An Introduction to Project End Theory in Project Management

Author(s):  
Umar A. Altahtooh ◽  
Margaret W. Emsley

Almost all project management software has lack of displaying the outcomes of projects as a feature. This is because there is no recognized way of calculating the actual project duration compared to the authorized project duration. Data were collected through a mixed method using a Critical Incident Technique (CIT) and a survey. The study finds that time error can occur throughout the project execution phase. Findings suggest that challenged projects could be successful or failed projects using a model of IT Project Outcomes Testing (MITPOT). Thus, this model establishes a foundation of Project End Theory (PET).

Author(s):  
Daniel M. Brandon

A vast amount of project management software is available today in a wide variety of capabilities, applicability, platform requirements, and prices. These software products significantly enhance the PM’s job of managing a project in almost all aspects, including selection, planning, scheduling, execution, control, risk, and communications. PMs should therefore be aware of the types of tools available and the features and applicability of those tools. In this chapter, types of software products and some specific products are identified and discussed.


2019 ◽  
Vol 29 (7) ◽  
pp. 1065-1079 ◽  
Author(s):  
Roderik F. Viergever

The critical incident technique (CIT) is a qualitative research tool that is frequently used in health services research to explore what helps or hinders in providing good quality care or achieving satisfaction with care provision. However, confusion currently exists on the nature of the CIT: Is it a method for data collection and analysis or a methodology? In this article, I explain why this distinction is important and I argue that the CIT is a methodology (and not a method) for the following reasons: Key methodological dimensions are described for the CIT; it has a clear focus; studies that apply this technique make use of various methods for data collection and analysis; it describes, explains, evaluates, and justifies the use of a specific format for those methods; it implies philosophical and practical assumptions; and studies that use the CIT cannot easily make use of additional methodologies simultaneously.


2012 ◽  
Vol 7 (2) ◽  
pp. 126
Author(s):  
Henry Chong ◽  
Violitta Yesmaya ◽  
Ardian Eko Y.P. ◽  
Novita Sariand ◽  
Zakharia Yudistia Malino

There is nothing in this world that do not change unless the change itself. Almost every aspect of the world, particularly the world of IT, can changed. In project management software, for instance, people have to work on software that frequently subject to change. That is why the greatest challenge faced by the company within today's competitive world is how to deal with those changes. In relation with the previous explanation, the objective of this research is to standardize project management in software development by using change management. Objective will finally help project developer to ensure that the management of project has a need of standardization that essential for reflecting the current business needs. To achieve the objectives, this research will also attempt to show why does the standardization using the change management is essential task, which is almost inevitable. This research directed for discussing about the management of change as a common way to reduce risks, costs and maximizing the benefit from major changes in business and information technology. The result showed that the project can determined as success because it delivered on time, on budged and have a standardized quality. Tidak ada di dunia ini yang tidak berubah kecuali perubahan itu sendiri. Hampir setiap aspek dunia, khususnya dunia IT, dapat berubah. Dalam perangkat lunak manajemen proyek, misalnya, orang harus bekerja pada perangkat lunak yang sering mengalami perubahan. Itu sebabnya tantangan terbesar yang dihadapi perusahaan dalam dunia yang kompetitif saat ini adalah bagaimana menghadapi perubahan tersebut. Sehubungan dengan penjelasan sebelumnya, tujuan dari penelitian ini adalah untuk standarisasi manajemen proyek dalam pengembangan perangkat lunak dengan menggunakan manajemen perubahan. Tujuan akhirnya akan membantu pengembang proyek untuk memastikan bahwa manajemen proyek memiliki kebutuhan standarisasi yang penting untuk mencerminkan kebutuhan bisnis saat ini. Untuk mencapai tujuan tersebut, penelitian ini juga akan mencoba menunjukkan mengapa standarisasi menggunakan manajemen perubahan adalah tugas penting yang tidak dapat dihindari. Penelitian ini diarahkan untuk membahas tentang manajemen perubahan sebagai cara umum untuk mengurangi risiko, biaya dan memaksimalkan manfaat dari perubahan besar dalam bisnis teknologi dan informasi. Hasil penelitian menunjukkan bahwa proyek tersebut dapat dinyatakan sukses karena disampaikan tepat waktu, sesuai budget dan memiliki kualitas standar.


2016 ◽  
Vol 36 (1) ◽  
pp. 19-29 ◽  
Author(s):  
Jörg Vianden

To affect college retention, academic advisors should act as agents of student relationship management by strengthening the connection between students and their institutions. Satisfaction and dissatisfaction with academic advising as perceived by 29 college students at 3 midwestern comprehensive institutions are described. Discussion is framed in the context of student relationship management theory and the critical incident technique. Recommendations for academic advising practice are offered.


Author(s):  
Janhvi A. Sahare

Abstract: Smart-Sheet is a project management software product, developed and sold by Smart consultancies. It is designed to assist a project manager in developing a plan, assigning resources to tasks, tracking progress, managing the budget, and analysing workloads. Smart sheet can be used as a standalone tool for tracking project progress or it can be used for tracking complex project distributed in many geographical areas and managed by a number of project managers. Smart Sheet is designed to assist a project manager in: 1) Developing a plan, 2) Assigning resources to tasks, 3) Tracking progress, 4) Managing budget and 5) Analysing workloads. In this study an effort is made to estimate the changes in overall cost and time required to execute the phase 1 work of Nagpur metro rail project when done by conventional execution approach and when done by project management software tool of smart sheet Keywords: Project management, Smart sheet, Conventional construction execution, Cost optimization, Time optimization, Resource optimization.