scholarly journals Integrated Project Delivery Implementation Challenges in the Construction Industry

2019 ◽  
Vol 5 (8) ◽  
pp. 1672-1683 ◽  
Author(s):  
Zahra Kahvandi ◽  
Ehsan Saghatforoush ◽  
Ahad ZareRavasan ◽  
Christopher Preece

Huge financial resources are spent in the construction industry all over the world, which are frequently wasted largely due to a lack of proper planning. In recent decades, in an attempt to overcome challenges, various contractual and administrative systems have been used by construction owners/clients. One such system has been Integrated Project Delivery (IPD). Its implementation has, however, experienced drawbacks. Identifying such drawbacks is an initial step in attempting to resolve them, and this paper aims to identify and prioritize the IPD implementation drawbacks in the context of the Iranian construction industry. A comprehensive list of IPD implementation drawbacks is prepared using a questionnaire survey. An in-depth literature review of the IPD concept has been combined with a review of various case studies applying the IPD system. The results were analyzed using the Robust Exploratory Factor Analysis (EFA) method. 22 drawbacks in the Construction Industry were categorized under four themes; contractual, environmental, managerial, and technical. Results show that contractual drawbacks are the most significant. The implication of this research is that identifying and classifying IPD implementation drawbacks provides a useful reference to managers and owners of the construction industry, for identifying and codifying solutions to overcome them.

2019 ◽  
Vol 26 (10) ◽  
pp. 2432-2446
Author(s):  
Seoung-Wook Whang ◽  
Kenneth Sungho Park ◽  
Sangyong Kim

Purpose The purpose of this paper is to identify the critical success factors (CSFs) to implement integrated project delivery (IPD) systems in the Korean construction industry. Design/methodology/approach This study categorized potential CSFs and analyzed them using factor analysis and multiple regression analysis to choose the best ones based on responses from Korean construction experts. Findings In total, 29 potential factors were selected and categorized into 7 CSFs using factor analysis. Originality/value The outcomes of the study are useful as a reference for applying the IPD system in different developing countries and mid-sized construction industries.


2016 ◽  
Vol 2016 ◽  
pp. 1-7 ◽  
Author(s):  
William Paolillo ◽  
Branka V. Olson ◽  
Edward Straub

People-centered innovation is a paradigm shift in the construction industry. It is derived from the supposition that people not methods, schedules, or budgets deliver projects. Our data suggest that a multilevel, multidisciplinary project team through shared vision, values, and a common vernacular defines, designs, and delivers more successful projects than traditional methods. These projects meet the needs of shareholders, the community, stakeholders, and the planet. We employ the concepts of emotional intelligence and agency theory to explain an integrated project delivery (IPD) construction project using lean tactics that not only delivered, but also exceeded expectations resulting in a six-month schedule acceleration and $60M savings over the original estimated cost of the project calculated assuming traditional project delivery methods. The safety rating for this project was 50% better than the national average and the expected improvement in operating margin for the new building is 33% greater. This paper introduces the notion of people-centered innovation to an industry that has struggled to adapt and show positive results over recent decades. Our case study describes the significance of people-centered innovation in construction project delivery. We discuss the implications for the construction industry going forward.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Ayman Ahmed Ezzat Othman ◽  
Lamis Yasser Wagih Youssef

Purpose This paper aims to develop a framework for implementing the integrated project delivery (IPD) approach during the design process in architecture design firms (ADFs) in Egypt. Design/methodology/approach A research methodology consists of literature review, case studies and survey questionnaire was designed to achieve the abovementioned aim. First, literature review was used to identify and categorise the challenges of implementing IPD during the design process. Second, four case studies were analysed to investigate the values delivered to the client or missed due to the use of IPD or traditional procurement approaches, respectively. Finally, a survey questionnaire was carried out with a representative sample of ADFs in Egypt to investigate their perception towards the challenges of IPD implementation in Egypt. Based on the results of the above, the research developed a framework to facilitate the implementation of IPD in ADFs in Egypt. Findings Through literature review, the research identified 30 challenges that hamper the implementation of IPD in ADFs. These challenges were categorised due to their nature into five groups, namely, integration, cooperation, commitment and trust challenges, knowledge, experience skills and decision-making challenges, cultural challenges, legal and contractual challenges and technical and financial challenges. Results of data analysis showed that “poor communication and spirit of collaboration between project stakeholders” was ranked the highest influential challenge as IPD is based on collaboration and trust between project participants. In addition, “lack of training and motivation in investing for using IPD” was ranked the lowest influential challenge due to the poor attention paid to training in the construction industry. Moreover, despite the benefits of IPD implementations in many countries worldwide, it is not implemented in the Egyptian context. This necessitated taking action towards developing a framework to facilitate IPD implementation in ADFs in Egypt. Research limitations/implications The research focussed on ADFs in Egypt. Practical implications Adopting the proposed framework developed through this research will help implementing IPD during the design process in ADFs. Originality/value The research identified, categorised and analysed the challenges that obstruct the implementation of IPD in ADFs. The research tackled a topic that received scant attention in construction literature in the Middle East generally and Egypt in particular. In addition, this paper presented a framework to facilitate the implementation of IPD during the design process, which represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.


2020 ◽  
Vol 30 (06) ◽  
Author(s):  
VIET THANH NGUYEN ◽  
SOO-YONG KIM ◽  
VAN TRUONG LUU

Nowadays, Value Engineering (VE) is being widely practiced in many countries around the world. However, its concepts and applications do not seem to be well embraced in the Vietnamese construction industry. This study aims to seek solutions for promoting the development of VE in the Vietnamese construction industry. Most of the previous studies gave solutions in deficiencies and lack of analysis. On the basis of literature review and interviews with experts during the pilot test of the study at the initial stage, fifteen solutions were identified. A questionnaire survey was then conducted to rate the effective degree of the fifteen solutions. This study revealed six most effective solutions that should be taken with first priorities to promote the VE development. Additionally, the factor analysis method was applied to investigate the correlation effects of the solutions, which resulted in four core factors representing the solutions, namely, positive interest from government and construction stakeholders; education about VE; presence of VE organizations in the construction industry; and interaction with the outside world. The findings of the study are expected to bring the most effective solutions to promote the development of VE in the Vietnamese construction industry.


2012 ◽  
Vol 621 ◽  
pp. 370-374
Author(s):  
Jia Ying Teng ◽  
Xian Guo Wu ◽  
Ge Qian Zhou ◽  
Wei Jia Zhao ◽  
Jing Cao

In the last few years, in order to solve the problems of traditional delivery mode in construction industry, such as over budget, project delay and so on, Integrated Project Delivery (IPD) as an effective solution has become a hot spot in China and abroad. IPD with special implementation of process has many advantages compared with the traditional delivery mode. In this paper, the modeling strategy of BIM in IPD project is proposed, and the application of BIM in all stages of IPD on basis of engineering project is analyzed. The study provides foundation for the further collaboration application of IPD with BIM.


2019 ◽  
Vol 9 (1) ◽  
pp. 2-11
Author(s):  
Zahra Kahvandi ◽  
Ehsan Saghatforoush ◽  
Mohammad Mahoud ◽  
Christopher Preece

Abstract The right selection of implementation system for projects in the construction industry is critical to achieve success. Integrated Project Delivery (IPD), is a comprehensive implementation system which has in recent years been seen to play an effective role in projects improved efficiency. Implementing an IPD system to resolve various problems of traditional systems is very important; however there are several barriers to its implementation. In addition, rooting and classifying the barriers is very significant in being able to resolve them. The aim of this study is the identification of barriers to IPD basically extracted from existing case studies. In this research, the meta-synthesis qualitative method is used for identifying and classifying the IPD barriers. The results are presented in a comprehensive table, and then are illustrated as a pattern by using macro concepts. This pattern is useful for presenting barriers to IPD. Identifying the barriers and resolving them are as important as identifying the benefits of IPD in creating motivation for construction industry owners. They also serve to provide the context for required predictions in implementing this approach in the construction industry.


2016 ◽  
Vol 22 (5) ◽  
pp. 1331-1335 ◽  
Author(s):  
Syukran Abdul Rahim ◽  
Mohd Nasrun Mohd Nawi ◽  
Faizatul Akmar Abdul Nifa