The Impact of Terrorism on Construction Industry in Iraq

2015 ◽  
Vol 3 (2) ◽  
pp. 69-84
Author(s):  
Wadhah Amer Hatem ◽  
Samiaah M. Hassen Al-Tmeemy

     Suicide attacks, bombings, explosions became the part of daily life in Iraq. Consequently, the threat of terrorism put the Iraqi construction sector in the face of unique and unusual challenges that not seen on other countries. These challenges can have extensive impact on construction projects. This paper seeks to examine the impact of the terrorist attacks on construction industry and determine the extent to which the impact of terrorism on construction projects in terms of cost, schedule, and quality. This study adapted quantitative and qualitative approaches to collect data using questionnaire survey and interviews, as well as historical data. The study focused on projects that have been the target of terrorist strikes in Diyala governorate. A variety of statistical procedures were employed in data analysis. The results revealed the extent to which terrorist attacks impact construction projects in terms of cost, time, and quality. The results of this study will enhance the awareness of all construction parties to the impact of the terrorist attacks against construction projects. Eventually, this can develop a risk management assessment and assist contractors to properly protect projects and buildings to minimize injuries and fatalities in the event of terrorism.

Author(s):  
Van Tam Nguyen ◽  
Bao Ngoc Nguyen ◽  
Toan Quoc Nguyen ◽  
Hai Tuan Dinh ◽  
Anh Tung Chu

The COVID-19 pandemic has generated a wide range of socio-economic disruption, which causes devastating in numerous aspects. Our knowledge of the true health of the construction industry under the ravage of COVID-19 outbreak is largely based on very limited data. This study aims to assess the impact of pandemic on the construction industry through an investigation in Vietnam. Data were collected through 129 respondents whose online questionnaire survey completed according to their recent direct or indirect participation in delivering construction projects during the spread. The implications of COVID-19 on the construction industry were examined based on simple percentage analysis and Relative Importance Index approaches. Three principal facets of the construction industry were considered: firms' business activities, project performance, and workforce demand. The findings highlighted the multilevel, multidimensional nature of the epidemic consequences on the construction sector. Notably, the revenue and profitability, in a general sense, have decreased during the COVID-19 period, while most of the production and business costs had remained unchanged. Further, the pandemic was argued to impair construction practitioners' incomes and mental health and sabotage projects' schedule and cost.


2021 ◽  
Author(s):  
Felipe Araya ◽  

Multiple studies have found that productivity in Chilean construction has been stagnated during recent decades; thus, creating the need to understand better what factors have led to these results in the construction sector. In the international literature, studies have found that changes are the leading cause of productivity losses in construction projects; however, limited studies have been done in Chile in this regard. This context is understood as an opportunity to learn from the existing literature about the impact of changes in construction productivity, more importantly, such learning can contribute to the discussion of productivity improvement in the Chilean construction sector. This study recommends that more studies are necessary to be done in Chile regarding the impact of changes in construction projects. Namely, future studies should be based on an extensive database of projects so that generalization can be drawn for the construction industry. Additionally, the data collection process of changes in construction should be improved, paying specific attention to the size of changes, the timing of changes, and the scale of assessment—namely activity, project, and industry levels. Ultimately, this study aims to contribute to the discussion about productivity improvement in Chilean construction as this remains one of the main challenges in the industry


2019 ◽  
Vol 11 (3) ◽  
pp. 926 ◽  
Author(s):  
Gui Ye ◽  
Yuhe Wang ◽  
Yuxin Zhang ◽  
Liming Wang ◽  
Houli Xie ◽  
...  

Total factor productivity (TFP) is of critical importance to the sustainable development of construction industry. This paper presents an analysis on the impact of migrant workers on TFP in Chinese construction sector. Interestingly, Solow Residual Approach is applied to conduct the analysis through comparing two scenarios, namely the scenario without considering migrant workers (Scenario A) and the scenario with including migrant workers (Scenario B). The data are collected from the China Statistical Yearbook on Construction and Chinese Annual Report on Migrant Workers for the period of 2008–2015. The results indicate that migrant workers have a significant impact on TFP, during the surveyed period they improved TFP by 10.42% in total and promoted the annual average TFP growth by 0.96%. Hence, it can be seen that the impact of migrant workers on TFP is very significant, whilst the main reason for such impact is believed to be the improvement of migrant workers’ quality obtained mainly throughout learning by doing.


2021 ◽  
Vol 14 (2) ◽  
pp. 62-70
Author(s):  
Huda Yaseen ◽  
Hafeth I. Naji

Construction projects are of a special nature affected by many factors, which makes them exposed to multiple risks that may lead to the abandonment of projects. Recently, the Iraqi construction sector is facing a number of problems. Abandoned construction projects are one of the most common and dangerous problems in the construction industry in Iraq, with their negative effects on stakeholders, the economy, and the environment due to the lack of sufficient financial and administrative capabilities to complete construction projects, which is reflected in exceeding the time limit for the completion of projects. The aim of this research is to use the analytic network process (ANP) technique to choose the best form of Public-Private Partnership (PPP) contracts to fund abandoned projects in Iraq. using a questionnaire survey to determine the most criteria and alternatives for selecting appropriate financing for the abandoned project. The results shown final weight of the Build-Own-Operate (BOO) contract from ANP is 0.533, which is the best form of PPP contract among the alternatives proposed to fund the project.


2016 ◽  
Vol 05 (07) ◽  
pp. 01-07
Author(s):  
Akram Subhe Suleiman ◽  
Jafar Subhi Hardan Abahre

An exhaustive literature search revealed that not much research has been done on factors causing problems in managing a construction project in a country under military occupation like Palestine. So, it is the main goal of this research is to identify these factors which could be used by the decision makers to select the appropriate project manager who bosses the suitable skills and competencies to deal with these problems. The study is a step toward determining means to improve the effectiveness of projects through identifying project manager competencies. It is important for Palestinian construction industry to progress in terms of project success; the problems that face the project managers must be determined and identified, in order to achieve the best results with less risk. A clear understanding of such problems helps the Palestinian construction industry of finding the suitable solutions to overcome these problems. A questionnaire survey was carried out to achieve the main aim of this research. The respondents were engineers have more than 3 years in the position of project manager in the Palestinian construction industry. The survey was based on factors drawn from findings of another researches in different countries, together with special factors identified as potentially affecting Palestine. The results identified many factors created problems; they were clustered in eight groups. These groups were arranged according to respondents in descending order as follows: the political situation of Palestine, lack of consultants` technical competencies, lack of resources, insufficient planning, team members uncommitted, conflicts between departments, breakdowns in communications, and changes in goals. As a result of this study one could conclude that managing a project in Palestine is as difficult as the complication of the political situation of the country. The project manager should have a complicated mixture of skills and competencies from dealing with Israeli occupation to dealing with stakeholders to lack of resources and unclear goals. The study has recommended to the Palestinian government to improve the regulations and laws to meet the impact of closure and segmentation of the Palestine.


Author(s):  
Martin Loosemore

The construction innovation literature suggests that managers face a stark choice. They can innovate or perish in the face of growing global competition and an increasingly uncertain and dynamic world. Innovation is presented as a key area of reform needed to raise business performance, yet at the same time it is argued that Australia is falling behind in the global innovation stakes. Evidence suggests that the Australian Construction sector is a poor innovation performer when compared to all-industry averages and contributes relatively little to the national innovation effort. Drawing on international innovation research, this paper argues that these views are overly simplistic and explores some of the myths that surround the process in the construction industry. Through interviews with some of Australia’s leading innovators and policy-makers it suggests that many of the factors that are said to drive innovation are not as straight forward as they may seem. There are important qualifications to consider and it would seem that construction innovation is a highly interactive and amorphous process, involving many people with multiple interests dealing with day-to-day challenges.Keywords: Innovation, opportunism, strategy, risk.


2010 ◽  
Vol 18 (1) ◽  
pp. 17-23
Author(s):  
E. Jankovichová

The global economy and its influence on the Slovak construction sectorFor the construction industry, globalization is a trend that means two things: many opportunities and many threats. In the conditions of globalization many management approaches, such as organization structure, strategy forming, planning, motivation and control procedures, communication channels, risk management, etc., must transform. The aim of the paper is to analyze the influence of globalization on the construction industry in Slovakia and identify the impact of globalization on construction companies in this area.


Author(s):  
Charles Townshend

Terrorism: A Very Short Introduction examines the historical, ideological, and local roots of terrorist violence and explores terrorism in relation to revolutionary power, nationalism, and religious extremism. Is one person’s terrorist another’s freedom fighter? Is terrorism crime or war? What can we do to stop it? For many, the terrorist attacks of September 2001 changed the face of the world, pushing terrorism to the top of many political agendas. This VSI considers recent changes in terrorism, such as the emergence of ISIS and upsurge in individual suicide action, looking at the impact and consequences of several recent terrorist attacks, and outlining the complex issues related to antiterrorist and counterterrorist measures.


2019 ◽  
Vol 26 (8) ◽  
pp. 1625-1640 ◽  
Author(s):  
Manuel Alexander Silverio-Fernandez ◽  
Suresh Renukappa ◽  
Subashini Suresh

Purpose The decentralisation of information and high rate of mobile content access in the construction industry provides an ideal scenario for improvement of processes via the implementation of the paradigm of the Internet of Things (IoT). Smart devices are considered as the objects interconnected in the IoT; therefore, they play a fundamental role in the implementation of digital solutions during the execution of construction projects. The purpose of this paper is to assess the critical factors for a successful implementation of smart devices in the construction industry. Design/methodology/approach An empirical study was performed in the Dominican Republic. This country, located at the heart of the Caribbean, presents an economy that strongly relies on the construction industry. Following a systematic approach, a qualitative data collection and analysis was performed based on semi-structured interviews and content analysis to professionals of construction companies in the Dominican Republic, enquiring the concept of smart devices and critical success factors for implementing the devices in the industry. Findings The key success factors obtained from the contestants were leadership, technology awareness, company size, usability of proposed solution, cost of implementation and interoperability. Originality/value This paper provides information to clients of the construction sector regarding the benefits of embedding smart devices into their business activities. Furthermore, this study provides a better understanding of the key factors to be considered by construction organisations when embedding smart devices into their projects. This study also provides recommendations for distinct stakeholders of the construction sector, such as policy makers, clients and technology consultants. Policy makers should especially consider factors such as technology awareness and leadership to develop the right policies for the integration of the IoT in construction projects. Technology consultants should be aware of the latest case studies of successful implementation of smart devices and IoT systems in the world in order to adapt and implement smart devices and IoT in their projects.


Author(s):  
Tochukwu Moses ◽  
David Heesom ◽  
David Oloke

It is clear that challenging economic times inspire innovative abilities and solutions in the construction industry. In particular many of these innovations focus on cost implications, saving project time, reducing or eliminating waste, increasing productivity or redefining value. There is increasing pressure in the UK construction industry for new construction innovations, technology and processes with ability to lever a significant impact relative to disrupting the existing status quo; creating solutions that promote construction efficiencies deploying means to exploiting offsite construction approaches. The increased concern and challenge globally is that as knowledge and experience grows, the offsite manufacturers and suppliers are expected to demonstrate absolute innovative solutions that will heighten the proportion of project value being delivered through the use of offsite solutions on the bases that it makes sound project and business sense. Unparalleled huge cost saving benefits to clients and end users which is more than just creating a model is yet to be realized.