scholarly journals Effective Utilization of Transmission Line Capacity in a Meshed Network with Series Capacitor Upto its Thermal Limit

Power system networks are becoming interconnected for the purpose of power delivery to decrease the overall power generation cost. With insufficient control, the power systems become more complicated to function and less secure. The economics of AC power transmission have always forced the planning engineers to transmit as much power as possible through a given transmission line. The smaller and thermally limited lines are crowded in many networks while other higher capacity lines run well below their thermal maximum. When series capacitors are introduced in the higher voltage cables, power may be transferred from the overloaded lines, maximizing the use of the existing line as well as complementing the performance of the power system. In this paper, a three-line meshed power system network with different thermal line limits is considered for the purpose of showing effective utilization of line network for maximum power flow through the intended line with series capacitor compensation. The simulations are performed by using PowerWorld simulator confirms the addition of series capacitor increases the power transfer through the line up to its thermal limit

In power systems, voltage stability perform the major role in design and its operation. Major system failures are occur due to voltage variability and breakdown. To meet and compensate the rising power demand of regular usage in modern trends, transmission networks are enormously loaded which create the voltage instability. Contingency analysis is a recognized energy managing tool. It calculate the violation in the transmission line. In this paper a computational controller fuzzy system is suggested to handle the transmission line outage and overload in other branch kind of problems in Power system. The efficiency of power transmission system with fuzzy controller is inveterate by computation of various parameters of transmission bus under different loading situations. For the contingency analysis the transmission power flow several methods have been developed. Fast Decoupled load flow program is the effective method which provides a fast and effective solution to the contingency analysis in the transmission system and also it is incorporate with matrix alteration formula which gives additional advantage for the system.


Energies ◽  
2018 ◽  
Vol 11 (12) ◽  
pp. 3365 ◽  
Author(s):  
Lukas Wienholt ◽  
Ulf Müller ◽  
Julian Bartels

The paradigm shift of large power systems to renewable and decentralized generation raises the question of future transmission and flexibility requirements. In this work, the German power system is brought to focus through a power transmission grid model in a high spatial resolution considering the high voltage (110 kV) level. The fundamental questions of location, type, and size of future storage units are addressed through a linear optimal power flow using today’s power grid capacities and a generation portfolio allowing a 66% generation share of renewable energy. The results of the optimization indicate that for reaching a renewable energy generation share of 53% with this set-up, a few central storage units with a relatively low overall additional storage capacity of around 1.6 GW are required. By adding a constraint of achieving a renewable generation share of at least 66%, storage capacities increase to almost eight times the original capacity. A comparison with the German grid development plan, which provided the basis for the power generation data, showed that despite the non-consideration of transmission grid extension, moderate additional storage capacities lead to a feasible power system. However, the achievement of a comparable renewable generation share provokes a significant investment in additional storage capacities.


Author(s):  
Elutunji Buraimoh ◽  
Funso Kehinde Ariyo ◽  
Micheal Omoigui ◽  
Innocent Ewaen Davidson

Electrical power systems are often required to operate at full loading capacity due to ever increasing demand and transmission line contingencies with limited grid expansion. This results in line overload and operating near system limit, thereby threatening system security. Utilization of existing system can be achieved using Flexible Alternating Current Transmission System (FACTS) devices without violating system limits. This research investigation involves static security assessment of a modelled IEEE 30-bus test system in MATLAB/SIMULINK/PSAT environment. The security status with the incorporation of combined Static Var Compensator (SVC), Thyristor Controlled Series Compensator (TCSC) and Interline Power Flow Controller (IPFC) were determined. Prior to this, Contingency Severity Index (CSI) based on Performance Index (PI) of Voltage and Active Power was employed to determine the optimal location of the FACTS devices. Sequential Quadratic Programming (SQP) was applied to determine the optimal sizing/percentage compensation of FACTS. Subsequently, power system with and without the incorporation of FACTS devices were modelled. The ability of the compensated system to withstand credible transmission line contingencies without violating the normal operating limits (bus voltage and line thermal) was examined and presented. The paper presents how combined SVC/TCSC and an IPFC aided the power system to boost its steady state security in the face of possible line contingencies.


Author(s):  
E. D. Halilov

Power flow control is an important task of development of electric power systems. It is necessary to reduce the power loss, improve the reliability and quality of power supply and increase the power transmission. Currently, on the basis of modern power electronics effective FАСТS devices for flexible control of power system operation modes have been developed. FАСТS devices are able to simultaneously influence the voltage, the reactance, the angle between the voltages. As it is known, the calculations of the established modes of electric systems are the most frequently performed tasks at all the territorial and time levels of control and planning operations. These calculations are significant by themselves, being also an integral part of software systems of calculation of losses of power and energy in electrical networks, calculation of optimal modes and also sustainability. The need for multiple mode calculation imposes high requirements to the methods of calculation of the established modes in real time in terms of performance and reliability of the results of the solution being obtained under operating conditions of electric power systems. In traditional calculations of the established modes of electrical networks, shunt reactors, current-limiting reactors, capacitor banks, longitudinal compensation devices were accounted in the simulation as passive elements. In regard with the introduction of FACTS devices in power systems, there is an arising need to develop appropriate algorithms and implement them in the form of software for analyzing and controlling the established modes of power systems. The methodology and software for calculation of the established modes of electric networks with consideration of FACTS devices have been developed. The software makes it possible to obtain practically acceptable solutions in three outer iterations. Based on the results of numerical simulation of modes of the power system of the “Azerenergy” JSC it was determined that the application of FACTS devices can significantly increase the transmission line active power, improve voltage levels and reduce losses of active power. The dependences of flows and power losses on the control parameter of FACTS devices have been derived. 


2020 ◽  
Vol 9 (1) ◽  
pp. 2540-2544

In the present time scenario, where we use cables and optical fibers for data transmission along with power transmission, locating the flaws and faults in the transmission lines has become a necessity. Transmission lines are among the essential fragments of power systems. Being exposed to climatic fluctuations makes them the most vulnerable fragment. There may be numerous reasons that originate faults in the lines, such as temperature escalation, lightning strokes, even drizzles and fog because insulated carriers to wear out mechanically. It is indispensable to locate the fault point to restore the power at the earliest. Excellence in power delivery is achieved only if the time enforced in determining the flaw point in the line is limited. Accordingly, an authentic access is essential to figure out the literal location of the fault in the transmission line. This project introduces an accurate and adequate approach for determining the location of the line fault. It illustrates how the use of GSM and GPS along with ARDUINO UNO can relatively reduce the human labor and increase the accuracy whilst downsizing the obligatory time.


Author(s):  
B. Venkateswara Rao ◽  
Ramesh Devarapalli ◽  
H. Malik ◽  
Sravana Kumar Bali ◽  
Fausto Pedro García Márquez ◽  
...  

The trend of increasing demand creates a gap between generation and load in the field of electrical power systems. This is one of the significant problems for the science, where it require to add new generating units or use of novel automation technology for the better utilization of the existing generating units. The automation technology highly recommends the use of speedy and effective algorithms in optimal parameter adjustment for the system components. So newly developed nature inspired Bat Algorithm (BA) applied to discover the control parameters. In this scenario, this paper considers the minimization of real power generation cost with emission as an objective. Further, to improve the power system performance and reduction in the emission, two of the thermal plants were replaced with wind power plants. In addition, to boost the voltage profile, Static VAR Compensator (SVC) has been integrated. The proposed case study, i.e., considering wind plant and SVC with BA, is applied on the IEEE30 bus system. Due to the incorporation of wind plants into the system, the emission output is reduced, and with the application of SVC voltage profile improved.


Energies ◽  
2019 ◽  
Vol 12 (2) ◽  
pp. 322 ◽  
Author(s):  
Ping He ◽  
Seyed Arefifar ◽  
Congshan Li ◽  
Fushuan Wen ◽  
Yuqi Ji ◽  
...  

The well-developed unified power flow controller (UPFC) has demonstrated its capability in providing voltage support and improving power system stability. The objective of this paper is to demonstrate the capability of the UPFC in mitigating oscillations in a wind farm integrated power system by employing eigenvalue analysis and dynamic time-domain simulation approaches. For this purpose, a power oscillation damping controller (PODC) of the UPFC is designed for damping oscillations caused by disturbances in a given interconnected power system, including the change in tie-line power, the changes of wind power outputs, and others. Simulations are carried out for two sample power systems, i.e., a four-machine system and an eight-machine system, for demonstration. Numerous eigenvalue analysis and dynamic time-domain simulation results confirm that the UPFC equipped with the designed PODC can effectively suppress oscillations of power systems under various disturbance scenarios.


Energies ◽  
2021 ◽  
Vol 14 (3) ◽  
pp. 737
Author(s):  
Michał Kosmecki ◽  
Robert Rink ◽  
Anna Wakszyńska ◽  
Roberto Ciavarella ◽  
Marialaura Di Somma ◽  
...  

Along with the increasing share of non-synchronous power sources, the inertia of power systems is being reduced, which can give rise to frequency containment problems should an outage of a generator or a power infeed happen. Low system inertia is eventually unavoidable, thus power system operators need to be prepared for this condition. This paper addresses the problem of low inertia in the power system from two different perspectives. At a system level, it proposes an operation planning methodology, which utilises a combination of power flow and dynamic simulation for calculation of existing inertia and, if need be, synthetic inertia (SI) to fulfil the security criterion of adequate rate of change of frequency (RoCoF). On a device level, it introduces a new concept for active power controller, which can be applied virtually to any power source with sufficient response time to create synthetic inertia. The methodology is demonstrated for a 24 h planning period, for which it proves to be effective. The performance of SI controller activated in a battery energy storage system (BESS) is positively validated using a real-time digital simulator (RTDS). Both proposals can effectively contribute to facilitating the operation of low inertia power systems.


2012 ◽  
Vol 433-440 ◽  
pp. 7208-7212
Author(s):  
Ya Min Su Hlaing ◽  
Ze Ya Aung

This thesis implements power flow application, Newton-Raphson method. The Newton-Raphson method is mainly employed in the solution of power flow problems. The network of Myanma electric power system is used as the reference case. The system network contains 90 buses and 106 brunches. The weak points are found in the network by using Newton-Raphson method. Bus 16, 17, 85 and 86 have the most weak bus voltages. The medium transmission line between bus 87 and bus 17 is compensated by using MATLAB program software. The transmission line is compensated with shunt reactors, series and shunt capacitors to improve transient and steady-state stability, more economical loading, and minimum voltage dip on load buses and to supply the requisite reactive power to maintain the receiving end voltage at a satisfactory level. The system performance is tested under steady-state condition. This paper investigates and improves the steady–state operation of Myanma Power System Network.


Sign in / Sign up

Export Citation Format

Share Document