scholarly journals ANALISA PRODUKTIVITAS DAN BIAYA OPERASIONAL ALAT BERAT PADA PROYEK PEMBANGUNAN STREET-RACE CIRCUIT MANDALIKA

GANEC SWARA ◽  
2021 ◽  
Vol 15 (1) ◽  
pp. 849
Author(s):  
HASYIM HASYIM ◽  
I GEDE PUTU WARKA ◽  
CAHYA PURI ARIATI

     The Mandalika circuit project is a large-scale construction project built in the Mandalika Special Economic Zone (SEZ), Central Lombok, West Nusa Tenggara (NTB). The 4.31 kilometer racetrack will have 19 bends, so it requires heavy equipment to improve the quality production and increase project efficiency. The analysis conducted to obtain the hourly productivity, operating cost, income and profit of excavators, dump trucks, motor grader, vibrator roller, and water tanker used in the worksite of Mandalika circuit.      The hourly productivity for structural cut with a depth of 2 to 4 meter of excavator is 17.778 m3/h and dump truck 11.755 m3/h. The excavator production for stockpiling from  excavated  sources  is  30.521  m3/h, dump truck 13.171 m 3/h, motor graders 1839.780 m 3 /h, vibrator roller 90.414 m 3 /h and water tankers truck 71,142 m 3/h. Motor grader production for road body preparation work is 362,222 m3/h, vibrator roller 126,851 m3/h and water tanker truck 62,250 m3/h. The hourly operating cost for the excavator is Rp. 718,048,581, motor grader Rp. 670,416,081, vibrator roller Rp. 609,423,907, and water tanker truck Rp. 380,806,081. The income and profit from the use of heavy equipment are Rp. 39,488,806,755 and Rp. 3,589,981,523.05.

2020 ◽  
Vol 9 (1) ◽  
pp. 71-80
Author(s):  
Munawar Thoharudin ◽  
Fatkhan Amirul Huda ◽  
Tedi Suryadi

The purpose of this study was to find out how the Harapan Jaya Cooperative development in terms of cooperative financial capital and business. In financial capital, there are assets, incomes, and Net Income. While the business is from the business run by the cooperative. This study uses a qualitative descriptive method. In this study, the researcher acts as a data collector and as an active instrument to collect data. This research uses two data sources; they are primary and secondary data. Data collection was conducted by researchers using in-depth interviews, documentation and observation. Data analyzed using qualitative analysis, the validity of the data using the triangulation method. The Harapan Jaya Cooperative Capital development in this study was reviewed from the Solvency, Liquidity and Profitability Ratio. Overall shows good and excellent criteria. The development of the cooperative business is indicated by the addition of income from savings and loan units, management of plasma tubers, dump truck rental, beko heavy equipment rental, motor grader heavy equipment. In addition, business development is also seen from the addition of dump trucks and heavy equipment owned by cooperatives.


2021 ◽  
Vol 1 (2) ◽  
pp. 128-137
Author(s):  
Rio Rahma Dhana ◽  
Armanda Lutfi Febrianto

Reservoir is a container or place for storing raw water, which will later be used as a temporary water storage area, then used as a place for water treatment for the continued growth of rice plants. In addition to rice plants, reservoirs are also used to minimize drought disasters in the dry season. The construction of this reservoir will be used by the Kramat village community to improve the economy in two sectors, namely agriculture and village potential, Kramat village itself is one of the villages in Lamongan Regency which has an area of ​​194.80 hectares and is located in Lamongan sub-district which has a population of 2,012 people. Most of their livelihoods are farmers. Seeing such conditions, farmers need facilities to help meet the needs of raw water for their agricultural land which will be planned with the planning method carried out by the construction of the reservoir with various stages such as measuring with 2 methods, either surveying in the field or utilizing digital applications or software using fields area or Google earth, after finding the size, then we can determine the sketch of the image on the reservoir by drawing in AutoCAD software. The area of ​​land used for the construction of the reservoir has an area of ​​1,452.03 m2, which is later estimated to be able to accommodate 8,507,190 L of water. The total volume of excavation work is 8,507.19 m3 with an estimated work period of 23 days. Excavator pc 200 heavy equipment operational cost : Rp. 101.200.000 per 23 days and for Dump truck capacity of 8 m3: Rp. 2,400,000 (2 dump trucks) per day.


Author(s):  
Humiras Hardi Purba

An operational stop time is a condition where heavy equipment is not working as usual. It is important to avoid this condition since excessive idling wastes an enormous amount of fuel and money. However, the operational stop time of a dump truck Hauller HD465-7 is 2.83 minutes, which is far above the normal standard. This project aims to optimize the improvement of an operational stop time by using a Six Sigma method with optimize plan selection. This will return the operational stop time to the standard range within 1.25 to 1.65 minutes. These steps of define, measure, analyze, improve, and control are applied to the standardization process according to the rules and criteria established by the Six Sigma. The result found that the Six Sigma’s approach which was applied in PT X has reduced the cost from US$1,105,300 to US$963,000 every month. An improvement have been made to matching fleet by combining six fleet of dump trucks at driving speed of 22 km per hour and the average simulated haul distance was 2,000 meters.


2018 ◽  
Vol 4 (1) ◽  
Author(s):  
Dian Febrianti ◽  
Zulyaden Zulyaden

Heavy equipment plays an important role in terms of speed and acceleration of work. The road improvement project of Suka Makmue Square - the eastern ring road of capital of phase II, funding from OTSUS budget of Nagan Raya Regency with project cost Rp.3.922.503.000, - road length 2475 m The work followed is preferred heap work, B-class aggregate foundation layers, class A aggregate foundation layers. This research uses heavy equipment dump trucks, motor graders, roller vibrators, water tanker trucks. The purpose of the research is to know the productivity of heavy equipment and to know the time needed by heavy equipment to complete the work. The method used is the calculation method manually using the formula productivity. Based on the calculation of productivity at occupation of accumulation using dump truck production per hour 32,4 m/hour, production per day 259.2 m/day with 11 days, 6 days class B class aggregate work, 4 days class A class aggregate work, motor grader production hourly 128,3 m /hour, production per day 1026,43 m3/day with time 3 day, 2 days class B class aggregate work, 1 day class A class aggregate work, vibrator roller production hourly 64,8 m3/hour, production per day 518,4 m3/day with time 6 days, 3 days class aggregate layer work B , 2 days class A class aggregate work, water tankers truck production per hour 16.2 m3/hour, production per day 129,6 m3/day with 21 days, 11 days class B aggregate work, 8 days class A class aggregate work  Keywords-productivity, heavy equipment, time of work.


Author(s):  
Brian Bush ◽  
Laura Vimmerstedt ◽  
Jeff Gonder

Connected and automated vehicle (CAV) technologies could transform the transportation system over the coming decades, but face vehicle and systems engineering challenges, as well as technological, economic, demographic, and regulatory issues. The authors have developed a system dynamics model for generating, analyzing, and screening self-consistent CAV adoption scenarios. Results can support selection of scenarios for subsequent computationally intensive study using higher-resolution models. The potential for and barriers to large-scale adoption of CAVs have been analyzed using preliminary quantitative data and qualitative understandings of system relationships among stakeholders across the breadth of these issues. Although they are based on preliminary data, the results map possibilities for achieving different levels of CAV adoption and system-wide fuel use and demonstrate the interplay of behavioral parameters such as how consumers value their time versus financial parameters such as operating cost. By identifying the range of possibilities, estimating the associated energy and transportation service outcomes, and facilitating screening of scenarios for more detailed analysis, this work could inform transportation planners, researchers, and regulators.


2014 ◽  
Vol 989-994 ◽  
pp. 5294-5299
Author(s):  
Wei Ma

Technical risk assessment model of large-scale construction project has been established by using triangle whitening weight function of grey theory against the problems of technical risk assessment of large-scale construction project. In the end, through example verification, this model is approved to be feasible and have certain value of reference and utilization in similar problems.


2011 ◽  
Vol 243-249 ◽  
pp. 2613-2617 ◽  
Author(s):  
Xiu Guang Song ◽  
Zheng Ma ◽  
Hong Bo Zhang ◽  
Qian Wang ◽  
Pei Zhi Zhuang

The field monitoring of dangerous landslide is an important measure for guaranteeing its safety, especially when surrounded by large-scale construction. The landslide located nearby a reservoir in Shandong province. To guarantee construction safety, we adopted the automatic monitoring method for monitoring surface displacement and the internal soil pressure. The whole system uses solar power to provide energy and uses GPRS to transfer data. This system not only can provide reliable information for project construction, but also promote the application of environmentally friendly, low carbon in the monitoring field of civil engineering.


Energies ◽  
2021 ◽  
Vol 14 (10) ◽  
pp. 2832
Author(s):  
Andrzej J. Osiadacz ◽  
Małgorzata Kwestarz

The major optimization problem of the gas transmission system is to determine how to operate the compressors in a network to deliver a given flow within the pressure bounds while using minimum compressor power (minimum fuel consumption or maximum network efficiency). Minimization of fuel usage is a major objective to control gas transmission costs. This is one of the problems that has received most of the attention from both practitioners and researchers because of its economic impact. The article describes the algorithm of steady-state optimization of a high-pressure gas network of any structure that minimizes the operating cost of compressors. The developed algorithm uses the “sequential quadratic programming (SQP)” method. The tests carried out on the real network segment confirmed the correctness of the developed algorithm and, at the same time, proved its computational efficiency. Computational results obtained with the SQP method demonstrate the viability of this approach.


Author(s):  
A. G. Zhuravlev ◽  
M. V. Isakov

The high importance of optimizing the operation of quarry transport is confirmed by the leading share of its costs in the total cost of mining. The current direction of optimization is the development and implementation of digital technologies for processing complex data on the parameters of transport vehicles. The solution of the above issues should be based on the results of scientific research on the collection and processing of information. Developed a set of techniques to perform experimental measurements of working parameters of mining dump trucks as part of a special unit experiments, and long monitoring measurements. A set of equipment for performing experimental measurements, as well as its installation on a dump truck is presented. The data of experimental measurements and a methodical approach to their analysis are presented. In particular, it shows the identification of operating modes of the power plant and the construction of the load diagram, the identification of elements of the transport cycle, etc. The approach to substantiation of innovative designs of power plants adapted to the conditions of a particular quarry is shown on the example of calculated schedules of energy consumption and reserve of recovery of braking energy. The proposed hardware-methodical complex is a research model for the development of methods for automated data collection and processing in the formation of elements of digital mining production.