scholarly journals Developing a Resource Allocation Approach for Resource-Constrained Construction Operation under Multi-Objective Operation

2021 ◽  
Vol 13 (13) ◽  
pp. 7318
Author(s):  
Wei He ◽  
Wenjing Li ◽  
Wei Wang

In the construction industry, it is of great importance for project managers (PM) to consider the resource allocation arrangement problem based on different perspectives. In this situation, the management of resources in construction becomes a challenge. Generally speaking, there are many objectives that need to be optimized in construction that are in conflict with each other, including time, cost, and energy consumption (EC). This paper proposed a multi-objective optimization framework based on the quantum genetic algorithm (QGA) to obtain the best trade-off relationship among these goals. The construction resources allocated in each construction activity would eventually determine its execution time, cost, and EC, and a complexed time-cost-energy consumption trade-off framework of the project is finally generated due to correlations between construction activities. QGA was performed to find the best combination among time, cost, and EC and the optimal scheme of resource arrangement under this state. The construction process is simulated in BIM to check the rationality of this resource allocation mode. An industrial plant office building in China is presented as an example to illustrate the implementation of the proposed model. The results show that the presented method could effectively reduce 7% of cost, 17% of time, and 21% of energy consumption. This developed model is expected to help PMs to solve the problem of multi-objective optimization with limited resource allocation.

2019 ◽  
Vol 5 (11) ◽  
pp. 2461-2471
Author(s):  
Hanaa H. Lateef ◽  
Abbas Mohammed Burhan

The cost of pile foundations is part of the super structure cost, and it became necessary to reduce this cost by studying the pile types then decision-making in the selection of the optimal pile type in terms of cost and time of production and quality .So The main objective of this study is to solve the time–cost–quality trade-off (TCQT) problem by finding an optimal pile type with the target of "minimizing" cost and time while "maximizing" quality. There are many types In the world of piles but  in this paper, the researcher proposed five pile types, one of them is not a traditional, and   developed a model for the problem and then employed particle swarm optimization (PSO) algorithm, as one of evolutionary algorithms with the help of (Mat lab software), as a tool for decision making problem about choosing the best alternative of the traded piles, and proposes a multi objective optimization model, which aims to optimize the time, cost and quality of the pile types, and assist in selecting the most appropriate pile types. The researcher selected 10 of senior engineers to conduct interviews with them.  And prepared some questions for interviews and open questionnaire. The individuals are selected from private and state sectors each one have 10 years or more experience in pile foundations work. From personal interviews and field survey the research has shown that most of the experts, engineers are not fully aware of new soft wear techniques to helps them in choosing alternatives, despite their belief in the usefulness of using modern technology and software. The Problem is multi objective optimization problem, so after running the PSO algorithm it is usual to have more than one optimal solution, for five proposed pile types, finally the researcher  evaluated and  discussed the output results and  found out that pre-high tension spun (PHC)pile type was the optimal pile type.


2015 ◽  
Vol 21 (3) ◽  
pp. 323-333 ◽  
Author(s):  
Choongwan Koo ◽  
Taehoon Hong ◽  
Sangbum Kim

As construction projects become larger and more diversified, various factors such as time, cost, quality, environment, and safety that need to be considered make it very difficult to make the final decision. This study was conducted to develop an integrated Multi-Objective Optimization (iMOO) model that provides the optimal solution set based on the concept of the Pareto front, through the following six steps: (1) problem statement; (2) definition of the optimization objectives; (3) establishment of the data structure; (4) standardization of the optimization objectives; (5) definition of the fitness function; and (6) introduction of the genetic algorithm. To evaluate the robustness and reliability of the proposed iMOO model, a case study on the construction time-cost trade-off problem was analyzed in terms of effectiveness and efficiency. The results of this study can be used: (1) to assess more than two optimization objectives, such as the initial investment cost, operation and maintenance cost, and CO2 emission trading cost; (2) to take advantage of the weights as the real meanings; (3) to evaluate the four types of fitness functions; and (4) to expand into other areas such as the indoor air quality, materials, and energy use.


Author(s):  
Praveen Kumar Dwivedi ◽  
Surya Prakash Tripathi

Background: Fuzzy systems are employed in several fields like data processing, regression, pattern recognition, classification and management as a result of their characteristic of handling uncertainty and explaining the feature of the advanced system while not involving a particular mathematical model. Fuzzy rule-based systems (FRBS) or fuzzy rule-based classifiers (mainly designed for classification purpose) are primarily the fuzzy systems that consist of a group of fuzzy logical rules and these FRBS are unit annexes of ancient rule-based systems, containing the "If-then" rules. During the design of any fuzzy systems, there are two main objectives, interpretability and accuracy, which are conflicting with each another, i.e., improvement in any of those two options causes the decrement in another. This condition is termed as Interpretability –Accuracy Trade-off. To handle this condition, Multi-Objective Evolutionary Algorithms (MOEA) are often applied within the design of fuzzy systems. This paper reviews the approaches to the problem of developing fuzzy systems victimization evolutionary process Multi-Objective Optimization (EMO) algorithms considering ‘Interpretability-Accuracy Trade-off, current research trends and improvement in the design of fuzzy classifier using MOEA in the future scope of authors. Methods: The state-of-the-art review has been conducted for various fuzzy classifier designs, and their optimization is reviewed in terms of multi-objective. Results: This article reviews the different Multi-Objective Optimization (EMO) algorithms in the context of Interpretability -Accuracy tradeoff during fuzzy classification. Conclusion: The evolutionary multi-objective algorithms are being deployed in the development of fuzzy systems. Improvement in the design using these algorithms include issues like higher spatiality, exponentially inhabited solution, I-A tradeoff, interpretability quantification, and describing the ability of the system of the fuzzy domain, etc. The focus of the authors in future is to find out the best evolutionary algorithm of multi-objective nature with efficiency and robustness, which will be applicable for developing the optimized fuzzy system with more accuracy and higher interpretability. More concentration will be on the creation of new metrics or parameters for the measurement of interpretability of fuzzy systems and new processes or methods of EMO for handling I-A tradeoff.


2014 ◽  
Vol 1046 ◽  
pp. 508-511
Author(s):  
Jian Rong Zhu ◽  
Yi Zhuang ◽  
Jing Li ◽  
Wei Zhu

How to reduce energy consumption while improving utility of datacenter is one of the key technologies in the cloud computing environment. In this paper, we use energy consumption and utility of data center as objective functions to set up a virtual machine scheduling model based on multi-objective optimization VMSA-MOP, and design a virtual machine scheduling algorithm based on NSGA-2 to solve the model. Experimental results show that compared with other virtual machine scheduling algorithms, our algorithm can obtain relatively optimal scheduling results.


Sign in / Sign up

Export Citation Format

Share Document