scholarly journals The Influence on Contaminant Bioavailability and Microbial Abundance of Lake Hongze by the South-to-North Water Diversion Project

Author(s):  
Yu Yao ◽  
Peifang Wang ◽  
Chao Wang

The world famous South-to-North Water Transfer Project was built to alleviate serious water shortages in northern China. Considering that lake Hongze is an important freshwater lake in this region, analyzing the influence of water diversion on typical contaminant bioavailability and microbial abundance could aid in achieving a good overall understanding of hydrodynamic variation. Accordingly, in situ high-resolution measurements of diffusive gradients in thin films (DGT) and next-generation high-throughput sequencing were combined in order to survey Lake Hongze and determine the relationship between environmental factors and microbial communities. The DGT method effectively obtained more than the 85% of bioavailable concentrations of the corresponding contaminants; the results showed that labile P, S, Fe, As, and Hg concentrations were higher in areas influenced by water transfer. Moreover, the relative abundance and alpha diversity of the sampling sites distributed in the water transfer area differed significantly from other sites. The pH, conductivity, and labile Mn, As, and P were shown to be the primary environmental factors affecting the abundance and diversity of microbes. With the exception of bioturbation-affected sites controlled by labile Mn and pH, sites distributed in the water diversion area were most affected by As and conductivity, with little spatial discrepancy. Furthermore, site 2, with higher bioturbation abundance, and site 10, with stronger hydrodynamics, had low alpha diversity compared to the other sites. Consequently, the bioavailability of typical contaminants such as P, S, As, Hg, Fe, Mg, Cd, Pb, and Mn, as well as the diversity and abundance of microbial in the sites influenced by the water diversion, were significantly different to the other sites. Thus, the impacts of the South-to-North Water Transfer Project on participant lakes were non-negligible overall in the investigation.

Author(s):  
Mengdi Li ◽  
Yaoping Cui ◽  
Yaochen Qin ◽  
Zhifang Shi ◽  
Nan Li ◽  
...  

The South-to-North Water Diversion (SNWD) provides significant benefits in facilitating water security and improving ecology in northern China. However, few studies have estimated the water value of the SNWD and the corresponding subsequent subsidies of the ecological migrants in Xichuan County displaced by the project. Based on the Google Earth Engine (GEE), this study analyzed the water ecosystem changes in Xichuan County in 2000–2020 and valued the water transfer of the SNWD. We calculated the water cost, the water value of the trunk line project, and the four provinces (Hebei, Henan, Beijing, and Tianjin) of CNY 4.04, 39.64, and 120.93 billion, respectively, and the proportion of the three was 1:10:30 during 2014–2020. The water ecosystem area showed a rapid increase when the SNWD became operational since the end of 2014. The subsequent annual subsidy gap of ecological migrants was CNY 0.84 billion, which only accounted for 4.31% of the gross profit of SNWD. Our results imply that relevant water sectors have sufficient profits to support corresponding subsequent subsidies for ecological migrants. Ecological migrants are a major challenge for water transfer projects. Overall, this study fills a gap of interactions between subsequent policies and ecological migrants and provides a typical case for managing the migration problem caused by sustainable water management worldwide.


2014 ◽  
Vol 919-921 ◽  
pp. 1248-1251
Author(s):  
Xiao Cheng Su ◽  
Zhi Liu ◽  
Xiao Yun Wang

The South-to-North Water Transfer Project is a cross century water diversion project. So it is very important to ensure its normal operation. The hydraulic calculation of Jiping Canal of the South-to-North Water Transfer Project is carried out in this paper, working out cross section, the profile and the X-Y-Z perspective plot of Jiping Canal respectively. An analysis of the canal stability enables us to get the condition in which the canal is stable, which will provide strong technical support for the design and construction of the canal. Therefore, the analysis has important practical significance. The study will be effective guidance on the normal operation of Jiping Canal of South-to-North Water Transfer Project.


2021 ◽  
Vol 13 (24) ◽  
pp. 13600
Author(s):  
Yan Long ◽  
Youming Li ◽  
Xiaohui Lei ◽  
Yikai Hou ◽  
Shuang Guo ◽  
...  

The implementation of water diversion projects will exert different influences on upstream water offering areas and the downstream water receiving areas. In order to effectively promote the coordinated development of the two regions, a comprehensive evaluation system for the coordinated development of water transfer projects has been proposed with the Middle Route of the South-to-North Water Transfer Project as the research object. The system conducts a multidimensional evaluation of social development, economic development, and ecological environmental impact, and builds a comprehensive evaluation index system with fifteen evaluation indexes at three levels, with the indexes weighted through the comprehensive weighting method based on the combination of the G1 method and the entropy weight method. Based on the degree of coordinated development among various systems, the coordinated development of the Middle Route of the South–North Water Transfer Project is graded through a comprehensive evaluation. This method is tested in the decision support system of the Middle Route Construction and Administration Bureau, China. The results show that: (1) The coupling coordination degree value of the middle route of the South-to-North Water Diversion Project is 0.8912, which shows that the regional development of the water transfer project is high coupled coordination. (2) The coordination between the economic system and the ecological environment system is weaker than the coordination between the economic system and the social service system, and the coordination between the ecological and social services is the best. Finally, based on an advanced SWOT analysis of the future development of the middle route of the South-to-North Water Diversion Project, effective suggestions for regional development are provided. It provides reference or guidance for the competent authority to manage the water diversion project and the central government to comprehensively evaluate the effectiveness of the water diversion project.


2016 ◽  
Vol 16 (4) ◽  
pp. 961-970 ◽  
Author(s):  
Jijian Lian ◽  
Xiaozhong Sun ◽  
Chao Ma

The middle route of the south–north water transfer project (SNWTP) was built to relieve the pressure of increasing water demand in northern China. Serving as one of the major storage systems, optimal operation rules should be proposed promptly for Danjiangkou Reservoir, completed by a heightening project. In this paper, in order to seek out the optimal operation rules for Danjiangkou Reservoir, a multi-objective optimal operation model is developed, considering the inflow uncertainty, multi-year regulation cycle and water supply for the SNWTP. Three evaluation indexes (hydropower generation, water impoundment condition and shortage index) are adopted to assess the impacts of three influence factors (starting regulation level (SRL), inflow condition and flood control level) on Danjiangkou Reservoir operations. Finally, some critical operation strategies for Danjiangkou Reservoir are proposed. The results show that the optimal SRL for Danjiangkou Reservoir is 158 m and the recommended range of the water level at the end of the first year varies between 162–166 m (very wet), 164–166 m (wet), and 162–164 m (normal) on the basis of setting 158 m as the SRL.


Author(s):  
Yangwen Jia ◽  
Hong Gan ◽  
Jinjun You ◽  
Xueping Li ◽  
Cunwen Niu ◽  
...  

2013 ◽  
Vol 12 (11) ◽  
pp. 2239-2247 ◽  
Author(s):  
Guomin Li ◽  
Haizhen Xu ◽  
Ming Li ◽  
Shouquan Zhang ◽  
Yanhui Dong ◽  
...  

2012 ◽  
Vol 256-259 ◽  
pp. 2523-2527
Author(s):  
Qian Wei Wang ◽  
Rui Rui Sun ◽  
Wei Ping Guo

With regards to the characteristics of inter-basin water transfer projects, a 3d visual simulation (Three-Dimensional Visual Simulation, 3DVS) method for inter-basin water transfer project was proposed. A virtual reproduction of the entire project and its topography is achieved. The supplement of the three-dimensional topographic data was completed by Civil 3D combinedwith Google Earth. In this paper, the 3D digital model of inter-basin water transfer project is established using 3ds Max. Based on the established digital model, the simulation of channel water were realized .The Yuzhou section of South-to-North Water Transfer Project is taken as a case study. 3D visual simulation provides an effective way for the construction management and decision-making for inter-basin water diversion project.


2005 ◽  
Vol 32 (1) ◽  
pp. 159-163 ◽  
Author(s):  
Duan Wei

Beijing is located in a semiarid region, and water shortage is a common problem in the city. Along with the rapid increase in water demand, due to fast socioeconomic development and an increase in population, a shortage of water resources and a deterioration of the water environment have become obstacles to sustainable socioeconomic development in Beijing. In the long run, sustainable water resources management, water conservation, and completion of the south to north water diversion project will solve the problem. This paper introduces the water resources situation in Beijing; analyzes future water demand; and discusses the actions of water saving, nontraditional water resources exploitation, wetland construction, and water environment protection. The paper also explains the importance of the south to north water diversion project and the general layout of the water supply strategy, water distribution system, and methods to efficiently use the diverted water in Beijing.Key words: water resources, water supply, water saving, water recycling, water diversion.


Sign in / Sign up

Export Citation Format

Share Document