Improvement of Electric Power Generation at Khor Al-Zubair Gas Turbine Power Plant by Using Vapor Compression Cooling Cycle

2019 ◽  
Vol 19 (1) ◽  
pp. 17-25
Author(s):  
Safaa Hameed Faisal ◽  
Adnan Abdulla Ateeq ◽  
Hanadi Mahmood Ali
1980 ◽  
Author(s):  
J. Jermanok ◽  
R. E. Keith ◽  
E. F. Backhaus

A new 37-MW, single-shaft gas turbine power plant has been designed for electric power generation, for use in either simple-cycle or combined-cycle applications. This paper describes the design features, instrumentation, installation, test, and initial operation.


1979 ◽  
Author(s):  
J. Jermanok ◽  
G. A. Ludwig

A new 37-MW, single-shaft gas turbine power plant has been designed for electric power generation, for use in either simple-cycle or combined-cycle applications. This paper describes the evolution, design features, performance, and test program.


2018 ◽  
Vol 141 (2) ◽  
Author(s):  
Esmail M. A. Mokheimer ◽  
Yousef N. Dabwan

This paper presents the results of a thermo-economic analysis of integrating solar tower (ST) with heat and power cogeneration plants that is progressively being installed to produce heat and electricity to operate absorption refrigeration systems or steam for industrial processes. The annual performance of an integrated solar-tower gas-turbine-cogeneration power plant (ISTGCPP) with different sizes of gas turbine and solar collector's area have been examined and presented. Thermoflex + PEACE software's were used to thermodynamically and economically assess different integration configurations of the ISTGCPP. The optimal integrated solar field size has been identified and the pertinent reduction in CO2 emissions due to integrating the ST system is estimated. For the considered cogeneration plant (that is required to produce 81.44 kg/s of steam at 394 °C and 45.88 bars), the study revealed that (ISTGCPP) with gas turbine of electric power generation capacity less than 50 MWe capacities have more economic feasibility for integrating solar energy. The levelized electricity cost (LEC) for the (ISTGCPP) varied between $0.067 and $0.069/kWh for gas turbine of electric power generation capacity less than 50 MWe. Moreover, the study demonstrated that (ISTGCPP) has more economic feasibility than a stand-alone ST power plant; the LEC for ISTGCPP is reduced by 50–60% relative to the stand-alone ST power plant. Moreover, a conceptual procedure to identify the optimal configuration of the ISTGCPP has been developed and presented in this paper.


2005 ◽  
Vol 127 (3) ◽  
pp. 592-598 ◽  
Author(s):  
M. Bianchi ◽  
G. Negri di Montenegro ◽  
A. Peretto

The use of gas turbine and combined cycle power plants for thermal and electric power generation is, nowadays, a consolidated technology. Moreover, the employment of combined heat and power production, especially for low power requirements, is constantly increasing. In this scenario, below ambient pressure discharge gas turbine (BAGT) is an innovative and interesting application; the hot gases discharged from a gas turbine may be expanded below ambient pressure to obtain an increase in electric power generation. The gases are then cooled to supply heat to the thermal utility and finally recompressed to the ambient pressure. The power plant cogenerative performance depends on the heat and electric demand that usually varies during the year (for residential heating the heat to electric power ratio may range from 0.3 to 9). In this paper, the thermal load variation influence on the BAGT performance will be investigated and compared with those of gas turbine and combined cycle power plants.


Author(s):  
Yongjun Zhao ◽  
Vitali Volovoi ◽  
Mark Waters ◽  
Dimitri Mavris

The deregulation of the electric power market has introduced strong competition, and as a result, power plant operators strive to develop advanced operational strategies to maximize the profitability given the conditions of the dynamic electric power market. In the deregulated electric power market, the operational strategies should match the evolving electric power market, and be capable of performing an optimization that is specific to a unit operating in a complex environment. A profit based, lifecycle oriented, and unit specific approach is proposed for more effective gas turbine power plant operational optimization, and methodologies for this approach are developed. This paper outlines an integrated, generic environment for unit-specific gas turbine power plant operational modeling and optimization, while several other follow up papers address specific operational optimization problems. The procedure is implemented for a generic combined cycle power plant with single gas turbine with the results demonstrating the feasibility of the proposed approach.


Author(s):  
S. T. Robinson ◽  
J. W. Glessner

The means of using total energy from a gas-turbine engine in various refrigeration systems are reviewed. Combinations of heating and cooling or electric power generation and cooling are discussed as well as combined centrifugal and absorption refrigeration systems. The economics of gas-burning turbine engines are investigated and shown to be attractive in these applications.


Author(s):  
D. Matushkin ◽  
А. Bosak ◽  
L. Kulakovskyi

The new model of the wholesale electricity market in Ukraine causes appearance the market for the day ahead. In this market, the generating company undertakes to supply a certain amount of electricity. So, it is necessary to carry on the most accurate forecast of possible electricity generation by solar power plant (SPP). Generation value depends on certain factors. A brief summary of different influence of parameters on the PV cell performance has been provided. The article analyzes and identifies the factors that should be included in the forecast mathematical model of electricity generation by a solar power plant for a certain short-term period. According to analyzed data from SPP located in the Kyiv region, such parameters are the intensity of solar radiation, temperature and humidity, wind speed, and atmospheric pressure. The degree of influence of these factors on the initial function of electric energy generation were estimated by analyzing the scatter plot diagrams of relationship between parameters and correlation coefficients. Thus, the analysis of the influence of factors on the magnitude of electricity generation allowed to determine the priority of including each of the parameters in the mathematical model of the SPP power forecast. It was established that the influence of certain climate parameters for target function is different in each season. Therefore, in the mathematical model for forecasting electric power generation, it is necessary to take into account seasonality. In addition, the dynamic value change of factors also affects the current magnitude of electricity generation. Moreover, at different times of the year and with different combination of the corresponding values of climatic parameters, this effect may have different magnitudes. Therefore, the data obtained from the last periods before the forecasting should have a greater impact on obtaining the predicted value than the data from previous periods.


Author(s):  
Umberto Ghezzi ◽  
Silvano Pasini

The problem of sludge dehydration assumes an ever growing importance, owing also to the constant increasing diffusion of water treatment plants. To better understand the entity of the problem it is enough to pay attention to the fact that water treatment plants can produce up to hundreds of tons per day of sludges, whose disposal is of not less importance if compared to the treatment of liquid effluents.


Sign in / Sign up

Export Citation Format

Share Document