scholarly journals Influence of High Temperature Curing and Surface Humidity on the Tensile Strength of UHPC

Materials ◽  
2021 ◽  
Vol 14 (15) ◽  
pp. 4260
Author(s):  
Matthias Kalthoff ◽  
Michael Raupach ◽  
Thomas Matschei

The objective of this study is an investigation of the different parameters that influence the tensile strength of ultra-high performance concrete (UHPC). Apart from the shrinkage and stiff-ness, the tensile strength is an important parameter for the design of crack-free concrete elements, e.g., in machine tool construction. One focus of our work is the influence of concrete curing and the great impact of the mechanical and physical characteristics of hydrated UHPC. For this reason, different curing regimes were investigated. The results show that even after heat treatment or autoclaving, the centric tensile strength of UHPC specimens is strongly influenced by the surrounding ambient humidity. Test specimens that were stored under water after a heat treatment or autoclaving and were still wet during the test had the highest tensile strengths. Storage at 20 °C and 65% relative humidity (rH), however, results in a 25% reduction in tensile strength. Alternating storage between water storage at 20 °C water and storage at 65% rH can also reduce the tensile strength dramatically by up to 70%. In particular, samples that were stored at 65% rH right before testing had very low tensile strengths. Surprisingly, the initially low tensile strength of previously dry stored UHPC can be restored by subsequent water storage. In the absence of any microstructural defects, e.g., microcracks, a possible explanation for this phenomenon can be the stress differences due to a humidity gradient between the core and surfaces and shrinkage combined with a continued reaction of the unhydrated binders of the UHPC.

Author(s):  
Faiq M. Al-Zwainy ◽  
Hussam k. Risan ◽  
Rana I. K. Zaki

The purpose of this study was to conduct a meta-analysis that shows the influence of fiber on ultimate compressive strength and tensile strength of ultra-high performance concrete. The internet scholarly search engines and ScienceDirect article references were used to illustrate the papers concerning the experimental investigations of mechanical properties of ultra-high strength concrete with and without fiber with clearly, completely and comparative raw data. The normal concrete test results were dismissed from this search. Seven trials were identified based on the adopted inclusion and exclusion criteria above. The meta-analysis based on standardized mean difference was carried out on the basis of a fixed-effects model for the major outcomes of the ultimate compressive and tensile properties of ultra-high performance concrete. A total of 888 test specimens were enrolled in these seven trials. The combined analysis yielded a sign of a significant improvement in ultimate compressive strength and tensile strength of ultra-high strength concrete with fiber addition of 2% by concrete volume. The summary effect size of ultimate compressive strength was 2.34 while a more improvement in term of tensile strength with effect size of 2.64. By addition fiber of 2% provides a significant benefit in mechanical properties of ultra-high performance concrete.


Sadhana ◽  
2013 ◽  
Vol 38 (6) ◽  
pp. 1421-1431 ◽  
Author(s):  
PRABHAT RANJAN PREM ◽  
B H BHARATKUMAR ◽  
NAGESH R IYER

Author(s):  
Charlotte Murphy

<p>The IStructE Pai Lin Li Travel Award funded the author for an investigation into current practice precast concrete construction in the USA. The Federal Highways Administration (FHWA) in the USA has invested heavily in research into precast concrete construction through its Accelerated Bridge Construction (ABC) programme. The FHWA’s research has had a focus on innovative techniques for joining structural precast concrete elements together.<p>Grouted splice couplers and Ultra-High Performance Concrete are the two key enabling techniques that were investigated in this research. The replacement of 6 36m span bridges over Interstate 78 in Pennsylvania used these techniques and completed each bridge replacement in 40 days. This paper investigates the development of these techniques, the benefits they could have on the UK construction industry and what actions need to be taken to realise those benefits.


Sign in / Sign up

Export Citation Format

Share Document