scholarly journals Productivity Management of Road Construction in Thailand by EZStrobe Simulation System Case Study: 0.15 m. Thick Subbase Course Construction

2016 ◽  
Vol 20 (3) ◽  
pp. 183-195
Author(s):  
Wisoot Jiradamkerng
2011 ◽  
Vol 421 ◽  
pp. 250-253
Author(s):  
Hu Zhu ◽  
Xiao Guang Yang

To lay the foundation of the automation for line heating forming, a method for heating path generation and simulation for ship plate steel base on STL mode was proposed in this paper. The line heating path was generated by slicing the STL model of the steel plate using a series of planes, and the models of the heating equipment of ship plate steel were build, and the heating process of ship plate steel can be simulated by inputting the models of the heating equipment into the simulation system that was built by using VC++ and OpenGL. The case study shows that the method can primely solve the inconvenient of manual heating and the whole heating process can be observed by the simulation so that the heating process can be made a reasonable monitoring, and the heating path generation and simulation software are runs stably and reliably.


2021 ◽  
Vol 6 (2) ◽  
pp. 70-77
Author(s):  
Ari Siswanto ◽  
◽  
Ira Kusumawaty ◽  

Water functions are very diverse for humans for daily needs such as drinking water, bathing, agriculture, development, aesthetics, and lower temperatures. Palembang is a lowland area dominated by wetlands, tidal swamps, and rivers. The types of houses on stilts on the banks of the Musi river are limas, Gudang, and Chinese stilt houses which are always associated with the water environment. The construction of roads replacing the role of rivers has realized people that the water environment has an important meaning for the house on stilts. The research objective was to explore the meaning of the water environment from various aspects for residents, stilt houses, and their environment. This research method is a case study with data collection through interviews, observation, measurements, and taking photos. Data and findings were analyzed and juxtaposed with images in the field. The road construction has eliminated part of the function of the river and influenced the change in orientation of the house on stilts. In conclusion, respect for the water environment including rivers has decreased, causing the quality of the river to decline, and the house on stilts cannot take advantage of the existence of the water environment optimally


2013 ◽  
Vol 74 ◽  
pp. 124-133 ◽  
Author(s):  
Adrien Capony ◽  
Bogdan Muresan ◽  
Michel Dauvergne ◽  
Jean-Claude Auriol ◽  
Valéry Ferber ◽  
...  

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Henry Duncan John Mwamvani ◽  
Christopher Amoah ◽  
Emma Ayesu-Koranteng

PurposeThe study aims to find the causes of road projects implementation delays in Blantyre, one of the four city councils (CCs) in Malawi.Design/methodology/approachThe study followed a qualitative research approach using a Blantyre City Council (BCC) as a case study. This study combined in-depth, face-to-face interviews with councillors, secretariat staff, consultants, and contractors who worked on the city's road projects. Data gathered were analysed using thematic content analysis. Also, some road project documents were examined.FindingsThe findings from the case study revealed the primary cause of road project construction delays as the shortage of engineers in conducting detailed proposed projects surveys resulting in incomplete project scope definition before contractor's procurement. Other identified factors were service providers delaying the removal of existing public utility infrastructure from project sites, client funding issues, scope changes, and client delays in issuing instructions to the contractors during project implementation. Another factor was the shortage of construction equipment and construction materials experienced by some appointed contractors.Research limitations/implicationsOnly road construction projects and stakeholders operating from Blantyre city, Malawi, were contacted for the study; thus, the findings may not be generalizable.Practical implicationsThere is an urgent need to increase technical employees, especially engineers and other critical technical staff such as quantity surveyors in Blantyre. Employees' conditions of service should be conducive to attract qualified people to undertake effective management and assessment of projects before commencement to identify the feasibility of proposed projects to decrease the rate of road construction project delays.Originality/valueThe study has established Blantyre city's core challenges in implementing its road projects seamlessly and has provided mitigation measures for dealing with the shortcomings.


Author(s):  
Monika Siejka ◽  
Monika Mika

The development of the communication systems determines the economic level of the country. In Poland, despite the successive investments in this area, it is still not enough beneficial solutions to the road network and international calls. The problem of the acquisition of property for public roads on both the valuation principles and the way of obtaining land for these purposes is constantly modified. These changes are intended to simplify the procedures, which have a significant impact on shortening of the investment process. The current provisions of law give the possibility of the start of road investment before a property owner receives compensation for land taken for this purpose. This situation requires an inventory of component parts of the property for the purposes of their valuation. The paper presents the methodology of inventory the real estate components for the needs of their valuation using modern measurement techniques GNSS and GIS.


Sign in / Sign up

Export Citation Format

Share Document