scholarly journals Impact of due dates for complex product engineering change based on capability constraints

Author(s):  
HuaiGuo Zhang ◽  
Xiang Su ◽  
ZhiYing Wang
2021 ◽  
Vol 16 (2) ◽  
pp. 185-198
Author(s):  
W.M. Yang ◽  
C.D. Li ◽  
Y.H. Chen ◽  
Y.Y. Yu

Change impact evaluation of complex product plays an important role in controlling change cost and improving change efficiency of engineering change enterprises. In order to improve the accuracy of engineering change impact evaluation, this paper introduces three-parameter interval grey number to evaluate complex products according to the data characteristics. The linear combination of BWM and Gini coefficient method is used to improve the three-parameter interval grey number correlation model. It is applied to the impact evaluation of complex product engineering change. This paper firstly constructs a multi-stage complex network for complex product engineering change. Then the engineering change impact evaluation index system is determined. Finally, a case analysis was carried out with the permanent magnet synchronous centrifugal compressor in a large permanent magnet synchronous centrifugal unit to verify the effectiveness of the proposed method.


2021 ◽  
Author(s):  
Weiming Yang ◽  
Congdong Li ◽  
Yinyun Yu ◽  
Bingjun Li

Abstract Change impact evaluation of complex product plays an important role in controlling change cost and improving change efficiency of engineering change enterprises. In order to improve the accuracy of change impact evaluation,this paper firstly expresses engineering changes based on multi-stage complex networks. Then, it constructs the evaluation index system of complex product engineering change impact. Next, based on the combination weighted three-parameter grey relational model, the engineering change impact of complex product is evaluated. Finally, a case analysis was carried out with the permanent magnet synchronous centrifugal compressor in a large permanent magnet synchronous centrifugal unit to verify the effectiveness of the proposed method.


2021 ◽  
pp. 1-18
Author(s):  
Congdong Li ◽  
Weiming Yang ◽  
Yinyun Yu ◽  
Bingjun Li

In the process of product development, the identification and evaluation of important nodes is of great significance for the effective control of complex product engineering change. In order to identify and evaluate important nodes accurately, this paper proposes a method to evaluate the importance of complex product nodes. Firstly, an engineering change expression method based on multi-stage complex network is proposed. Then, the evaluation index system of important nodes of complex products is constructed. A three parameter grey relational model based on subjective and objective weights is proposed to identify and evaluate the important nodes of complex products. Finally, an example of a large permanent magnet synchronous centrifugal compressor is analyzed. The example shows that the top nodes are node 4, 1, 7, 9 and 24. Compared with other experiments, the proposed method can effectively and reasonably evaluate the node importance of complex products.


2011 ◽  
Vol 308-310 ◽  
pp. 2319-2327
Author(s):  
Wei Qing Ling ◽  
Jian Wang

In view of the issues of computational method combined execution that need parameters transfer in the process of complex product engineering analysis, the execution principle and parameter file formats of computational method are discussed. Through parsed the computational parameters, the mapping relationship among multi-computational methods are established and parameters passing between computational methods is realized. A product design analysis environment system, called PDAE, is developed. With the application of PDAE in the analysis process for CFB boiler and turbo-generator, the feasibility and validity of the approach proposed is demonstrated.


2015 ◽  
Vol 220-221 ◽  
pp. 995-1000
Author(s):  
Augustinas Maceika ◽  
Bronius Jančiauskas

The authors of the article carried out the analysis of the teaching need for the subject of engineering change at Vilnius Gediminas Technical University. The conducted investigation was based on evaluating the situation of the engineering change process and on innovative knowledge in the field. The examination of literature sources and the results of expert evaluation pointed out a number of activities to support the engineering change process. The activities must be provided with relevant innovative knowledge. Recent engineering changes are related to product and process innovations when the new functions and purposes of product development can be, in many cases, achieved through designing mechatronic systems and introducing new materials to improve the product. Engineering change management is important for designing and producing products. For this reason, the modules of study programmes in this particular field give more knowledge and abilities for the students.


Author(s):  
D.S. Patrick ◽  
L.C. Wagner ◽  
P.T. Nguyen

Abstract Failure isolation and debug of CMOS integrated circuits over the past several years has become increasingly difficult to perform on standard failure analysis functional testers. Due to the increase in pin counts, clock speeds, increased complexity and the large number of power supply pins on current ICS, smaller and less equipped testers are often unable to test these newer devices. To reduce the time of analysis and improve the failure isolation capabilities for failing ICS, failure isolation is now performed using the same production testers used in product development, multiprobe and final test. With these production testers, the test hardware, program and pattern sets are already available and ready for use. By using a special interface that docks the production test head to failure isolation equipment such as the emission microscope, liquid crystal station and E-Beam prober, the analyst can quickly and easily isolate the faillure on an IC. This also enables engineers in design, product engineering and the waferfab yield enhancement groups to utilize this equipment to quickly solve critical design and yield issues. Significant cycle time savings have been achieved with the migration to this method of electrical stimulation for failure isolation.


Sign in / Sign up

Export Citation Format

Share Document