scholarly journals Between a rock and a hard place: Management and implementation teams’ expectations of project managers in an agile information systems delivery environment

2017 ◽  
Vol 19 (1) ◽  
Author(s):  
Songezo Nkukwana ◽  
Nicky H.D. Terblanche

Background: To address the low success rate in information system (IS) projects, organisations in South Africa are adopting agile implementation methodologies. Agile delivery environments advocate an iterative approach where autonomous, self-organising teams share project management (PM) activities. This encroaches on the traditional project manager role. Are project managers still relevant in agile delivery environments and how should they adapt?Objectives: This case study investigated how project managers could adapt to agile IS implementation environments to remain relevant. Specifically, the views of their key stakeholders (the management and implementation teams) were elicited to provide insights into what is expected from agile project managers.Method: A qualitative, inductive content analysis approach using purposive sampling was used to identify 13 participants (comprising management and implementation team members) within a large South African insurance company. Semi-structured interviews were conducted with all participants.Results: The management and implementation teams agreed that PM remains highly relevant in an agile environment for ensuring project governance including delivery, risk management, reporting and budgeting. There was, however, disagreement between the management and implementation teams on project management interaction with the implementation team. Management preferred a command and control type project manager, while the implementation team favoured a more inclusive, facilitative PM style.Conclusion: To remain viable in an agile IS project implementation environment within large corporates, project managers need to be aware of what various stakeholders expect of them. They need to retain some of the classic PM functions while adapting to the interpersonal and collaborative requirements of the agile way.

Author(s):  
Céline M. Silvius ◽  
Gilbert Silvius

Mobile devices and applications are changing the way individuals gather, process and share information. A development which also applies to project management. This chapter reports an explorative study on the functionality of 50 project management apps. The apps were analyzed on the variables: type of functionality, project management processes supported, methodology/standard supported, topics covered, website support, languages supported, project roles supported, number of team members supported and number of projects supported. Our analysis showed that the functionality of project management apps today is mainly focused on two application areas: (A) Supporting the role of the project manager individually in the planning/organizing processes of the project and (B) Supporting team communication and team collaboration. Lacking in functionality seems to be the communication/collaboration with project sponsor and other stakeholders. Based on our study we recommend project managers to be selective when starting to use project management apps.


2016 ◽  
pp. 579-593
Author(s):  
Céline M. Silvius ◽  
Gilbert Silvius

Mobile devices and applications are changing the way individuals gather, process and share information. A development which also applies to project management. This chapter reports an explorative study on the functionality of 50 project management apps. The apps were analyzed on the variables: type of functionality, project management processes supported, methodology/standard supported, topics covered, website support, languages supported, project roles supported, number of team members supported and number of projects supported. Our analysis showed that the functionality of project management apps today is mainly focused on two application areas: (A) Supporting the role of the project manager individually in the planning/organizing processes of the project and (B) Supporting team communication and team collaboration. Lacking in functionality seems to be the communication/collaboration with project sponsor and other stakeholders. Based on our study we recommend project managers to be selective when starting to use project management apps.


2021 ◽  
Vol 15 (1(15)/2020) ◽  
pp. 73-77
Author(s):  
Juliusz Pietrzak

The article deals with the problem of the relationship between an employee and a project manager. The research aims to examine the employee - project manager relationship in the projects of European companies. The article consists of two main parts. The first is theoretical, the second empirical. The empirical data was collected by conducting semi-structured interviews with five project managers and five team employees. Keywords: project management, relationship, manager, employee


2013 ◽  
Vol 17 (1) ◽  
pp. 21-31 ◽  
Author(s):  
Neringa Gudienė ◽  
Audrius Banaitis ◽  
Nerija Banaitienė

This paper aims to identify a comprehensive list of critical success factors for construction projects in Lithuania. Based on the available literature review, this paper identified 71 success factors under 7 broad groups. Based on the survey results, ten factors including project manager competence, project management team members' competence, project manager coordinating skills, client clear and precise goals/objectives, project value, project management team members' relevant past experience, project manager organising skills, project manager effective and timely conflict resolution, client ability to make timely decision, and project manager experience were determined as the most important success factors for construction projects. These critical success factors are of great significance both to researchers and industry practitioners.


2019 ◽  
Vol 9 (2) ◽  
pp. 56-65
Author(s):  
Michael Pace

Abstract This non-experimental correlational study extends previous research investigating the relationship between project management methodology and reported project success, as well as the moderating variables of industry and project manager experience. The sample included North American project managers with five years’ experience, 25 years of age or older, and experience with multiple project management methodologies. The survey instrument consisted of 58 questions, utilizing a 5-point Likert scale to record responses. The survey contained three sections, including demographic information, questions related to a successful project, and questions related to a less-than successful (failed / challenged) project. 367 usable responses were received. The examination of the constructs included Pearson’s correlation coefficient as well as linear regression to determine the impact of moderating variables. Results indicated that project management methodology has a weak correlation with reported project success, and this correlation is not moderated by industry nor project manager experience. The results did not align with previously conducted studies, illustrating a need to continue the study of methods impacting success including investigating additional moderating variables.


2021 ◽  
Vol 6 (521) ◽  
pp. 240-245
Author(s):  
H. Y. Luchko ◽  
◽  
I. V. Kohut ◽  

This article is aimed at researching the phenomenon of leadership, analyzing the qualities of project leaders and defining the key qualities that project managers should have to effectively manage teams and achieve maximum results. The article defines that in order to ensure effective management of the project team with dynamic changes in the external environment, the project manager must be not only a director, but also a leader at the same time. It is precisely the leadership qualities of the project manager, which provide the ability to coordinate the team’s work in such a manner that certain results be achieved, i.e., the expectations of the main stakeholders be fulfilled or exceeded. The article examines the most characteristic traits inherent in leaders, which are highlighted by various researchers of the «traits theory». It is determined that of importance for a project manager is not only certain traits of the leader, but also professional competence. The criteria for assessing the level of competence of project managers in accordance with the ICB4 standard, as well as the necessary skills in relation to the individual competence of «Leadership», are specified. The main qualities and skills of the leader-manager according to the latest version of the PMBOOK project management standard are also considered. The research carried out by the authors resulted in distinguishing the most important qualities of the leader, which, combined with the necessary professional knowledge and skills, will allow project managers to become successful and effective in team cohesion to achieve the best results in project activities. The traits allocated as result of the research, such as responsibility, perseverance, ability to cooperate, kindness and others, will allow project managers to be successful leaders of their teams and to effectively manage projects and programs.


2019 ◽  
Vol 5 (2) ◽  
pp. 76-82
Author(s):  
Cornelius Mellino Sarungu ◽  
Liliana Liliana

Project management practice used many tools to support the process of recording and tracking data generated along the whole project. Project analytics provide deeper insights to be used on decision making. To conduct project analytics, one should explore the tools and techniques required. The mostcommon tool is Microsoft Excel. Its simplicity and flexibility make project manager or project team members can utilize it to do almost any kind of activities. We combine MS Excel with R Studio to brought data analytics into the project management process. While the data input process still using the old way that the project manager already familiar, the analytic engine could extract data from it and create visualization of needed parameters in a single output report file. This kind of approach deliver a low cost solution of project analytics for the organization. We can implement it with relatively low cost technology onone side, some of them are free, while maintaining the simple way of data generation process. This solution can also be proposed to improve project management process maturity level to the next stage, like CMMI level 4 that promote project analytics. Index Terms—project management, project analytics, data analytics.


2021 ◽  
Vol 12 (1) ◽  
pp. 1-17
Author(s):  
Zinga Novais ◽  
Jorge Vareda Gomes ◽  
Mário José Batista Romão

Projects have been increasingly used in the implementation of organizations' business operations. Knowledge sharing has been considered essential in project environment; therefore, the integration of knowledge management within project management becomes crucial for project success. The objective of this research is to study how knowledge sharing is integrated within the context of a project, and what is the perception of project team members about it. A case study was carried out in a company within the financial sector, focused on a project team of the entity. The results revealed that project managers, other professionals in project management, and the organization itself are very much aware of the importance of knowledge sharing. The results also emphasized that, regardless of the lack of incentives by top management, project team members consider that knowledge sharing highly contributes for a successful execution of projects.


2016 ◽  
Vol 05 (07) ◽  
pp. 01-07
Author(s):  
Akram Subhe Suleiman ◽  
Jafar Subhi Hardan Abahre

An exhaustive literature search revealed that not much research has been done on factors causing problems in managing a construction project in a country under military occupation like Palestine. So, it is the main goal of this research is to identify these factors which could be used by the decision makers to select the appropriate project manager who bosses the suitable skills and competencies to deal with these problems. The study is a step toward determining means to improve the effectiveness of projects through identifying project manager competencies. It is important for Palestinian construction industry to progress in terms of project success; the problems that face the project managers must be determined and identified, in order to achieve the best results with less risk. A clear understanding of such problems helps the Palestinian construction industry of finding the suitable solutions to overcome these problems. A questionnaire survey was carried out to achieve the main aim of this research. The respondents were engineers have more than 3 years in the position of project manager in the Palestinian construction industry. The survey was based on factors drawn from findings of another researches in different countries, together with special factors identified as potentially affecting Palestine. The results identified many factors created problems; they were clustered in eight groups. These groups were arranged according to respondents in descending order as follows: the political situation of Palestine, lack of consultants` technical competencies, lack of resources, insufficient planning, team members uncommitted, conflicts between departments, breakdowns in communications, and changes in goals. As a result of this study one could conclude that managing a project in Palestine is as difficult as the complication of the political situation of the country. The project manager should have a complicated mixture of skills and competencies from dealing with Israeli occupation to dealing with stakeholders to lack of resources and unclear goals. The study has recommended to the Palestinian government to improve the regulations and laws to meet the impact of closure and segmentation of the Palestine.


2022 ◽  
pp. 1612-1634
Author(s):  
Franciane Freitas Silveira ◽  
Rosária de F. S. Macri Russo ◽  
Irapuan Glória Júnior ◽  
Roberto Sbragia

The development of information technology projects is no longer limited to the domestic sphere. This study identifies the differentiation of risk categories between global and domestic projects through an exploratory research carried out by means of a systematic literature review. 1367 risks were identified in 37 articles and classified within 22 categories. The major concern regarded in domestic project management was the client (external risk) and scope (internal risk) and, in global project management, the psychic distance (external) and coordination and control (internal). The main difference between the risk categories for each project type refers to the psychic distance category, which was identified almost exclusively in global projects, thus making the external risks more relevant than those in domestic projects. On the other hand, it makes risks such as client, supplier and stakeholders be underestimated. The results indicate that project managers should focus on different risks depending on the type of IT project: global or domestic.


Sign in / Sign up

Export Citation Format

Share Document