scholarly journals Application of Bionic Technologies on the Fracturing Plug

Biomimetics ◽  
2019 ◽  
Vol 4 (4) ◽  
pp. 78
Author(s):  
Lin Chen ◽  
Ran Wei ◽  
Songbo Wei ◽  
Xinzhong Wang

The dissolvable bridge plug is one of the most important tools for multi-stage hydraulic fracturing in the field of oil/gas development. The plug provides zonal isolation to realize staged stimulation and, after fracturing, the plug is fully dissolved in produced liquids. A bionic surface was introduced to improve the performance of the plug. Surface dimples in the micron dimension were prepared on the dissolvable materials of the plug. The experimental results showed that the surface dimples changed the hydrophilic and hydrophobic properties of the dissolvable materials. The dissolution rate has a great relation with the parameters of the dimples and can be controlled by choosing the dimples’ parameters to some degree.

2020 ◽  
pp. 38-48
Author(s):  
E. V. Panikarovskii ◽  
V. V. Panikarovskii ◽  
M. M. Mansurova ◽  
M. V. Listak

The development of deep-lying Achimov deposits makes it possible to extract additional volumes of gas and gas condensate in the fields with decreasing production, as well as implement strategies to introduce new methods to increase oil, gas and condensate production. The decrease in well productivity during the development of gas condensate fields requires the use of new methods of intensification of production. The main method for increasing the productivity of Achimov wells is hydraulic fracturing. The choice of hydraulic fracturing technology for low-permeability Achimov deposits is especially important for creating large hydraulic fractures and high permeability, as well as maintaining the filtration characteristics of reservoir rocks. Multi-stage hydraulic fracturing is the most effective method of intensifying gas and gas condensate production in the development of the Achimov deposits.


2021 ◽  
Author(s):  
Aleksander Valerievich Miroshnichenko ◽  
Valery Alekseevich Korotovskikh ◽  
Timur Ravilevich Musabirov ◽  
Aleksei Eduardovich Fedorov ◽  
Khakim Khalilovich Suleimanov

Abstract The deterioration of the reservoir properties of potential oil and gas bearing areas on mature and green fields, as well as the increase in the volume of hard-to-recover reserves on low-permeable reservoirs set us new challenges in searching and using effective development technologies to maintain and even increase the oil production levels. Based on successful international experience, Russian oil and gas companies use horizontal wells (HW) with multi-stage hydraulic fracturing (MSHF) for the cost-effective development of low-permeable reservoirs. Thus, since the first pilot works of drilling technologies and completion of HW with MSHF in 2011, at the beginning of 2020, over 1,200 HW with MSHF were drilled and came on stream at the fields of LLC RN-Yuganskneftegaz, about half of which are at the exploitation play AS10-12 of the northern license territory (NLT) of the Priobskoye field. In searching the best technologies and engineering solutions, the company tested different lengths of horizontal section of HW, the number of hydraulic fracturing (HF) stages and distances between hydraulic fracturing ports, as well as different specific mass of the proppant per frac port. Recently, there has been a tendency in design solutions to increase the length of the HWs and the number of hydraulic fractures with a decreasing distance between the frac ports and a decreasing specific mass of the proppant per frac port. This work studies the actual and theoretical efficiency of HW with MSHF of various designs (different lengths of horizontal section of HW and the number of HF stages) and to assess the viability of increasing the technological complexity, as well as to analyze the actual impact of loading the proppant mass per port on performing HW with MSHF. The study is based on the results of the analysis of the factual experience accumulated over the entire history of the development of the exploitation play AS10-12 of the NLT of the Priobskoye field of the Rosneft Company. In studying the viability of increasing the technological complexity, especially, increasing the length of horizontal section of HW, increasing the number of HF stages, and reducing the distance between the frac ports: we discovered the typical methodological errors made in analyzing the efficiency of wells of various designs; we developed the methodology for analysis of the actual multiplicity of indicators of wells of various designs, in particular, HW with MSHF relative to deviated wells (DW) with HF; we carried out the statistical analysis of the actual values of the multiplicity of performance indicators and completion parameters of HW with MSHF of various designs relative to the surrounding DW with HF of the exploitation play AS10-12 of the NLT of the Priobskoye field; we performed the theoretical calculation of the multiplicity of the productivity coefficient for the HW with MSHF of various designs relative to DW with HF for the standard development system of the exploitation play AS10-12 of the NLT of the Priobskoye field; we compared the actual and theoretical results. The paper also presents the results of studying the actual effect of changes of proppant's mass per port on performance indicators of HW with MSHF of the same design and with an increase in the number of fractures of the hydraulic fracturing without changing the length of horizontal section of HW. As for performance indicators, being the basis for estimating the efficiency of HW with MSHF of various designs, we used the productivity index per meter of the effective reservoir thickness and the cumulative fluid production per meter of the effective reservoir thickness per a certain period of operation. And as the completion parameters, we used the length of the horizontal section of HW, the number of HF stages, the distance between the frac ports, and the specific mass of the proppant per meter of the effective reservoir thickness per frac port. The results of this work are the determining vector of development for future design decisions in improving the efficiency of HW with MSHF.


2021 ◽  
Author(s):  
Ebikebena M. Ombe ◽  
Ernesto G. Gomez ◽  
Aldia Syamsudhuha ◽  
Abdullah M. AlKwiter

Abstract This paper discusses the successful deployment of Multi-stage Fracturing (MSF) completions, composed of novel expandable steel packers, in high pressure, high temperature (HP/HT) horizontal gas wells. The 5-7/8" horizontal sections of these wells were drilled in high pressure, high temperature gas bearing formations. There were also washed-outs & high "dog-legs" along their wellbores, due to constant geo-steering required to keep the laterals within the hydrocarbon bearing zones. These factors introduced challenges to deploying the conventional MSF completion in these laterals. Due to the delicate nature of their packer elastomers and their susceptibility to degradation at high temperature, these conventional MSF completions could not be run in such hostile down-hole conditions without the risk of damage or getting stuck off-bottom. This paper describes the deployment of a novel expandable steel packer MSF completion in these tough down-hole conditions. These expandable steel packers could overcome the challenges mentioned above due to the following unique features: High temperature durability. Enhanced ruggedness which gave them the ability to be rotated & reciprocated during without risk of damage. Reduced packer outer diameter (OD) of 5.500" as compared to the 5.625" OD of conventional elastomer MSF packers. Enhanced flexibility which enabled them to be deployed in wellbores with high dog-leg severity (DLS). With the ability to rotate & reciprocate them while running-in-hole (RIH), coupled with their higher annular clearance & tolerance of high temperature, the expandable steel packers were key to overcoming the risk of damaging or getting stuck with the MSF completion while RIH. Also, due to the higher setting pressure of the expandable steel packers when compared to conventional elastomer packers, there was a reduced risk of prematurely setting the packers if high circulating pressure were encountered during deployment. Another notable advantage of these expandable packers is that they provided an optimization opportunity to reduce the number of packers required in the MSF completion. In a conventional MSF completion, two elastomer packers are usually required to ensure optimum zonal isolation between each MSF stage. However, due to their superior sealing capability, only one expandable steel packer is required to ensure good inter-stage isolation. This greatly reduces the number of packers required in the MSF completion, thereby reducing its stiffness & ultimately reducing the probability of getting stuck while RIH. The results of using these expandable steel packers is the successful deployment of the MSF completions in these harsh down-hole conditions, elimination of non-productive time associated with stuck or damaged MSF completion as well as the safe & cost-effective completion in these critical horizontal gas wells.


2013 ◽  
Author(s):  
Andy Sookprasong ◽  
Sergey Mikhalovich Stolyarov ◽  
Mark Sargon

Author(s):  
Bin Chen ◽  
Beatriz Ramos Barboza ◽  
Yanan Sun ◽  
Jie Bai ◽  
Hywel R Thomas ◽  
...  

AbstractAlong with horizontal drilling techniques, multi-stage hydraulic fracturing has improved shale gas production significantly in past decades. In order to understand the mechanism of hydraulic fracturing and improve treatment designs, it is critical to conduct modelling to predict stimulated fractures. In this paper, related physical processes in hydraulic fracturing are firstly discussed and their effects on hydraulic fracturing processes are analysed. Then historical and state of the art numerical models for hydraulic fracturing are reviewed, to highlight the pros and cons of different numerical methods. Next, commercially available software for hydraulic fracturing design are discussed and key features are summarised. Finally, we draw conclusions from the previous discussions in relation to physics, method and applications and provide recommendations for further research.


2021 ◽  
Author(s):  
Peter Levison Mwansa ◽  
Esha Narendra Varma ◽  
Victor Jose Aguilar ◽  
Alexander Amorocho ◽  
Daniel McPherson ◽  
...  

Abstract Inability to effectively isolate depleted aquifer formations due to severe losses during cementation leads to accelerated corrosion of the production casing. Per current practice, a top job is performed from surface to fill the annulus with cement, but with limited success in a severe losses’ scenario. The objective is to improve zonal isolation by applying V0 rated multiple stage cementation technology with inner string thus enhancing well integrity during the life cycle of the well. A metal expandable annular sealing system was selected as a reliable isolation mechanism for effective cementation behind aquifers due to its ability to provide high expansion in potentially washed-out wellbores and the feature of long multi-element sealing systems with built in redundancy. The inner string operated stage cementing system provides a reliable solution to selectively and accurately place cement above the metal expandable packer whilst maintaining V0 casing integrity once closed. Additionally, the unique combination of technologies provides a cost-effective life of well solution compared to current stage cementing methodologies. Following successful execution of three trial jobs, the multi-stage cement using V0 rated tools and an inner string was compared to similar jobs done per current cementing practices. Analysis involved reviewing the cement bond column coverage and quality (CBL) with offset wells. Cement bond log results showed that this technique enhanced the cement column quality behind the 9 5/8" casing across the aquifer zones with moderate to good cement for the most part. Contaminated cement was observed just below the previous casing shoe and this could be addressed by adding another stage tool just above the previous casing shoe. Overall results show improved cement column quality for this section when compared to conventional jobs with similar conditions and is recommended for future use in severe to total losses scenario. In a situation where losses are seen at the previous casing shoe, a three-stage job is recommended. Other benefits include: Security and confidence in gas tight sealing capability and mechanical integrity Precise and conclusive operation for open, close and lock with no risk of accidental lock Ability to squeeze cement below the metal expandable packer No reduction in pressure rating regardless of OH ID and full bore ID of casing No post operation drill out required of the stage tools V0 stage cementing tools with inner string and metal expandable annular sealing system are not available on Oil & Gas market as a single tool. Therefore, this combined technology application of solutions from different technology providers to access a dedicated solution is totally novel and creates an opportunity for future applications across the industry.


2021 ◽  
pp. 52-62
Author(s):  
V. P. Ovchinnikov ◽  
O. V. Rozhkova ◽  
S. N. Bastrikov ◽  
D. S. Leontiev ◽  
P. V. Ovchinnikov

The article discusses the main technological processes of well construction for the production of high-viscosity hydrocarbons from productive lowporosity reservoirs with high temperature and pressure conditions, which include shale deposits of Bazhenov formation. According to the results of the review and analysis of existing solutions in the development of this deposits, the following measures were justified and proposed: construction of branched multi-hole azimuth horizontal wells, implementation of selective multi-stage hydraulic fracturing in the productive formation; the use of oil-based process fluids when opening the reservoir, the use of plugging materials for isolation of the reservoir, the hardening product of which is represented by thermally stable hydrate phases (hydrobasic hydrosilicates). Вranched wells have a long horizontal end (about 1 000 meters or more). Only a part of the horizontal section works effectively, which is the basis for the development and application of the staged, both in time and along the strike, hydraulic fracturing method. At the level of the invention, a method and apparatus for carrying out multistage selective hydraulic fracturing in wells with horizontal completion have been developed. The article describes a method for implementing multistage selective hydraulic fracturing, comparing this method with the existing ones. Much attention is given to the need to use hydrocarbon-based solutions for the initial opening the reservoir, to use cement slurries from composite materials to separate the reservoir, the hardening product of which is a stone formed by low-basic calcium hydrosilicate.


Sign in / Sign up

Export Citation Format

Share Document