scholarly journals Total Turbine Energy in Refrigeration Cycles

Author(s):  
S. T. Robinson ◽  
J. W. Glessner

The means of using total energy from a gas-turbine engine in various refrigeration systems are reviewed. Combinations of heating and cooling or electric power generation and cooling are discussed as well as combined centrifugal and absorption refrigeration systems. The economics of gas-burning turbine engines are investigated and shown to be attractive in these applications.

2005 ◽  
Vol 128 (2) ◽  
pp. 302-311 ◽  
Author(s):  
Qusai Z. Al-Hamdan ◽  
Munzer S. Y. Ebaid

The gas turbine engine is a complex assembly of a variety of components that are designed on the basis of aerothermodynamic laws. The design and operation theories of these individual components are complicated. The complexity of aerothermodynamic analysis makes it impossible to mathematically solve the optimization equations involved in various gas turbine cycles. When gas turbine engines were designed during the last century, the need to evaluate the engines performance at both design point and off design conditions became apparent. Manufacturers and designers of gas turbine engines became aware that some tools were needed to predict the performance of gas turbine engines especially at off design conditions where its performance was significantly affected by the load and the operating conditions. Also it was expected that these tools would help in predicting the performance of individual components, such as compressors, turbines, combustion chambers, etc. At the early stage of gas turbine developments, experimental tests of prototypes of either the whole engine or its main components were the only method available to determine the performance of either the engine or of the components. However, this procedure was not only costly, but also time consuming. Therefore, mathematical modelling using computational techniques were considered to be the most economical solution. The first part of this paper presents a discussion about the gas turbine modeling approach. The second part includes the gas turbine component matching between the compressor and the turbine which can be met by superimposing the turbine performance characteristics on the compressor performance characteristics with suitable transformation of the coordinates. The last part includes the gas turbine computer simulation program and its philosophy. The computer program presented in the current work basically satisfies the matching conditions analytically between the various gas turbine components to produce the equilibrium running line. The computer program used to determine the following: the operating range (envelope) and running line of the matched components, the proximity of the operating points to the compressor surge line, and the proximity of the operating points at the allowable maximum turbine inlet temperature. Most importantly, it can be concluded from the output whether the gas turbine engine is operating in a region of adequate compressor and turbine efficiency. Matching technique proposed in the current work used to develop a computer simulation program, which can be served as a valuable tool for investigating the performance of the gas turbine at off-design conditions. Also, this investigation can help in designing an efficient control system for the gas turbine engine of a particular application including being a part of power generation plant.


1988 ◽  
Vol 110 (4) ◽  
pp. 572-577
Author(s):  
D. J. Folenta

This paper presents a brief description and several illustrations of a new concept of marine reversing gears that utilize high-performance differentially driven epicyclic gear arrangements. This new marine power transmission has the potential to offer high reliability, simplicity, light weight, high mechanical efficiency, compactness, and technological compatibility with aircraft derivative marine gas turbine engines. Further, this new reversing gear minimizes the danger of driving the free turbine in reverse as might be the case with conventional parallel shaft reversing gear arrangements. To illustrate the weight reduction potential, a modern naval ship propulsion system utilizing an aircraft derivative gas turbine engine as the prime mover in conjunction with a conventional parallel shaft reversing gear can be compared to the subject reversing gear differential. A typical 18,642 kW (25,000 hp) marine gas turbine engine might weigh approximately 5000 kg (11,000 lb) and a conventional marine technology parallel shaft reversing gear might weigh on the order of 90,000 to 136,000 kg (200,000 to 300,000 lb). Using gear technology derived from the aircraft industry, a functionally similar differentially driven marine reversing gear might weigh approximately 13,600 kg (30,000 lb).


2021 ◽  
Author(s):  
Jeffrey S. Patterson ◽  
Kevin Fauvell ◽  
Dennis Russom ◽  
Willie A. Durosseau ◽  
Phyllis Petronello ◽  
...  

Abstract The United States Navy (USN) 501-K Series Radiological Controls (RADCON) Program was launched in late 2011, in response to the extensive damage caused by participation in Operation Tomodachi. The purpose of this operation was to provide humanitarian relief aid to Japan following a 9.0 magnitude earthquake that struck 231 miles northeast of Tokyo, on the afternoon of March 11, 2011. The earthquake caused a tsunami with 30 foot waves that damaged several nuclear reactors in the area. It was the fourth largest earthquake on record (since 1900) and the largest to hit Japan. On March 12, 2011, the United States Government launched Operation Tomodachi. In all, a total of 24,000 troops, 189 aircraft, 24 naval ships, supported this relief effort, at a cost in excess of $90.0 million. The U.S. Navy provided material support, personnel movement, search and rescue missions and damage surveys. During the operation, 11 gas turbine powered U.S. warships operated within the radioactive plume. As a result, numerous gas turbine engines ingested radiological contaminants and needed to be decontaminated, cleaned, repaired and returned to the Fleet. During the past eight years, the USN has been very proactive and vigilant with their RADCON efforts, and as of the end of calendar year 2019, have successfully completed the 501-K Series portion of the RADCON program. This paper will update an earlier ASME paper that was written on this subject (GT2015-42057) and will summarize the U.S. Navy’s 501-K Series RADCON effort. Included in this discussion will be a summary of the background of Operation Tomodachi, including a discussion of the affected hulls and related gas turbine equipment. In addition, a discussion of the radiological contamination caused by the disaster will be covered and the resultant effect to and the response by the Marine Gas Turbine Program. Furthermore, the authors will discuss what the USN did to remediate the RADCON situation, what means were employed to select a vendor and to set up a RADCON cleaning facility in the United States. And finally, the authors will discuss the dispensation of the 501-K Series RADCON assets that were not returned to service, which include the 501-K17 gas turbine engine, as well as the 250-KS4 gas turbine engine starter. The paper will conclude with a discussion of the results and lessons learned of the program and discuss how the USN was able to process all of their 501-K34 RADCON affected gas turbine engines and return them back to the Fleet in a timely manner.


1980 ◽  
Author(s):  
J. Jermanok ◽  
R. E. Keith ◽  
E. F. Backhaus

A new 37-MW, single-shaft gas turbine power plant has been designed for electric power generation, for use in either simple-cycle or combined-cycle applications. This paper describes the design features, instrumentation, installation, test, and initial operation.


2020 ◽  
Vol 19 (4) ◽  
pp. 43-57
Author(s):  
H. H. Omar ◽  
V. S. Kuz'michev ◽  
A. O. Zagrebelnyi ◽  
V. A. Grigoriev

Recent studies related to fuel economy in air transport conducted in our country and abroad show that the use of recuperative heat exchangers in aviation gas turbine engines can significantly, by up to 20...30%, reduce fuel consumption. Until recently, the use of cycles with heat recovery in aircraft gas turbine engines was restrained by a significant increase in the mass of the power plant due to the installation of a heat exchanger. Currently, there is a technological opportunity to create compact, light, high-efficiency heat exchangers for use on aircraft without compromising their performance. An important target in the design of engines with heat recovery is to select the parameters of the working process that provide maximum efficiency of the aircraft system. The article focused on setting of the optimization problem and the choice of rational parameters of the thermodynamic cycle parameters of a gas turbine engine with a recuperative heat exchanger. On the basis of the developed method of multi-criteria optimization the optimization of thermodynamic cycle parameters of a helicopter gas turbine engine with a ANSAT recuperative heat exchanger was carried out by means of numerical simulations according to such criteria as the total weight of the engine and fuel required for the flight, the specific fuel consumption of the aircraft for a ton- kilometer of the payload. The results of the optimization are presented in the article. The calculation of engine efficiency indicators was carried out on the basis of modeling the flight cycle of the helicopter, taking into account its aerodynamic characteristics. The developed mathematical model for calculating the mass of a compact heat exchanger, designed to solve optimization problems at the stage of conceptual design of the engine and simulation of the transport helicopter flight cycle is presented. The developed methods and models are implemented in the ASTRA program. It is shown that optimal parameters of the working process of a gas turbine engine with a free turbine and a recuperative heat exchanger depend significantly on the heat exchanger effectiveness. The possibility of increasing the efficiency of the engine due to heat regeneration is also shown.


Author(s):  
J. A. Saintsbury ◽  
P. Sampath

The impact of potential aviation gas turbine fuels available in the near to midterm, is reviewed with particular reference to the small aviation gas turbine engine. The future course of gas turbine combustion R&D, and the probable need for compromise in fuels and engine technology, is also discussed. Operating experience to date on Pratt & Whitney Aircraft of Canada PT6 engines, with fuels not currently considered of aviation quality, is reported.


Author(s):  
Vladimir Lupandin ◽  
Martyn Hexter ◽  
Alexander Nikolayev

This paper describes a development program active at Magellan Aerospace Corporation since 2003, whereby specific modifications are incorporated into an Avco Lycoming T-53 helicopter gas turbine engine to enable it to function as a ground based Industrial unit for distributed power generation. The Lycoming T-53 is a very well proven and reliable two shaft gas turbine engine whose design can be traced back to the 1950s and the fact of its continued service to the present day is a tribute to the original design/development team. Phase 1 of the Program introduces abradable rotor path linings, blade coatings and changes to seal and blade tip clearances. Magellan has built a test cell to run the power generation units to full speed and full power in compliance with ISO 2314. In co-operation with Zorya-Mashproekt, Ukraine, the exhaust emissions of the existing combustion system for natural gas was reduced by 30%. New nozzles for low heat value fuels and for high hydrogen content fuels (up to 60% H2) have been developed. The T-53 gas turbine engine exhaust gas temperature is typically around 620 deg C, which makes it a very good candidate for co-generation and recuperated applications. As per Phase 2 of the program, the existing helicopter integral gearbox and separate industrial step-down gearbox will be replaced with single integral gearbox that will use the same lubrication oil system as the gas turbine engine. The engine power output will increase to 1200 kW at the generator terminals with an improvement to 25% efficiency ISO. Phase 3 of the Program will see the introduction of a new silo type combustion system, developed in order to utilize alternative fuels such as bio-diesel, biofuel (product of wood pyrolysis), land fill gases, syn gases etc. Phase 4 of the Program in cooperation with ORMA, Russia will introduce a recuperator into the package and is expected to realize a boost in overall efficiency to 37%. The results of testing the first two T-53 industrial gas turbine engines modified per Phase 1 will be presented.


Author(s):  
J. E. Donald Gauthier

This paper describes the results of modelling the performance of several indirectly fired gas turbine (IFGT) power generation system configurations based on four gas turbine class sizes, namely 5 kW, 50 kW, 5 MW and 100 MW. These class sizes were selected to cover a wide range of installations in residential, commercial, industrial and large utility power generation installations. Because the IFGT configurations modelled consist of a gas turbine engine, one or two recuperators and a furnace; for comparison purpose this study also included simulations of simple cycle and recuperated gas turbine engines. Part-load, synchronous-speed simulations were carried out with generic compressor and turbine maps scaled for each engine design point conditions. The turbine inlet temperature (TIT) was varied from the design specification to a practical value for a metallic high-temperature heat exchanger in an IFGT system. As expected, the results showed that the reduced TIT can have dramatic impact on the power output and thermal efficiency when compared to that in conventional gas turbines. However, the simulations also indicated that several configurations can lead to higher performance, even with the reduced TIT. Although the focus of the study is on evaluation of thermodynamic performance, the implications of varying configurations on cost and durability are also discussed.


Sign in / Sign up

Export Citation Format

Share Document