scholarly journals An Investigation on Construction Crisis Framework Based on the CRITIC and WASPAS Methods, a Case Study; Khuzestan province (Iran)

Author(s):  
Mousavi Dehmourdi, Seyed Ali ◽  
M. Gopal Naik ◽  
Ravande Kishore

The crisis in construction industry are deemed a negative event in the security, economic, political, materials, or natural affairs, especially when they occur abruptly, with little or no warning; and it has always caused damage, therefore crisis management is necessary to order not turn crisis into a disaster. The present study focuses on exploring the impact of the crisis in construction projects by offering a review of the literature to identify the various associated crisis and made a case study of ‟Khuzestan province (Iran). First, through a questionnaire survey with construction experts as respondents, the initial list of 222 sub-factors were confined to a list of 174 essential crisis sub factors and were grouped under 20 main crisis factors. Second, the shortlisted 174 essential crisis sub factors conduct a questionnaire-based survey with top experts from ‟Khuzestan province (Iran) construction organization as respondents to obtain the Importance of each sub factors based on the rating of its impact the second list and using CRITIC method to weighting crisis factors. Third, ranking the influential sub crisis factors from the all sub factor list and provide a single list without considering the initial list crisis through WASPAS model. Finally, The result of the crisis effects rating, seen that the most crisis effects rating in the Khuzestan construction industry is the economic crisis, followed by the market and real estate, and then insurance, maintenance, after that respectively, logistics, and materials crises. Identify the crisis is the main part of crisis management; the obtained results help construction crisis managers and all stakeholders to achieve sustainable development in construction projects. Identifying and prioritizing construction-specific crises allow sustainable crisis managers to concentrate to be successful projects.

2019 ◽  
Vol 25 (4) ◽  
pp. 306-321 ◽  
Author(s):  
Rachel Perez Palha ◽  
Adiel Teixeira De Almeida ◽  
Danielle Costa Morais ◽  
Keith W. Hipel

Selection processes in civil engineering infrastructure projects might require more time and effort than the decisionmakers involved in these projects are normally prepared to devote to running them. A novel approach is proposed to sort these activities into classes that represent their impact on the project, namely additive-veto sorting model, which should be considered before any bidding procedure. Therefore, problems regarding the client’s satisfaction caused by subcontractors can be avoided, and the decision-makers involved in the selection problem can devote to each class an effort compatible with the impact that activity might have on the project. The novelty of this method is that it was built to reflect the quasi-compensatory rationality of decision-makers in the construction industry; it provides them with insights on subcontractors’ activities, and it is grounded on and inspired by a real case study. The new parameters proposed within this model introduce the idea of vetoing an activity being assigned to a class when this activity is incompatible with the decision-maker’s preferences. By using this novel method, the authors succeeded in finding results that avoided a complete compensation amongst the factors considered, taking into account ranges that would be of significant importance in the decision process.


2021 ◽  
Vol 37 (04) ◽  
pp. 433-443
Author(s):  
Wajid Alim ◽  
Sabahat Nisar ◽  
Rabia Asif

The spread of COVID-19 has obstructed construction projects worldwide owing to disruptions in supply chain, restriction on the combine work and legislative enforcements. Construction projects from developing economies are more susceptible to these challenges. The aim of this research is to identify factors caused by COVID-19 impacting progress of construction projects and review tools to lessen its negative impact. Multistep methodology is adopted using semi-structured interviews with construction experts to identify factors affected the progress during COVID-19; and data collection from professionals to quantify the significance of each identified factor; Cronbach’s alpha for reliability and multiple regression to assess the effect of COVID-19 on progress of construction projects. The findings show that COVID-19 has left severe issues at the operational and financial levels. The remedies use to correct these issues will help policymakers from construction industry to improve existing strategic plans and develop new policies to manage the issues caused by COVID-19.


Neutron ◽  
2022 ◽  
Vol 21 (2) ◽  
pp. 52-59
Author(s):  
Liliana Hannes ◽  
Julistyana Tistogondo

Accelerating infrastructure development in Indonesia is a good thing, but this is not without problems. The COVID-19 pandemic is a problem that has a large and global impact, not least in Indonesia, especially in the construction industry sector. The construction project of the Soedono Madiun Hospital is one of the construction projects that have experienced the direct impact of the COVID-19 pandemic. Therefore, the purpose of this study is to review and analyze the impact of the covid-19 pandemic on construction projects in the case study of the construction project of the Soedono Madiun Hospital, and to find out the biggest impact of the covid-19 pandemic which has the most influence on construction projects in the case study of the construction project of the Soedono Hospital. Madison. The research method used to determine the biggest impact of the covid-19 pandemic on the cost and time aspects is the multiple linear regression analysis method with the help of Microsoft Excel. The other data analysis methods used in this study were the validity and reliability tests used in testing the questionnaire. The results of data analysis conducted in this study indicate that there are seven independent variables affect the dependent variable, namely the suitability of planning and project realization with the equation y= 94.186-0.376x1-0.108x2-1.014x3+0.873x4 for the time aspect, and the equation y=87,009 -0.0006x5-0.001x6-0.0002x7 for the cost aspect. With this equation, it can be seen that the independent variable that has the most influence on the dependent variable on the time aspect is the independent variable X3, namely the change in the time schedule due to delays in the arrival of construction materials by 1.014, while in the cost aspect is the independent variable X6, namely changes in costs due to instability. the price of construction materials is 0.001. So, it is hoped that there will be a project management handling that focuses on the most influential variable, namely construction materials.


2015 ◽  
Vol 3 (2) ◽  
pp. 69-84
Author(s):  
Wadhah Amer Hatem ◽  
Samiaah M. Hassen Al-Tmeemy

     Suicide attacks, bombings, explosions became the part of daily life in Iraq. Consequently, the threat of terrorism put the Iraqi construction sector in the face of unique and unusual challenges that not seen on other countries. These challenges can have extensive impact on construction projects. This paper seeks to examine the impact of the terrorist attacks on construction industry and determine the extent to which the impact of terrorism on construction projects in terms of cost, schedule, and quality. This study adapted quantitative and qualitative approaches to collect data using questionnaire survey and interviews, as well as historical data. The study focused on projects that have been the target of terrorist strikes in Diyala governorate. A variety of statistical procedures were employed in data analysis. The results revealed the extent to which terrorist attacks impact construction projects in terms of cost, time, and quality. The results of this study will enhance the awareness of all construction parties to the impact of the terrorist attacks against construction projects. Eventually, this can develop a risk management assessment and assist contractors to properly protect projects and buildings to minimize injuries and fatalities in the event of terrorism.


Author(s):  
V.V. Verna

The article provides a rationale for methodological approaches to assessing the effectiveness of outsourcing in organizations of the construction industry using the example of outsourcing schemes to perform personnel functions. The conditional example shows the impact of the use of outsourcing on reducing the costs of a construction organization. The main prerequisites for the use of outsourcing in the activities of enterprises in the construction industry are identified, methodological approaches to assessing the cost-effectiveness of personnel outsourcing in the construction industry enterprises are substantiated.


Author(s):  
Bernard Tuffour Atuahene ◽  
Sittimont Kanjanabootra ◽  
Thayaparan Gajendran

Big data applications consist of i) data collection using big data sources, ii) storing and processing the data, and iii) analysing data to gain insights for creating organisational benefit. The influx of digital technologies and digitization in the construction process includes big data as one newly emerging digital technology adopted in the construction industry. Big data application is in a nascent stage in construction, and there is a need to understand the tangible benefit(s) that big data can offer the construction industry. This study explores the benefits of big data in the construction industry. Using a qualitative case study design, construction professionals in an Australian Construction firm were interviewed. The research highlights that the benefits of big data include reduction of litigation amongst projects stakeholders, enablement of near to real-time communication, and facilitation of effective subcontractor selection. By implication, on a broader scale, these benefits can improve contract management, procurement, and management of construction projects. This study contributes to an ongoing discourse on big data application, and more generally, digitization in the construction industry.


2020 ◽  
Vol 2020 ◽  
pp. 1-10
Author(s):  
Thu Anh Nguyen ◽  
Phong Thanh Nguyen ◽  
Sy Tien Do

The construction industry has played an essential role in the process of modernization and industrialization and it has also been a major factor in determining the development of the infrastructure for other economic sectors. Construction companies consider the measurement of work progress, which often wastes time and has a low resolution, to be one of the most challenging problems faced by project management. Therefore, this research aimed to propose practical solutions by applying recent technological achievements of the 4.0 industrial revolution to improve the efficiency of the quantity management process. By utilizing the advantages and features of a BIM model and 3D laser scanning, this paper proposes that adopting a BIM model and 3D laser scanning has the potential to improve the accuracy and efficiency of the quantity management process. The case study demonstrated some typical tasks to evaluate accuracy and efficiency as well as to showcase the research proposal.


2021 ◽  
Vol 53 (1) ◽  
Author(s):  
Sajad Afzali ◽  
Faezeh Taheri Sarmad ◽  
Mojtaba Heidari ◽  
Seyed Hossein Jalali

Urban geology is a preliminary study for the construction and development of cities, which has been more prominent in recent decades in some countries despite its long application history. It assesses the impact of geological and natural phenomena on urban space and available structures. The earthquake on Nov. 21, 2017, inflicted a lot of damage to the city of Sarpol-e Zahab, west of Iran, including financial losses and casualties. Reconstruction of this city and planning for its sustainable development entail conducting urban geological studies. In the present study, the effect of natural phenomena on Sarpol-e Zahab County was studied by investigating its geology and geomorphology. The results showed that, in addition to the earthquake that habitually affected the city of Sarpol-e Zahab, the hazards of other phenomena are also significant. Recorded horizontal acceleration in the recent earthquake confirmed the high seismicity of Sarpol-e Zahab has.


Author(s):  
Mathieu Fokwa Soh ◽  
Daniel Barbeau ◽  
Sylvie Doré ◽  
Daniel Forgues

AbstractRequest for information (RFI) is a formal process used in the Architecture, Engineering and Construction industry to address design flaws that affect communication between designers and contractors. A large number of RFIs are a sign of a lack of precision or coordination in the design documents. However, RFIs produce rich, precise, and structured information. Analyzing their content can help to identify recurring problems between designers and construction teams and better tailor future projects to the working context of the contractors. This article presents a method for identifying recurring issues during the design phase of steel construction projects through the analysis of the contents of RFIs. It is original in using a qualitative content analysis tool that can analyze large quantities of RFIs rapidly. Identifying the recurrent problems of contractors will allow the establishment of rules to be taken into consideration during the design phase of future steel construction projects. A case study of 26 steel construction projects demonstrates the feasibility of this method. This case study shows that, given the same designers and construction teams, recurring problems shown in RFIs do not differ according to the scale of the projects. In this case, the main issue between designers and contractors is the lack and inadequate presentation of information related to the connection of steel components. Identifying these problems can pave the way for initiatives to improve the design phase and can be an essential step in making contractors’ knowledge available to designers early in the projects.


Sign in / Sign up

Export Citation Format

Share Document