The Research and Actualize of the Quality Management System’s Effectiveness Evaluation

2010 ◽  
Vol 26-28 ◽  
pp. 547-552
Author(s):  
Shi Lin Feng

To guarantee the run effectiveness of the quality management system(QMS), a comprehensive evaluation system of the QMS’s effectiveness is brought forward. In the evaluation system, first the evaluation flow chart is set up; Second the evaluation index is given out; Third the evaluation result is given out by the calculate of the grey integration evaluation arithmetic. The organization can find out why the effectiveness of the QMS is weak and establish improvement measure from the comprehensive evaluation result.

2011 ◽  
Vol 243-249 ◽  
pp. 3007-3011 ◽  
Author(s):  
Jun Lan Zhao

Application and research of GIS in the slope engineering is one of the hot topics in this field. In this paper, the fuzzy comprehensive evaluation method of slope stability based on GIS was researched. It developed and set up a multi factor slope fuzzy comprehensive evaluation system by using slope database and can quantitatively classify and evaluate the slope stability in a quick and efficient way. This system can be at work on slope data management, inquiry, statistics and spatial analysis. It evaluated the fatality and vulnerability to the slope of a large scale coal mine as an example.


2015 ◽  
Vol 731 ◽  
pp. 401-406
Author(s):  
Rui Ting Pei ◽  
Hong Chen

<p>With the increasingly serious environmental problems, how to achieve the sustainable development of environment and economic has become a widespread concern at home and abroad. Through the research and analysis of clean production and clean production evaluation index system of domestic and foreign, and according to statistical theory, the reasonable and effective sampling method was determined. By researching the printing equipment manufacture and equipment applied enterprise of domestic, the data contained printing equipment energy use, emissions and product characteristic was obtained. By using the method of expert advice and factor analysis, clean production evaluation indicators and index system was determined.</p>


1993 ◽  
Vol 1 ◽  
pp. 121-134
Author(s):  
Masahiko KUNISHIMA ◽  
Tsunemi WATANABE ◽  
Hyun Yang SHIN ◽  
Masahide HORITA

2010 ◽  
Vol 168-170 ◽  
pp. 2376-2381
Author(s):  
Xi Jing Qi ◽  
Xiao Hu Zhou ◽  
Ming Liang Song ◽  
Feng Ming Li

High-rise buildings in China has developed rapidly in recent years and problems such as construction and vertical transportation have been paid close attention more and more by society. The safety project management objective system mentioned in this article has comprehensively considered the characteristics of high-rise construction and vertical transportation and provided a comprehensive evaluation system for vertical transportation equipment for high-rise construction, which may be used for guiding equipment selection and optimization of equipment use. Meanwhile, the study results are applied in practical project to verify its effectiveness and practicability, so as to guide the enterprises to reasonably select and use vertical transportation equipment for high-rise construction and to realize the integration benefits of the project.


2011 ◽  
Vol 94-96 ◽  
pp. 210-213
Author(s):  
Qiu Ping Wang ◽  
Yan Hua Yu

Based on the design of general layout and transportation optimization of a variety of factors, established a program evaluation system, the theory of fuzzy mathematics general layout and transportation design a comprehensive evaluation. For the fuzzy weight of each factor to determine the application of an objective method of empowerment from the perspective of information entropy to determine the factors enabling the weight of each evaluation index, fuzzy comprehensive evaluation of the results obtained. To detail with an example.


2021 ◽  
Vol 27 (spe) ◽  
pp. 56-58
Author(s):  
Pei Jiang

ABSTRACT The comprehensive performance evaluation system of public sports service is an important part of public sports service system in China. How to objectively and comprehensively evaluate the present situation of public sports service performance in our country has always been a difficult problem in the development of public sports service. Based on the five principles of constructing the recipient satisfaction index, the PCSSI model of the comprehensive evaluation system of public sports service supply was constructed using scale design. Large-scale stadiums in seven districts of Shenyang were selected for investigation. The recipient satisfaction index model was established to compare the satisfaction index of the 7 regions, and analyze the influencing factors of the satisfaction index of public sports service supply, and put forward some suggestions for improving the service level of large stadiums and gymnasiums in Shenyang. Practice has proved that the application of the PCSSI model has a positive effect on improving the performance level of public sports service supply in China.


Sign in / Sign up

Export Citation Format

Share Document