Neutron ◽  
2022 ◽  
Vol 21 (2) ◽  
pp. 60-73
Author(s):  
Resi Aseanto ◽  
Ali Ramdani Bagaskara ◽  
Syafwandi ◽  
Agung Sumarno

The increasing number of residents in South Tangerang has an impact on increasing the need for lower housing. The development of vertical housing with the market name of flats, apartments and is the most effective anticipatory solution to overcome land prices which result in market limitations, especially for the upper middle class. This 32-storey apartment project uses a combined foundation system between drill pile foundation & raft foundation. With the combination of these two very massive systems, of course, it will have a very expensive cost to implement and take a long time to complete. In order to avoid cost overruns, the foundation design must look at the possibilities. To determine the efficiency of the combined system foundation design between pile bored foundation & raft foundation, the researchers analyzed the value of the bearing capacity and also the settlement that occurred in the existing foundation using the Poulos method, the equivalent Raft method and the Vesic method. From the results of the study, it was found that the contribution of the pile foundation bearing capacity was 24.10%. the placement of the raft foundation is 75.90% and the settlement analysis using the Poulos 8.95cm method, the 12.41cm Equivalent Raft method and the Vesic 12.1cm method, these three results are close to the maximum settlement limit.


Neutron ◽  
2022 ◽  
Vol 21 (2) ◽  
pp. 80-96
Author(s):  
Agus Fernando ◽  
Syahwandi ◽  
Resi Aseanto ◽  
Agung Sumarno

Abstract The modeled building structure is a regular building, with the number of levels being varied. The structural model is divided into 38-level portals. This research uses the help of the SAP2000 v21 program to facilitate the earthquake analysis process. The results of the study that will be compared are displacements between levels and base shear that occur due to earthquake forces. The results of the analysis have shown that static analysis produces greater results for the structural models compared to dynamic analysis. The difference in displacement between levels produced by the two methods in the three structural models is still included in the displacement limits between levels of permission required in SNI 1726-2012, so that the three models can still be analyzed by static analysis and dynamic analysis. Because the results of displacement and base shear in static analysis are greater than dynamic analysis, static analysis is safer if used for earthquake force loading in general structural calculations. Although in earthquake analysis, dynamic analysis is a more accurate analysis because the analysis process is closer to the actual situation.


Neutron ◽  
2022 ◽  
Vol 21 (2) ◽  
pp. 74-79
Author(s):  
Maria Madalena De Jesus Soares ◽  
Kurniawan

Occupational Safety and Health is the program to protect workers from the dangers of work accidents and occupational diseases that may occur during work. This study was conducted to determine the implementation performance of occupational safety and health program, to find out the obstacles during the implementation occupational safety and health programs, as well as labor laws and regulations relating to OSH on construction projects in Dili Timor Leste. This study collected data by distributing questionnaires to employees who work on the four (4) ongoing construction projects in Dili. Data analysis was carried out on Microsoft Excel which further processed the data using the mean count to determine the average value of the questionnaire and the standard deviation. This study found that the project in Dili has implemented the Occupational Safety and Health program. This can be seen from the overall results of the analysis with a mean value of 4.49 and a standard deviation of 0.473. From these results, it can be concluded that every construction project company prioritizes the implementation of OHS. The second result is the obstacles in applying OHS; from the analysis results show that the barriers from the worker side are rank 1 with a mean value of 2.90 and a standard deviation of 0.925. It can be concluded that many obstacles in implementing the OSH program occur from the workers' side due to the lack of awareness and knowledge of workers about OSH in working on construction projects. The result of the third analysis is Timor Leste's labor laws and regulations. The results of the analysis show that it is sufficient for companies to apply Law no. 4/2012 on employment in the areas of security, hygiene and health in the workplace.


Neutron ◽  
2022 ◽  
Vol 21 (2) ◽  
pp. 112-119
Author(s):  
Kifayat Ali Larik ◽  
Abdul Karim Lashari

In this study it comes under the observation that there is a big effect on employees through Leadership skills. These effective practices make stronger to organization and another aspect with this observation is to clearly justify the effect of styles in a different way like Democratic, autocratic, and participative style on employees for enhancing their performance. The main objective with great Guidance it was analyzed that obviously autocratic style has much effect on employee performance inside the organization. On other side the way of participative is quietly good for further efficiency raising up. This study is based on qualitative approach, whereas Secondary research is on prior behalf. The reason behind this study is to have further discussion widely on employees’ performance as the readers can get bunch of knowledge about it. In secondary research it will be added to putt data via reports general information magazines and general Journal. Making widely valuable to this article it came to know that there is greater impact of Leadership style on employees acts the roe of behavior and its performance. Democratic style is highly useful beneficial for employees at all times while the participation style is also beneficial for employee’s performance on a long-term duration Few further recommendations are under the discussion in this thesis.


Neutron ◽  
2022 ◽  
Vol 21 (2) ◽  
pp. 105-111
Author(s):  
Farrukh Arif ◽  
Muhammad Wasay Uz Zaman ◽  
Rabia Khalid

All the social, economic and industrial development depends on the availability of energy. Since energy demand is increasing exponentially throughout the world, more and more CO2 is being emitted out into the atmosphere, giving rise to global warming. Therefore, establishing a sustainable environment is becoming increasingly important. It has been found through research that domestic sector contributes a great deal to the rising energy consumption. Due to prevailing energy crisis, efforts are being made to reduce the increasing energy consumption and make efficient use of energy by making the buildings energy efficient. For this, realistic assessment of energy use patterns in existing houses and buildings is necessary to assure dataset accuracy. Living lab concept integrated with sensor technologies can be used for assessment of such patterns.  This paper presents living lab concept for sensor-based energy performance assessment of Houses.  First, detailed literature review to benchmark concepts of energy efficiency of buildings, living labs concept, sensor based assessment, energy audit, and application of living lab concept has been discussed. Thereafter, sensors based living lab assessment and living lab approach has been introduced as being utilized by the author in a research project for development of guidelines for energy efficient housing. The paper also highlights important parameters to be monitored that effect energy performance. The concept reflects usefulness of living lab concept for sensor-based energy performance assessment of houses that help in substantial reduction in the energy consumption. As such data can be utilized for both realistic energy simulations by improving level of development of models as well as better usage comparisons with modeled analysis, hence helping in identifying true and effective improvement measures


Neutron ◽  
2022 ◽  
Vol 21 (2) ◽  
pp. 97-104
Author(s):  
Maria Siwi Tiarasari ◽  
Irriene Indah Susanti

The development of the construction world in terms of innovation has become one of the methods of supporting success to gain advantages in terms of cost and time, one of which is the outer wall which can generally categorize into cast-in-situ and precast methods. (1) Comparison of the cost of implementing precast kumkang materials, precast concrete facades, and curtain wall facades. The precast kumkang method is 24% cheaper than the precast concrete method, the precast kumkang method is 87% cheaper than the curtain wall method, and the precast concrete method is 52% cheaper than the curtain wall method. Sorted from the cheapest to the most expensive are precast kumkang facades, precast concrete facades, and curtain wall facades. (2) Comparison of the working time of precast kumkang materials, precast concrete facades, and curtain wall facades with the results, namely curtain wall facades for 31 weeks, kumkang material precast facades for 53 weeks, and precast concrete facades for 55 weeks. Sorted from the fastest to longest, namely curtain wall facades, precast kumkang material facades, and then precast concrete facades.  


Neutron ◽  
2022 ◽  
Vol 21 (2) ◽  
pp. 120-126
Author(s):  
Aasma Solangi ◽  
Adnan Pitafi

The purpose of this study is to explore entrepreneurship education courses offered by public universities of the Jamshoro higher education institutions (HEIs). It examines the scope and the existing status of entrepreneurship in the Jamshoro public universities. Data were based on secondary data taken from official websites, prospectus, departmental reports and universities’ policy documents of the public universities of the Jamshoro Higher, included three public universities by examining their curricula and exploring the status of entrepreneurship of the selected sample from these universities. The results of this study indicated the public universities of the Jamshoro higher education city, just one core course on entrepreneurship was offered to some departments. Furthermore entrepreneurship programs were extremely rare. As a result, this research may encourage policymakers and universities to develop an effective and appropriate syllabus to fill the gap in existing curriculum of not only entrepreneurship but other courses as well.


Neutron ◽  
2022 ◽  
Vol 21 (2) ◽  
pp. 52-59
Author(s):  
Liliana Hannes ◽  
Julistyana Tistogondo

Accelerating infrastructure development in Indonesia is a good thing, but this is not without problems. The COVID-19 pandemic is a problem that has a large and global impact, not least in Indonesia, especially in the construction industry sector. The construction project of the Soedono Madiun Hospital is one of the construction projects that have experienced the direct impact of the COVID-19 pandemic. Therefore, the purpose of this study is to review and analyze the impact of the covid-19 pandemic on construction projects in the case study of the construction project of the Soedono Madiun Hospital, and to find out the biggest impact of the covid-19 pandemic which has the most influence on construction projects in the case study of the construction project of the Soedono Hospital. Madison. The research method used to determine the biggest impact of the covid-19 pandemic on the cost and time aspects is the multiple linear regression analysis method with the help of Microsoft Excel. The other data analysis methods used in this study were the validity and reliability tests used in testing the questionnaire. The results of data analysis conducted in this study indicate that there are seven independent variables affect the dependent variable, namely the suitability of planning and project realization with the equation y= 94.186-0.376x1-0.108x2-1.014x3+0.873x4 for the time aspect, and the equation y=87,009 -0.0006x5-0.001x6-0.0002x7 for the cost aspect. With this equation, it can be seen that the independent variable that has the most influence on the dependent variable on the time aspect is the independent variable X3, namely the change in the time schedule due to delays in the arrival of construction materials by 1.014, while in the cost aspect is the independent variable X6, namely changes in costs due to instability. the price of construction materials is 0.001. So, it is hoped that there will be a project management handling that focuses on the most influential variable, namely construction materials.


Neutron ◽  
2021 ◽  
Vol 21 (1) ◽  
pp. 1-9
Author(s):  
Widodo Budi Dermawan ◽  
Muhamad Yuan Kelvin Fuadi ◽  
Muhammad Isradi ◽  
Amar Mufhidin ◽  
Amar Mufhidin

Transportation is an important part of human life, which has the benefit of facilitating the movement of people and the transportation of goods. This study aims to determine and analyze the locations where accidents often occur along the Cakung - Cilincing road, North Jakarta and determine what factors cause accidents along this road. The research on the analysis of accident-prone areas used the observation method with the quantity data provided by the North Jakarta Police Traffic Unit through IRSMS data, and the survey method was carried out on roads with the recording of passing vehicles, followed by calculations according to MKJI 1997. The results of the study were the location coordinates of the locations that had the highest value Accident-prone, namely segment 3 at the coordinate point -6.140891 to -6.13712 with an AEK value of 80 which causes 6 deaths, 0 serious injuries, 1 minor injury, 5 objects losses, and Rp.13,200,000 material loss. The number of accidents at the coordinate point was 5 incidents. The value of material losses from accidents on Jalan Cakung Cilincing reached Rp. 92,900,000 for the last 4 years from 2016 - 2019. And research on road segment performance obtained LOS A with DS 0.06 in the morning, 0.06 in the afternoon, and 0, 07 in the afternoon.


Neutron ◽  
2021 ◽  
Vol 21 (1) ◽  
pp. 20-26
Author(s):  
Mohammad Irfandio Kurniawan ◽  
Diah Ayu Restuti Wulandari ◽  
Diah Ayu Restuti Wulandari ◽  
Julistyana Tistogondo ◽  
Julistyana Tistogondo

Project development and how to control time and costs in the construction project of a public junior high school 1 Surabaya. This research was conducted with the aim of knowing and comparing the amount of duration and cost after acceleration by using the alternative Earned Value Analysis. The case study in this research takes the construction project of a public junior high school 1 Surabaya which is located in Surabaya. The data needed in this study include the S curve, recapitulation of project cost calculations, a list of budget plans (RAB), and a list of unit wage prices for workers. The research method used is to design network planning, calculate the cost variance and variance schedule for each activity that changes due to changes in the duration of implementation, acceleration of work duration, and determination of the optimum cost and duration due to the application of the Earned Value Analysis method. For the calculation of the variance Schedule on week 34 shows a positive result of Rp. 109,550,470. For the calculation of the cost variance from week 34 shows - Rp. 2,488,159. For the calculation of Estimate at completion (EAC) on week 34 of Rp. 6,663,998,229. For the calculation of Estimate temporary schedule, the evaluation week 34 experienced a delay of 53 days from the original schedule. So the work completion time is 233 calendar days