scholarly journals Analysis Of The Impact Of The Covid-19 Pandemic On The Construction Industry Sector

Neutron ◽  
2022 ◽  
Vol 21 (2) ◽  
pp. 52-59
Author(s):  
Liliana Hannes ◽  
Julistyana Tistogondo

Accelerating infrastructure development in Indonesia is a good thing, but this is not without problems. The COVID-19 pandemic is a problem that has a large and global impact, not least in Indonesia, especially in the construction industry sector. The construction project of the Soedono Madiun Hospital is one of the construction projects that have experienced the direct impact of the COVID-19 pandemic. Therefore, the purpose of this study is to review and analyze the impact of the covid-19 pandemic on construction projects in the case study of the construction project of the Soedono Madiun Hospital, and to find out the biggest impact of the covid-19 pandemic which has the most influence on construction projects in the case study of the construction project of the Soedono Hospital. Madison. The research method used to determine the biggest impact of the covid-19 pandemic on the cost and time aspects is the multiple linear regression analysis method with the help of Microsoft Excel. The other data analysis methods used in this study were the validity and reliability tests used in testing the questionnaire. The results of data analysis conducted in this study indicate that there are seven independent variables affect the dependent variable, namely the suitability of planning and project realization with the equation y= 94.186-0.376x1-0.108x2-1.014x3+0.873x4 for the time aspect, and the equation y=87,009 -0.0006x5-0.001x6-0.0002x7 for the cost aspect. With this equation, it can be seen that the independent variable that has the most influence on the dependent variable on the time aspect is the independent variable X3, namely the change in the time schedule due to delays in the arrival of construction materials by 1.014, while in the cost aspect is the independent variable X6, namely changes in costs due to instability. the price of construction materials is 0.001. So, it is hoped that there will be a project management handling that focuses on the most influential variable, namely construction materials.

2019 ◽  
Vol 5 (1) ◽  
pp. 13-19
Author(s):  
Fitri Nur Kharina ◽  
Kusno Adi Sambowo

Construction projects in all regions continues to be developed for the creation of facilities that can be utilized by the community. One of them is the construction of apartments which are now being intensively carried out to meet residential needs for the community. Making a construction project plan always refers to estimates that exist at the time development plan is made, therefore problems can arise if there is a discrepancy between the plans that have been made and the actual reality. So the impact that often occurs is the delay in the time of project implementation which can also be accompanied by an increase in the cost of implementing the project. In the construction project of Cinere Terrace Suites Apartemen & Citywalk, Jakarta there was a delay resulting in a late payment of monthly bill progress by the owner. Based on the above reasons, this research was conducted to find out how the project performance was seen from the cost and time period of the review period. how is the estimated cost and time to complete the overall project work. The method used in the analysis of this study is the Earned Value Method. Based on the results of the analysis carried out for 29 weeks the project performance on schedule has been delayed and cost shows a positive value. For the estimated completion time of the project there is an increase in time whose duration increases from the planned 98 weeks or 685 days to 109,624 weeks or 768 days. While the estimated cost of completing the project from the results of the analysis obtained a value of Rp. 270,147,448,569.16 smaller than the planned cost of Rp. 315,272,727,272.73. With the difference VAC of Rp. 45,125,278,703.57 this shows that there are benefits obtained by the contractor.


Author(s):  
Mousavi Dehmourdi, Seyed Ali ◽  
M. Gopal Naik ◽  
Ravande Kishore

The crisis in construction industry are deemed a negative event in the security, economic, political, materials, or natural affairs, especially when they occur abruptly, with little or no warning; and it has always caused damage, therefore crisis management is necessary to order not turn crisis into a disaster. The present study focuses on exploring the impact of the crisis in construction projects by offering a review of the literature to identify the various associated crisis and made a case study of ‟Khuzestan province (Iran). First, through a questionnaire survey with construction experts as respondents, the initial list of 222 sub-factors were confined to a list of 174 essential crisis sub factors and were grouped under 20 main crisis factors. Second, the shortlisted 174 essential crisis sub factors conduct a questionnaire-based survey with top experts from ‟Khuzestan province (Iran) construction organization as respondents to obtain the Importance of each sub factors based on the rating of its impact the second list and using CRITIC method to weighting crisis factors. Third, ranking the influential sub crisis factors from the all sub factor list and provide a single list without considering the initial list crisis through WASPAS model. Finally, The result of the crisis effects rating, seen that the most crisis effects rating in the Khuzestan construction industry is the economic crisis, followed by the market and real estate, and then insurance, maintenance, after that respectively, logistics, and materials crises. Identify the crisis is the main part of crisis management; the obtained results help construction crisis managers and all stakeholders to achieve sustainable development in construction projects. Identifying and prioritizing construction-specific crises allow sustainable crisis managers to concentrate to be successful projects.


2021 ◽  
Vol 33 (2) ◽  
Author(s):  
Mohd Ashraf Mohd Fateh ◽  
Tan Hee Yee

Every activity in a construction project is related to time and cost. Delay is considered common and often occurred in a construction project. A slight delay can be very costly. It will impact all of the related stakeholders. This paper seeks to identify the financial issues in the construction industry and the impact of the financial issues towards the projects in Malaysia. Literature reviews and questionnaire surveys were used to carry out the study. The data collected were analysed via Microsoft Excel and SPSS software. The paper reveals that the withholding of payment by the approval parties is the critical financial issues in Malaysia’s construction industry, while the main impact when the financial issues occurs is where the project is delayed/postponed/terminated. The findings of this research will give a good insight to the industry and help to improve the local players’ competitive capabilities as highlighted by the Construction Industry Development Board (CIDB) in the Construction Transformation Programme (CITP) 2016-2020 and in line with the Sustainable Development Goals (SDGs) that was introduced by the United Nations (UN).


2018 ◽  
Vol 24 (7) ◽  
pp. 114
Author(s):  
Sawsan Rasheed Mohammed ◽  
Asmaa Jebur Jasim

The avoidance of failure in construction projects is not an easy task, which makes the failure of the construction project to achieve its objectives a major problem experienced by all countries in the world, especially Iraq. Where nearly two-thirds of the construction projects in the world have been suffered by significant problems as an increase in the cost of the project, delay in the specified duration for execution, and stopping the project. Therefore it is required to study and apply new methods for managing the construction project to ensure its success and achieve its objectives. The aim of this study is to study the Agile project management method and its impact on the construction project. In addition, to identify the values and principles of Agile project management, which can be applied in the Iraqi construction industry to be adopted it as a new method to manage the construction projects in Iraq. The researcher reviewed the relevant literature to define the method of Agile project management and its methods and impact on the construction project. Then, the researcher conducted a questionnaire survey of a sample of engineers' experts who work in four main parties in the construction project: (beneficiary, supervising, designer, and contractor). The results of this survey showed that it is possible to apply the four values of Agile project management for managing the Iraqi construction projects, and can apply eleven of the twelve principles of Agile project management for managing the Iraqi construction projects.  


Construction is questionably a main part in relative to comprehensive development . It plays an important part in the role in the economy as and in people’s survives over influencing and preserving the environment of the city-region’s constructed, and it is a rising sector. To provide an efficient performance and more development of the economic, there is emphases on optimizing the employees contribution to the goals and areas of the governments. The training significance as a management central part has long been documented by principal writers.This paper aim to find the impact of training in the construction industry and how the training is been underestimate lead in increase the cost by using the simulation technique system dynamic. The research methodology include designing of questionnaire that consist of three items , the first item include , general Training (Training Program), evaluation of on-the-job training and evaluation of training after establishing work and the second part include building the model using system dynamic to show the effect of training on the cost of construction. the results the authors made the following conclusions .The absence of training program has very strong effect as the absence of such program is caused by the finance absence , this is common problem with Iraqi construction industry. The most environment of the Iraqi industry is the absence of the finance from both owner and contractor as they ignore this part and consider unnecessary expenses and this will lead to unqualified engineering or worker in the wrong job .The absence of management mean that , usually the contractor and his staff are working without the supervise or represented from the owner side , which some time mean unskilled workers may be hired which lead to delay of the work and cost overruns .


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Muhammad Sami Ur Rehman ◽  
Muhammad Tariq Shafiq ◽  
Muneeb Afzal

Purpose The coronavirus disease 2019 (COVID-19) pandemic has affected the global economy and, thus, the global construction industry. This paper aims to study the impact of COVID-19 on construction project performance in the United Arab Emirates (UAE). Design/methodology/approach This study adopted a qualitative and exploratory approach to investigate the impact of COVID-19 and its policies on project performance in the UAE construction industry in critical areas of the project management body of knowledge (e.g. schedule, cost, resources and contracts). Semi-structured interview questions were asked from ten construction professional to obtain valuable insights into the pandemic’s effects on the UAE construction industry and the effectiveness of policies implemented to rectify the damage and identify the industry’s new normal. Findings The findings indicate that the construction industry faced several challenges such as schedule delays, disrupted cashflows, delayed permits, approvals and inspections, travel restrictions, serious health and safety concerns, material and equipment shortages, among others which hindered the timely delivery of construction projects. It also indicates that efforts made by the government institutions and the construction industry of the UAE such as economic support programs, digitization of processes, fee and fine waivers, health facilities, among other statutory relaxations proved effective in supporting the construction industry against the adverse effects of the pandemic. Research limitations/implications The research findings are limited to the literature review and ten semi-structured interviews seeking an expert’s opinion from industry professionals working in the UAE construction industry. The research team did not get access to project documents, contracts and project progress reports which may be required to validate the interview findings, and to perform an in-depth analysis quantifying the impact of COVID 19 on construction projects performance, which is a limitation of this research. Practical implications The implication is that, owing to the imposed lockdowns and strict precautionary measures to curb the rapid spread of the pandemic, smooth execution of the construction project across the country was affected. The government institutions and stakeholders of the construction projects introduced and implemented various techniques and solutions which effectively handled the implications of the COVID-19 pandemic on the construction industry of the UAE. Originality/value This study has identified the challenges faced by the construction industry of the UAE in the context of the management of project schedule, project cost, construction contracts, health and safety of construction employees and other related aspects of the construction projects. This study also identified the techniques and solutions adopted by various public and private institutions of the country and their implications on construction projects. Therefore, this study provides guidelines for policymakers and future research studies alike.


2011 ◽  
Vol 11 (3) ◽  
pp. 1-17 ◽  
Author(s):  
Carlos Torres Formoso ◽  
Eduardo Luis Isatto

The success of construction projects is highly dependent on the coordination of a fairly large number of stakeholders, such as client organizations, designers, general contractors, and subcontractors. Each of those stakeholders can both affect and be affected by the way a project is managed, and none of them usually has the power or the ability to coordinate project supply chains. However, the existing literature on supply chain management does not provide a comprehensive theoretical foundation for describing or explaining the coordination of construction project supply chains. This paper discusses the role of three different theoretical perspectives for understanding the inter-firm coordination process of project supply chains in the construction industry: the Theory of Coordination, the Transaction Cost Theory and the Language-Action Perspective. The contribution of each theoretical approach is pointed out in the paper, and their complementary role is illustrated in a case study carried out in a petrochemical construction project in Brazil.


2021 ◽  
Vol 331 ◽  
pp. 01014
Author(s):  
Yervi Hesna ◽  
Jati Sunaryati ◽  
Ayu Hidayati

The paper provides a thorough examination of the impact of COVID-19 on increasing the cost of the construction project. The pandemic of COVID-19 had disrupted the financial and operational of the construction industry. Many projects have been closed and suspended, and this situation has caused great uncertainty in the construction industry. Even though the Instruction of the Minister of Public Work No. 2/2020 issued March 27, 2020, stated that construction activities in Indonesia could continue work. However, it still believes COVID-19 can lead to poor project cost performance. The study used a literature review to explore the factors contributing to the increase in project cost. A case study in the hotel construction project is used to test the factors. The research found six factors have a frequency of occurrence for each cause of cost overrun, namely labor, material, implementation time, project financial aspects, estimated cost, and occupational health and safety. The case study’s two factors are not the cause of the cost overrun based on the interviewee’s answer: heavy equipment and overhead. This paper also explains the mechanism to address cost overrun continue in construction work.


Author(s):  
Eliseu Soares Parerira Amaral

The process of implementing development projects has many obstacles that were not predicted beforehand resulting in delays in project completion which have an impact on increasing the cost of project implementation. sometimes the project is not completed in accordance with a predetermined schedule that may be caused by certain factors. Various ways can be done to anticipate and be a solution to the delay. The purpose of the study is to analyze the factors that influence delays in bridge construction projects in Bidau Timor - Leste and how to anticipate delays in project work. The research method used is descriptive method by observation and direct interviews. So that there are several dominant factors that influence the delay of the Bidau Timor-Leste bridge construction project, including the types of weather, material and financial. To anticipate delays in construction projects, it is necessary to do a work contract in accordance with the contract law in which all matters are regulated, so that the anticipation, mitigation and accountability are clear. Identification of the application of overcoming delays in the Bidau Timor-Leste bridge construction project if viewed from the side of the existing contract there are still shortcomings, so it needs to be improved in terms of working contract documents and refer to the contract law.


2019 ◽  
Vol 25 (4) ◽  
pp. 306-321 ◽  
Author(s):  
Rachel Perez Palha ◽  
Adiel Teixeira De Almeida ◽  
Danielle Costa Morais ◽  
Keith W. Hipel

Selection processes in civil engineering infrastructure projects might require more time and effort than the decisionmakers involved in these projects are normally prepared to devote to running them. A novel approach is proposed to sort these activities into classes that represent their impact on the project, namely additive-veto sorting model, which should be considered before any bidding procedure. Therefore, problems regarding the client’s satisfaction caused by subcontractors can be avoided, and the decision-makers involved in the selection problem can devote to each class an effort compatible with the impact that activity might have on the project. The novelty of this method is that it was built to reflect the quasi-compensatory rationality of decision-makers in the construction industry; it provides them with insights on subcontractors’ activities, and it is grounded on and inspired by a real case study. The new parameters proposed within this model introduce the idea of vetoing an activity being assigned to a class when this activity is incompatible with the decision-maker’s preferences. By using this novel method, the authors succeeded in finding results that avoided a complete compensation amongst the factors considered, taking into account ranges that would be of significant importance in the decision process.