scholarly journals Studying the Reduction of Water Use in Integrated Solar Combined-Cycle Plants

2019 ◽  
Vol 11 (7) ◽  
pp. 2085 ◽  
Author(s):  
Fontina Petrakopoulou ◽  
Marina Olmeda-Delgado

With vast amounts of water consumed for electricity generation and water scarcity predicted to rise in the near future, the necessity to evaluate water consumption in power plants arises. Cooling systems are the main source of water consumption in thermoelectric power plants, since water is a cooling fluid with relatively low cost and high efficiency. This study evaluates the performance of two types of power plants: a natural gas combined-cycle and an integrated solar combined-cycle. Special focus is made on the cooling system used in the plants and its characteristics, such as water consumption, related costs, and fuel requirements. Wet, dry, and hybrid cooling systems are studied for each of the power plants. While water is used as the cooling fluid to condense the steam in wet cooling, dry cooling uses air circulated by a fan. Hybrid cooling presents an alternative that combines both methods. We find that hybrid cooling has the highest investment costs as it bears the sum of the costs of both wet and dry cooling systems. However, this system produces considerable fuel savings when compared to dry cooling, and a 50% reduction in water consumption when compared to wet cooling. As expected, the wet cooling system has the highest exergetic efficiency, of 1 and 5 percentage points above that of dry cooling in the conventional combined-cycle and integrated solar combined-cycle, respectively, thus representing the lowest investment cost and highest water consumption among the three alternatives. Hybrid and dry cooling systems may be considered viable alternatives under increasing water costs, requiring better enforcement of the measures for sustainable water consumption in the energy sector.

Author(s):  
R. W. Card

A hybrid wet-dry cooling system can be designed for a large combined-cycle power plant. A well-designed hybrid cooling system will provide reasonable net generation year-round, while using substantially less water than a conventional wet cooling tower. The optimum design for the hybrid system depends upon climate at the site, the price of power, and the price of water. These factors vary on a seasonal basis. Two hypothetical power plants are modeled, using state-of-the-art steam turbines and hybrid cooling systems. The plants are designed for water-constrained sites incorporating typical weather data, power prices, and water prices. The principles for economic designs of hybrid cooling systems are demonstrated.


Author(s):  
John S. Maulbetsch

Water use by power plant cooling systems has become a critical siting issue for new plants and the object of increasing pressure for modification or retrofit at existing plants. Wet cooling typically costs less and results in more efficient plant performance. Dry cooling, while costing more and imposing heat rate and capacity penalties on the plant, conserves significant amounts of water and eliminates any concerns regarding thermal discharge to or intake losses on local water bodies. Hybrid cooling systems have the potential of combining the advantages of both systems by reducing, although not eliminating, water requirements while incurring performance penalties that are less than those from all-dry systems. The costs, while greater than those for wet cooling, can be less than those for dry. This paper addresses parallel wet/dry systems combining direct dry cooling using a forced-draft air-cooled condenser (ACC) with closed-cycle wet cooling using a surface (shell-and-tube) steam condenser and a mechanical-draft, counterflow wet cooling tower as applied to coal-fired steam plants, gas-fired combined-cycle plants and nuclear plants. A brief summary of criteria used to identify situations where hybrid systems should be considered is given. A methodology for specifying and selecting a hybrid system is described along with the information and data requirements for sizing and estimating the capital costs and water requirements a specified plant at a specified site. The methodology incorporates critical plant and operating parameters into the analysis, such as plant monthly load profile, plant equipment design parameters for equipment related to the cooling system, e.g. steam turbine, condenser, wet or dry cooling system, wastewater treatment system. Site characteristics include a water budget or constraints, e.g. acre feet of water available for cooling on an annual basis as well as any monthly or seasonal “draw rate” constraints and meteorological data. The effect of economic parameters including cost of capital, power, water and chemicals for wastewater treating are reviewed. Finally some examples of selected systems at sites of varying meteorological characteristics are presented.


Author(s):  
Geoffrey Short ◽  
Addison K. Stark ◽  
Daniel Matuszak ◽  
James F. Klausner

Fresh water withdrawal for thermoelectric power generation in the U.S. is approximately 139 billion gallons per day (BGD), or 41% of total fresh water draw, making it the largest single use of fresh water in the U.S. Of the fresh water withdrawn for the power generation sector, 4.3 BGD is dissipated to the atmosphere by cooling towers and spray ponds. Dry-cooled power plants are attractive and sometimes necessary because they avoid significant withdrawal and consumption of freshwater resources that could otherwise be used for other purposes. This could become even more important when considering the potential effects of climate change (1). Additional benefits of dry-cooling include power plant site flexibility, reduced risk of water scarcity, and faster permitting (reducing project development time and cost). However, dry-cooling systems are known to be more costly and larger than their wet-cooling counterparts. Additionally, without the benefit of additional latent heat transfer through evaporation, the Rankine cycle condensing (cold) temperature for dry-cooling is typically higher than that for wet-cooling, affecting the efficiency of power production and the resultant levelized cost of electricity (LCOE). The Advanced Research Projects Agency - Energy (ARPA-E) has developed a technoeconomic analysis (TEA) model for the development of indirect dry-cooling systems employing steam condensation within a natural gas combined cycle power plant. The TEA model has been used to inform the Advanced Research in Dry-Cooling (ARID) Program on the performance metrics needed to achieve an economical dry-cooling technology. In order to assess the relationship between air-cooled heat exchanger (ACHX) performance, including air side heat transfer coefficient and pressure drop, and power plant economics, ARPA-E has employed a modified version of the National Energy Technology Laboratory (NETL) model of a 550 MW natural gas combined cycle (NGCC) plant employing an evaporative cooling system. The evaporative cooling system, including associated balance of system costs, was replaced with a thermodynamic model for an ACHX with the desired improved heat transfer performance and supplemental cooling and storage systems. Monte Carlo simulation determined an optimal ACHX geometry and associated ACHX cost. Allowing for an increase in LCOE of 5%, the maximum allowable additional cost of the supplemental cooling system was determined as a function of the degree of cooling of the working fluid required. This paper describes the methodologies employed in the TEA, details the results, and includes related models as supplemental material, while providing insight on how the open source tool might be used for thermal management innovation.


Author(s):  
Huifang Deng ◽  
Robert F. Boehm

The southwestern US is an ideal location for solar power plants due to its abundant solar resource, while there is a difficulty in implementing wet cooling systems due to the shortage of water in this region. Dry cooling could be an excellent solution for this, if it could achieve a high efficiency and low cost as wet cooling. Some dry cooling systems are currently in operation, and investigations of their performance have been reported in the literature. This paper looks into the limits to the power production implicit in dry cooling, assuming that improvements might be made to the system components. Use of higher performance heat transfer surfaces is one such possible improvement. We have developed a model of a fairly typical, but simplified, solar trough plant, and simulated thermodynamic performance of this with the software Gatecycle. We have examined the power generation and cycle efficiency of the plant for the Las Vegas vicinity with conventional wet cooling and conventional dry cooling cases considered separately using this software. TMY2 data are used for this location for this purpose. Similarly, the same studies are carried out for “ideal” cooling systems as a comparison. We assumed that in the ideal dry cooling system, the condensing temperature is the ambient dry bulb temperature, and in the ideal wet cooling system, it is the ambient wet bulb temperature. It turned out that the ideal dry cooling system would significantly outperform the conventional wet cooling system, indicating the possibility of the dry cooling system being able to achieve increased performance levels with component improvements.


2020 ◽  
Vol 12 (11) ◽  
pp. 4739
Author(s):  
Faisal Asfand ◽  
Patricia Palenzuela ◽  
Lidia Roca ◽  
Adèle Caron ◽  
Charles-André Lemarié ◽  
...  

The use of wet cooling in Concentrated Solar Power (CSP) plants tends to be an unfavourable option in regions where water is scarce due to the high water requirements of the method. Dry-cooling systems allow a water consumption reduction of up to 80% but at the expense of lower electricity production. A hybrid cooling system (the combination of dry and wet cooling) offers the advantages of each process in terms of lower water consumption and higher electricity production. A model of a CSP plant which integrates a hybrid cooling system has been implemented in Thermoflex software. The water consumption and the net power generation have been evaluated for different configurations of the hybrid cooling system: series, parallel, series-parallel and parallel-series. It was found that the most favourable configuration in terms of water saving was series-parallel, in which a water reduction of up to 50% is possible compared to the only-wet cooling option, whereas an increase of 2.5% in the power generation is possible compared to the only-dry cooling option. The parallel configuration was the best in terms of power generation with an increase of 3.2% when compared with the only-dry cooling option, and a reduction of 30% water consumption compared to the only-wet cooling option.


Author(s):  
Nicola Palestra ◽  
Giovanna Barigozzi ◽  
Antonio Perdichizzi

The paper presents the results of an investigation on inlet air cooling systems based on cool thermal storage, applied to combined cycle power plants. Such systems provide a significant increase of electric energy production in the peak hours; the charge of the cool thermal storage is performed instead during the night time. The inlet air cooling system also allows the plant to reduce power output dependence on ambient conditions. A 127MW combined cycle power plant operating in the Italian scenario is the object of this investigation. Two different technologies for cool thermal storage have been considered: ice harvester and stratified chilled water. To evaluate the performance of the combined cycle under different operating conditions, inlet cooling systems have been simulated with an in-house developed computational code. An economical analysis has been then performed. Different plant location sites have been considered, with the purpose to weigh up the influence of climatic conditions. Finally, a parametric analysis has been carried out in order to investigate how a variation of the thermal storage size affects the combined cycle performances and the investment profitability. It was found that both cool thermal storage technologies considered perform similarly in terms of gross extra production of energy. Despite this, the ice harvester shows higher parasitic load due to chillers consumptions. Warmer climates of the plant site resulted in a greater increase in the amount of operational hours than power output augmentation; investment profitability is different as well. Results of parametric analysis showed how important the size of inlet cooling storage may be for economical results.


Author(s):  
Abdul Ahad Iqbal ◽  
Ali Al-Alili

Abstract The performance of air conditioning systems is highly dependent on the environmental conditions of the high pressure side, where heat is rejected to the environment. Air conditioning systems utilize dry cooling systems which often don’t provide adequate cooling during peak cooling periods, or wet cooling systems which consume a lot of water. In this study, a novel hybrid cooling system that can provide both wet and dry cooling was modelled in TRNSYS, and used to provide cooling to closed sorption air conditioning systems. The performance of these systems with the hybrid cooling system was compared to the performance of a standard vapor compression cooling system being cooled by a dry cooling system. The COPsol of the vapor compression cooling system exhibited a decrease of almost 26% during the summer period, whereas the COPsol of the sorption systems increased by around 30%. Similarly, the cooling capacity of the vapor compression cooling system dropped by almost 5%, and for the sorption systems, it increased by around 20% during the summer period.


2021 ◽  
Vol 11 (20) ◽  
pp. 9639
Author(s):  
Eduardo de la Rocha Camba ◽  
Fontina Petrakopoulou

Water dependency of power plants undermines energy security by making power generation susceptible to water scarcity. This study evaluates the economic performance of a novel dry-cooling system for a water-independent solar power plant. The proposed cooling system is based on the concept of earth–air heat exchangers, approaching zero environmental impact. The viability of the proposed design is discussed based on both costs and benefits, and it is compared to both conventional dry- and wet-cooling systems. The installation costs of the plant are found to be EUR 13,728/kW, resulting in the substantial levelized cost of electricity of EUR 505.97/MWh. The net present value of the studied design assuming a water-cost saving of EUR 1/m3 is found to be MEUR –139.59. Significantly higher water prices in the future might eventually make the proposed system economically attractive when compared to water-cooling systems. However, the new system would require drastic modifications to become more attractive when compared to existing dry-cooling systems. Specific possibilities to improve it for zero-water use in thermoelectric power plants are further discussed.


Author(s):  
Akbar Adibfar ◽  
Maryam Refan

A reliable and economic power production in thermal power plants depends highly upon the optimum selection of site equipment and their best possible arrangement. One of the most significant systems which play a crucial role in power production is the Cooling System. Playing the most pivotal role in back pressure of steam turbine, this system directly affects the power plant efficiency. This study analyzes the techno-economic aspect of Cooling System — with the special focus on ACC (Air Cooled Condenser) — due to the following advantages: Since ACC does not need water as the cooling medium, (not requiring medium fluid), it is been preferred over other cooling systems in dry regions. In addition to resolving the problem of water shortage in power plants, where there are environmental or geographical limitations, ACC is the best solution. The studies show that in the peak demand times, ACC has a much greater potential in higher power production in comparison to other dry cooling systems and thus can encourage the financer to consider ACC as an optimum alternative.


Author(s):  
John S. Maulbetsch

This paper documents the results of a study of alternative cooling systems for electric power generating plants to understand the tradeoffs between wet, dry and hybrid cooling technologies. Results are presented through case studies of a 500 MW coal plant, a 600 MW nuclear plant and a 500 MW gas-fired combined-cycle plant, each at five different sites. Alternative cooling systems are configured and optimized for each site. For optimized designs under nearly all conditions, wet cooling systems are not only the least expensive but result in the highest plant output and efficiency. For both all-dry and hybrid systems, the system using indirect dry cooling has higher capital and operating costs than one using the direct system. The use of either dry or hybrid cooling can result in a large reduction in the amount of water used by a plant. The savings cost approximately $7 to $10 million per year for plants of the specified size, depending on the plant and site implying a breakeven water cost of $3 to $6 per thousand gallons.


Sign in / Sign up

Export Citation Format

Share Document