FACTORS CAUSING PROBLEMS IN MANAGING CONSTRUCTION PROJECTS IN A COUNTRY UNDER MILITARY OCCUPATION: Contractors’ Perspective

2016 ◽  
Vol 05 (07) ◽  
pp. 01-07
Author(s):  
Akram Subhe Suleiman ◽  
Jafar Subhi Hardan Abahre

An exhaustive literature search revealed that not much research has been done on factors causing problems in managing a construction project in a country under military occupation like Palestine. So, it is the main goal of this research is to identify these factors which could be used by the decision makers to select the appropriate project manager who bosses the suitable skills and competencies to deal with these problems. The study is a step toward determining means to improve the effectiveness of projects through identifying project manager competencies. It is important for Palestinian construction industry to progress in terms of project success; the problems that face the project managers must be determined and identified, in order to achieve the best results with less risk. A clear understanding of such problems helps the Palestinian construction industry of finding the suitable solutions to overcome these problems. A questionnaire survey was carried out to achieve the main aim of this research. The respondents were engineers have more than 3 years in the position of project manager in the Palestinian construction industry. The survey was based on factors drawn from findings of another researches in different countries, together with special factors identified as potentially affecting Palestine. The results identified many factors created problems; they were clustered in eight groups. These groups were arranged according to respondents in descending order as follows: the political situation of Palestine, lack of consultants` technical competencies, lack of resources, insufficient planning, team members uncommitted, conflicts between departments, breakdowns in communications, and changes in goals. As a result of this study one could conclude that managing a project in Palestine is as difficult as the complication of the political situation of the country. The project manager should have a complicated mixture of skills and competencies from dealing with Israeli occupation to dealing with stakeholders to lack of resources and unclear goals. The study has recommended to the Palestinian government to improve the regulations and laws to meet the impact of closure and segmentation of the Palestine.

2021 ◽  
Vol 15 (S1) ◽  
pp. 27-38
Author(s):  
Aryani Ahmad Latiffi ◽  
Noorul Adharina Zulkiffli

Leadership skills are required in any area, including the construction industry. Compared to conventional construction projects, the obstacles of practising leadership skills are more significant in sustainable construction projects. In the context of managing a project, a project manager is accountable for overseeing the project from the pre-construction phase to the post-construction phase. Nevertheless, project managers often encountered utmost difficulties in sustainable construction projects during the pre-construction phase. Despite that, improving leadership skills would emerge to boost project manager performance in managing sustainable construction projects. Thus, this paper aims to determine the improvement factors of leadership skills among project managers in the pre-construction phase of sustainable construction projects. A questionnaire survey was developed with 44 improvement factors of leadership skills among project managers in the pre-construction phase of sustainable construction projects, in which 153 experienced project managers in sustainable construction projects in Malaysia responded. Data were analysed using normality test, exploratory factor analysis (EFA) and reliability analysis via IBM SPSS version 24 software. The finding reveals that all improvement factors were significant to improve leadership skills among project managers in the pre-construction phase of sustainable construction projects. Hence, this paper's findings would assist project managers in grasping the improvement factors that can improve their leadership skills, particularly in sustainable construction projects.


2018 ◽  
Vol 4 ◽  
pp. 105-109
Author(s):  
Raju Thapa ◽  
Santosh Kumar Shrestha

The delay in the construction industry is a global phenomenon and the construction industry in Nepal can!t be the exception. To deliver the project product on time, within the budget, of quality in the safest manner is the goal of project management. Even potentially good projects are failing because of the weak project management performance in Nepalese construction projects. Due to the lack of research based findings in these areas, the new project managers are facing problems about in which areas they need to focus for successful delivery of the project. The purpose of this research is to find out the critical success  factors  of  project management  that  help  the  project  parties  reach  their  goal  as  planned  in Nepalese  hydropower projects. In this study, general success factors of project management were collected from various literatures and the pilot survey, rank them based on relative importance index (RII), and found top seven success factors as critical success factor. Based on the 85 responses from project managers and experts working in hydropower projects in the first stage study, top seven  success  factors  of  project  management  were  Effective  communication  between  project  team  members  (S1),  Job satisfaction  of  project  team  members  (S2),  Timely  decision  by  client  (S3),  Competence  of  the  project  manager  (S4), Effective coordination between stakeholders, public institutions (S5), Competence of the project team members (S6), Proper and timely supervision (S7).  


2020 ◽  
Vol 38 (7A) ◽  
pp. 1069-1076
Author(s):  
Layth T. Ali ◽  
Raid S. Abid Ali ◽  
Zeyad S. M. Khaled

Cost overrun in construction projects is a common phenomenon in Iraq. This might occur due to diversity of factors. This study aims to identify the factors influencing construction projects cost that are potentially controllable by main contractors. A field study through a questionnaire survey was directed to a sample of related Iraqi professional engineers from general contracting companies at both public and private sectors. Their opinions on the impact and frequency of each factor were investigated. The questionnaire offered (59) factors classified in (8) categories namely; legislations, financial and economic, design, contractual, site management, material, labor and equipment. The factors were ranked according to the highest Relative Importance Index (RII). The study revealed (10) major factors that are potentially controllable by main contractors namely; labor productivity, sub-contractors and suppliers performance, equipment productivity, site organization and distribution of equipment, experience and training of project managers, scheduling and control techniques, planning for materials supply, planning for equipment supply, materials delivery and planning for skilled labor recruitment. Recommendations to aid contractors and owners in early identification of these factors are also included in this study.


2015 ◽  
Vol 3 (2) ◽  
pp. 69-84
Author(s):  
Wadhah Amer Hatem ◽  
Samiaah M. Hassen Al-Tmeemy

     Suicide attacks, bombings, explosions became the part of daily life in Iraq. Consequently, the threat of terrorism put the Iraqi construction sector in the face of unique and unusual challenges that not seen on other countries. These challenges can have extensive impact on construction projects. This paper seeks to examine the impact of the terrorist attacks on construction industry and determine the extent to which the impact of terrorism on construction projects in terms of cost, schedule, and quality. This study adapted quantitative and qualitative approaches to collect data using questionnaire survey and interviews, as well as historical data. The study focused on projects that have been the target of terrorist strikes in Diyala governorate. A variety of statistical procedures were employed in data analysis. The results revealed the extent to which terrorist attacks impact construction projects in terms of cost, time, and quality. The results of this study will enhance the awareness of all construction parties to the impact of the terrorist attacks against construction projects. Eventually, this can develop a risk management assessment and assist contractors to properly protect projects and buildings to minimize injuries and fatalities in the event of terrorism.


2013 ◽  
Vol 17 (1) ◽  
pp. 21-31 ◽  
Author(s):  
Neringa Gudienė ◽  
Audrius Banaitis ◽  
Nerija Banaitienė

This paper aims to identify a comprehensive list of critical success factors for construction projects in Lithuania. Based on the available literature review, this paper identified 71 success factors under 7 broad groups. Based on the survey results, ten factors including project manager competence, project management team members' competence, project manager coordinating skills, client clear and precise goals/objectives, project value, project management team members' relevant past experience, project manager organising skills, project manager effective and timely conflict resolution, client ability to make timely decision, and project manager experience were determined as the most important success factors for construction projects. These critical success factors are of great significance both to researchers and industry practitioners.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  

Purpose This paper aims to review the latest management developments across the globe and pinpoint practical implications from cutting-edge research and case studies. Design This briefing is prepared by an independent writer who adds their own impartial comments and places the articles in context. Findings The study takes empirical data from three case studies of projects that have faced setbacks to explore the impact of project manager signature strengths on team resilience and finds that four signature strengths, leadership, open-mindedness, persistence and hope, were present in project managers across all three case studies. Originality The briefing saves busy executives and researchers hours of reading time by selecting only the very best, most pertinent information and presenting it in a condensed and easy-to-digest format.


2019 ◽  
Vol 9 (2) ◽  
pp. 56-65
Author(s):  
Michael Pace

Abstract This non-experimental correlational study extends previous research investigating the relationship between project management methodology and reported project success, as well as the moderating variables of industry and project manager experience. The sample included North American project managers with five years’ experience, 25 years of age or older, and experience with multiple project management methodologies. The survey instrument consisted of 58 questions, utilizing a 5-point Likert scale to record responses. The survey contained three sections, including demographic information, questions related to a successful project, and questions related to a less-than successful (failed / challenged) project. 367 usable responses were received. The examination of the constructs included Pearson’s correlation coefficient as well as linear regression to determine the impact of moderating variables. Results indicated that project management methodology has a weak correlation with reported project success, and this correlation is not moderated by industry nor project manager experience. The results did not align with previously conducted studies, illustrating a need to continue the study of methods impacting success including investigating additional moderating variables.


Author(s):  
I. Bredikhina

The article states that in order to create a competitive educational institution, management needs to use team management technologies. The research considers the issue of creating systematic support for pedagogical teams, namely assessment and analysis of a number of factors influencing the successful work of the pedagogical team and the formation of systematic support for team development using retrospective techniques and team adjustments. According to the results of the research, which is based on the Michigan model of leadership, the existing difficulties in the functioning of college teams were analyzed. The survey identified that at this stage of development, not all members of the college staff teams have a clear understanding of the overall goal (86.9 %) and the impact of teamwork on the overall result (78.2 %). Their unequal contribution to achieving the goal was also noted (73.9 %). The survey indicates that not all teams have a combination of skills at the highest level, and team members who have certain skills are not always interested in helping colleagues (82.6 %). Teams are quite high spirited and motivated even in difficult periods (82.6 %), the teams hold constructive discussions about misunderstandings and problems, regularly find new opportunities to find information and solve complex problems, appreciate the achievements of colleagues (86.9 %). Thus, it turned out that team leaders motivate not all team members to successfully implement projects (78.2 %), but provide management and prompt feedback, consult with team members to remove obstacles and difficulties in the work and ensure team progress (86.9 %). Given the identified weak spots of the pedagogical teams of the college and the factors influencing their work, systematic support, which consists in the formation of psychological security, constant analysis of team development and retrospectives, swell as models of adjustment for team development to improve their efficiency were created.


2018 ◽  
Author(s):  
◽  
Thobeka Kahlela

Business ethics and corporate governance have taken centre stage globally in the last decade due to the increasing unethical practices by private and public institutions. These unethical practices adversely affect the image of professionals and organisations with a resultant negative impact on the competitive advantage of the organisation. This study aims to assess factors contributing to unethical behaviours of project managers. The study was conducted in five provinces of South Africa including KwaZulu-Natal, Eastern Cape, Cape Town, Limpopo and Gauteng. The sample frame consists of construction project managers registered with South African Council for the Project and Construction Management Professions (SACPCMP) and Construction Industry Development Board (CIDB) Random sampling technique was employed in the selection of samples. A total number of thirty six questionnaires were analysed for the study. Descriptive statistics were employed for the analysis of data. Findings include personal value, organisational culture and education are very influential factors on ethical decisions of a project manager. Furthermore, corporate value and individual values are the factors which most influence the ethical judgment of a project manager. Improving ethical practice for the professionals could improve ethical performance in construction projects and production efficiency in the construction industry in SA. Based on the findings of the study, ways to mitigate unethical conduct would be; practicing ethical conduct at all times will improve production, the levels of risk on projects will decrease and also an improvement in communication and transparency will minimize the levels of unethical conduct of the project managers in South Africa.


2021 ◽  
Vol 13 (23) ◽  
pp. 13085
Author(s):  
Jan Kowalski ◽  
Mieczysław Połoński ◽  
Marzena Lendo-Siwicka ◽  
Roman Trach ◽  
Grzegorz Wrzesiński

Exceeding the approved budget is often an integral part of the implementation of construction projects, especially those where unforeseen threats may occur. Therefore, each construction investment should contain elements of risk forecasting, mainly in terms of the cost of its implementation. Only a small number of institutions apply effective cost control methods, taking into account the specifics of a given industry. Especially small construction companies that participate in the structure of the implementation of large construction projects as subcontractors. The article presents a method by which it is possible to determine, with certain probability, the final cost of railway construction investments carried out in Poland. The method was based on a reliable database of risk factors published in sources. In this article, the main presumptions of the original method are presented, which take into account the impact of potential, previously recognized, risks specific to railway investments, and enable project managers to relate them to the conditions where the implementation of a specific object is planned. The authors assumed that such a relatively simple method, supported by a suitable computational program, would encourage teams that plan to implement railway projects to use it and increase the credibility of their schedules.