Research on Performance of CRTS I Cement-Emulsified Asphalt Mortar on Site

2017 ◽  
Vol 1142 ◽  
pp. 334-339
Author(s):  
Heng Qiong Jia ◽  
Tao Wang ◽  
Zhao Wei

For construction method of infusion bag, expansion of CRTSⅠCA mortar on site by core drilling, water absorption, chloride ion permeability and frost resistance and other properties were studied in comparison with performance of mortar in laboratory under standard curing. The results showed that expansion of the mortar on site was 2%, water absorption was 0.5%, charge amount was 210C, quality loss after 300 freeze-thaw cycles was -1.1%, the performance was much better than molded mortar in laboratory. Pore structure analysis showed that the internal pore diameter of the mortar on site was about 150μm, pore content was 9% to 12%; the internal pore diameter of the mortar in laboratory was also about 150μm, pore content was 10% to 15%. China railway track system(CRTSⅠ)slab ballastless track is one of the main structure forms of the modern high-speed railway and mainly composed of concrete basement, the Cement-emulsified Asphalt Mortar layer and concrete slab, featured by its rapid construction, convenient maintenance, and so on, has been widely applied in high-speed railway construction in our country. The cement-emulsified asphalt(CA) Mortar is one of the key materials and structures in slab ballastless track, providing the appropriate stiffness and elasticity which is usually composed of cement, emulsified asphalt, grit, water and many types of additives, containing a variety of inorganic/organic compositions and many types of surfactants, through the special bag, filling inside the flat cavity by its own weight between track slab and concrete basement with a thickness of 50mm (length×width 4962 mm×2400 mm). The construction method of CA mortar is grouting the non-woven fabrics bag after setting the bag under the track slab fixed by fine adjustment claw, which is convenient and has no requirement of mould removal. The bag is fixed before the perfusion process and does not produce wrinkles. The method greatly enhances the construction efficiency and has been widely utilized in high-speed railway. To full perfusion and tightness with track board, CA mortar contains gas former and expands after the end of infusion in a restricted state. Non-woven fabrics bag itself with breathable permeable, a small amount of water seeps around infusion bags in a period of time after the end of the infusion. Theoretically free water seepage of mortar on the one hand increases the compactness and durability of the mortar, but on the other hand will reduce the mortar expansion; the quality of filling layer mortar can meet the acceptance requirements in the engineering practice. In the same raw materials and mortar mixing, the performance of fresh mortar can require CRTSⅠ type of slab track emulsified asphalt cement mortar in high-speed railway Q / CR 469-2015. After water seepage performance of hardening mortar on site is different from laboratory mortar, because the surface of laboratory mortar is without compression and free deformation. In this paper, contrast mortar on site and molded mortar in laboratory, the performance of hardened mortar on site were studied.

Materials ◽  
2021 ◽  
Vol 14 (11) ◽  
pp. 2876
Author(s):  
Yingying Zhang ◽  
Lingyu Zhou ◽  
Akim D. Mahunon ◽  
Guangchao Zhang ◽  
Xiusheng Peng ◽  
...  

The mechanical performance of China Railway Track System type II (CRTS II) ballastless track suitable for High-Speed Railway (HSR) bridges is investigated in this project by testing a one-quarter-scaled three-span specimen under thermal loading. Stress analysis was performed both experimentally and numerically, via finite-element modeling in the latter case. The results showed that strains in the track slab, in the cement-emulsified asphalt (CA) mortar and in the track bed, increased nonlinearly with the temperature increase. In the longitudinal direction, the zero-displacement section between the track slab and the track bed was close to the 1/8L section of the beam, while the zero-displacement section between the track slab and the box girder bridge was close to the 3/8L section. The maximum values of the relative vertical displacement between the track bed and the bridge structure occurred in the section at three-quarters of the span. Numerical analysis showed that the lower the temperature, the larger the tensile stresses occurring in the different layers of the track structure, whereas the higher the temperature, the higher the relative displacement between the track system and the box girder bridge. Consequently, quantifying the stresses in the various components of the track structure resulting from sudden temperature drops and evaluating the relative displacements between the rails and the track bed resulting from high-temperature are helpful in the design of ballastless track structures for high-speed railway lines.


2016 ◽  
Vol 2016 ◽  
pp. 1-12 ◽  
Author(s):  
Dan Liu ◽  
Yu-feng Liu ◽  
Juan-juan Ren ◽  
Rong-shan Yang ◽  
Xue-yi Liu

The contact loss beneath track slab caused by deteriorated cement emulsified asphalt mortar (CA mortar) has been one of the main diseases occurring in the CRTS- (China Railway Track System-) I Slab Track of high-speed railway in China. Based on the slab track design theory and the vehicle-track coupling vibration theory, a vehicle-track vertical coupling dynamic FEM model was established to analyze the influence of the contact loss length on the dynamic characteristics of vehicle and track subsystems at different train speeds. A prototype dynamic characteristic experimental test of CRTS-I Slab Track with CA mortar contact loss was conducted to verify the FEM model results. The train load was generated by the customized ZSS50 excitation car. The results showed that when the operation speed is less than 300 km/h, the contact loss with length smaller than 2.0 m barely affects the running smoothness ride safety of vehicle. The contact loss length effect on the dynamic characteristics of track subsystem is pronounced, especially on the track slab. Once the contact loss beneath the track slab occurs, the vibration displacement and the acceleration of the track slab increase rapidly, while it has little influence on the displacement and acceleration of the concrete roadbed.


2013 ◽  
Vol 443 ◽  
pp. 69-73
Author(s):  
Xiang Min Li ◽  
Suo Yan Zhang ◽  
Jun Liu

At present ballastless track has been widely applied to railway line for passenger in our country, therefore it has broad prospect. Cracks in ballastless track slabs are inevitable in the construction and operation of high-speed railway. Based on comprehensive investigation of documents, and taking cracks in ballastless track slabs as the main object, systematic and deep research has been done within this paper. The main research contents are as follows: First of all, the structure characteristics of CRTSIII ballastless track in high-speed railway are briefly introduced; Secondly, the paper mostly introduces the impacts what cracks make, the characteristics of cracks and how they form. Subsequently the paper introduces what are made to prevent cracks.


2012 ◽  
Vol 531-532 ◽  
pp. 163-167
Author(s):  
Jun Fu ◽  
Yu Qin ◽  
You Yun Yu ◽  
Meng Jun Ye ◽  
Lian Xin Li

As an important cushion layer, CA mortar ballastless track is crucial to the durability, safety of high-speed railway and the high-speed railway is influenced by the external environment. The regulation of temperature field evolvement of ballastless track is analyzed in this paper through a two-dimensional, transient finite element model built by ANSYS. The results show that the temperature of structure section caused by solar radiation and circumstances temperature is decreasing along depth in sunlight, and the internal temperature of structure is higher than the surface temperature at night. The integral temperature field of structure reaches the maximum at 1:00 p.m. and the vertical difference of the temperature inside the structure is also the largest, causing the most obvious temperature stress, which provides theoretical data for systematic research on ballastless track of high-speed railway.


2019 ◽  
Vol 9 (21) ◽  
pp. 4496 ◽  
Author(s):  
Hongyuan Fang ◽  
Yingjie Su ◽  
Xueming Du ◽  
Fuming Wang ◽  
Bin Li

Uneven settlement of high-speed railway subgrade leads to the irregularity of high-speed railway line, which seriously affects high-speed train operation. The skylight point of high-speed railway operation is short and the maintenance time is limited. Therefore, how to quickly lift and repair the ballastless track slab in the subsidence section is an urgent problem to be solved in the maintenance of high-speed railways. The two-component non-aqueous reactive polymer material has the advantages of strong expansive force, fast reaction speed, and wide application range, which is extremely suitable for the repair of high-speed railway track slab subsidence and lifting. In this study, the expansion force characteristics of different density polymer materials and the stress-deformation curves at corresponding density are tested in laboratory to propose the mechanical parameters of polymer. Then, a three-dimensional finite element (FE) model of high-speed railway train ballastless-track subgrade is established based on ABAQUS. The mechanical characteristics of CRTS III ballastless track under different repair materials, different elevation, and different density of polymer grouting materials are analyzed. The results show that, under the dynamic load of the train, the stress value of polymer repairing material is less than that of cement slurry, presenting a compressive stress state, which is similar to that of the complete subgrade surface. In addition, within a certain thickness range, increasing the thickness of polymer is beneficial to reducing the difference of stress variation between polymer filling layer and complete pavement. Once beyond this range, the thickness of polymer has little effect on the force variation.


Author(s):  
Bai Jing-Yuan ◽  
Bin Yan

<p>The technology of high-speed railway is one of the central driving forces in national economic growth. To increase the speed of high-speed trains and ensure their safety, the research and development of brand-new ballastless track techniques are of vital significance. This article simply talked about China's domestically designed CRTS III ballastless track. This technique is famous for some technical characteristics: it replaced CA mortar with self-compacting concrete as adjustment layer, which not only simplified the structure but also reduced the cost; 2-D scalable steel mould was adopted to materialize the track slab with high precision shoulder post-tensioned prestressed spatial curved space, which simplified the construction craft a lot; it adopted flexible longitudinal coupled structure of the subgrade as bridge-tunnel unit structure, which weakened the influence of temperature stress; unit-separated structure and flexible-separated structure were widely used, which made the maintainability of all unit structure. This article was based on the analysis of these technical characteristics and discussed the application status and developing foreground of this technique in some way.</p>


2014 ◽  
Vol 584-586 ◽  
pp. 1646-1651
Author(s):  
Hua Yang Zhang ◽  
Long Hua Yuan ◽  
De Wei Ren

Cement asphalt mortar (CA mortar) is one of key structures of slab ballastless high-speed railway. Cement and asphalt emulsion are the main two components of CA mortar, making it possess the viscoelastic properties of viscoelastic materials, which is one of the infancy of the current study. In this paper, DMA method was adopted to investigate the viscoelastic properties of CRTS II CA mortar. Viscoelastic properties of CA mortar at different temperatures were investigated and were compared with the numerical simulation results of Burgers model. The results of the simulation fit in well with the data from the experimental-scale column, so we can study the dynamic modulus of CA mortar using the Burgers model in the temperature range of CA mortar.


Sign in / Sign up

Export Citation Format

Share Document