Temperature Control Technique and Analysis of Mass Concrete in the Pile Cap of Main Pier in Yangtze River Bridge
2014 ◽
Vol 587-589
◽
pp. 1407-1411
◽
Keyword(s):
Pile Cap
◽
The paper analyzed the temperature control technique measures of mass concrete in the pile cap of main pier in Yangtze River Bridge. Consider the effect of the cooling pipe, ANSYS finite element analytical software was used to calculate the temperature field of the pile cap in the construction, the distribution rules of the temperature field was simulated by finite element analysis. It is shown that the cooling effect of the mass concrete is obvious by using cooling water pipe, the finite element calculation results can be used to lead to the design and construction. It also provides the reference to develop a reasonable temperature control solutions during the construction of the similar mass concrete.
2015 ◽
Vol 1094
◽
pp. 331-334
2011 ◽
Vol 243-249
◽
pp. 1589-1596
Keyword(s):
2013 ◽
Vol 712-715
◽
pp. 1209-1212
◽
Thermal Deformation Analysis for the Guideway of Large-Type CNC Lathe Based on Finite Element Method
2011 ◽
Vol 58-60
◽
pp. 198-204
2001 ◽
Keyword(s):
Keyword(s):