Hasil penelitian menunjukkan bahwa pengaruh pembangunan Jalan Layang Janti terdapat pada massa bangunan (“solid”), pertambahan ruang terbuka yang berupa jaringan jalan, parkir, dan taman; sedangkan pada hubungan antar ruang ̶ secara visual dan struktural ̶ yakni tumbuhnya bangunan dengan bentuk dan gaya baru, sehingga bentuk tampilan bangunan secara keseluruhan tidak proporsional. Pada hubungan kolektif, Jalan Janti semakin kuat perannya sebagai kerangka utama jaringan jalan.Kata kunci : Pembangunan jalan layang, tata ruang, Kawasan Janti


Author(s):  
Oleksandra Cherednichenko ◽  

The results of the study of the main elements of unobstructed space are presented and the compliance of the actual state with the regulatory requirements of measures to ensure a safe, comfortable, accessible and informative pedestrian zone of the road network is analyzed. A comparative analysis of the main regulatory requirements for access ramps on the legislation of Ukraine and the European Union is carried out.


2016 ◽  
Vol 167 (5) ◽  
pp. 294-301
Author(s):  
Leo Bont

Optimal layout of a forest road network The road network is the backbone of forest management. When creating or redesigning a forest road network, one important question is how to shape the layout, this means to fix the spatial arrangement and the dimensioning standard of the roads. We consider two kinds of layout problems. First, new forest road network in an area without any such development yet, and second, redesign of existing road network for actual requirements. For each problem situation, we will present a method that allows to detect automatically the optimal road and harvesting layout. The method aims to identify a road network that concurrently minimizes the harvesting cost, the road network cost (construction and maintenance) and the hauling cost over the entire life cycle. Ecological issues can be considered as well. The method will be presented and discussed with the help of two case studies. The main benefit of the application of optimization tools consists in an objective-based planning, which allows to check and compare different scenarios and objectives within a short time. The responses coming from the case study regions were highly positive: practitioners suggest to make those methods a standard practice and to further develop the prototype to a user-friendly expert software.


2019 ◽  
Vol 13 (3) ◽  
pp. 235-240
Author(s):  
Iryna Solonenko

The development of road network infrastructure is an important component of the economic development of the European Union. Updating of the road network contributes to the integration of the economies of countries into a coherent whole. The road network provides the free movement of citizens, the movement of goods and the effective implementation of various services. The increase in the length of the road network leads to an increase in the financial and material costs necessary to ensure its maintenance and repair. One of the ways to reduce costs is by strengthening the physic-mechanical and operational characteristics of the pavement due to the widespread use of cement concrete. The quality of the pavement of cement concrete depends largely on the rational selection of its composition. This allows a significant increase in the durability of road pavement. The purpose of the research was: the development of recommendations for the rational selection of the composition of the road pavement material of cement concrete, aimed at upgrading longevity, and taking into account its frost resistance grade. According to the goal, the following tasks were developed: the analyses of the climatic zones in which the road network of the European Union is located; the development of a research plan, a selection of the response function and influence factors; the study of physico-mechanical and operational characteristics of the researched material of road pavement; on the basis of the obtained data, the calculation of the complex of experimental-statistical models, which describe the physico-mechanical and operational characteristics of the road pavement material; on the basis of experimental statistical models, a method was proposed for selecting the rational compositions of the cement concrete pavement road material depending on the conditions of its application. The results presented in the article can be used in engineering and scientific practice for the selection of road pavement from cement concrete for highways.


Complexity ◽  
2020 ◽  
Vol 2020 ◽  
pp. 1-15 ◽  
Author(s):  
Tinggui Chen ◽  
Shiwen Wu ◽  
Jianjun Yang ◽  
Guodong Cong ◽  
Gongfa Li

It is common that many roads in disaster areas are damaged and obstructed after sudden-onset disasters. The phenomenon often comes with escalated traffic deterioration that raises the time and cost of emergency supply scheduling. Fortunately, repairing road network will shorten the time of in-transit distribution. In this paper, according to the characteristics of emergency supplies distribution, an emergency supply scheduling model based on multiple warehouses and stricken locations is constructed to deal with the failure of part of road networks in the early postdisaster phase. The detailed process is as follows. When part of the road networks fail, we firstly determine whether to repair the damaged road networks, and then a model of reliable emergency supply scheduling based on bi-level programming is proposed. Subsequently, an improved artificial bee colony algorithm is presented to solve the problem mentioned above. Finally, through a case study, the effectiveness and efficiency of the proposed model and algorithm are verified.


Sign in / Sign up

Export Citation Format

Share Document