Purpose: The purpose of this study was to assess the utilization of building information modelling (BIM) software for project planning in construction industries in Ondo-State. Approach/Methodology/Design: Three research questions guided the study. A survey research design was adopted for the study. The population for the study comprised of 31 construction industries with 126 Contractors and Building consultants in construction industries in Ondo-State, Nigeria. A structured questionnaire consisting of 41 items developed by the ERASMUS + programme was used for data collection. Two experts from the Department of Industrial Technical Education (Building/Woodwork), University of Nigeria, Nsukka, and one expert from Bablor Construction Company, Akure South, Ondo-State validated the instrument. The reliability co-efficient of the instrument was 0.86. Data collected were analyzed using mean to answer the research questions, while t-test was used to answer the hypotheses. Findings: It was found that the extent to which building information modelling (BIM) software are utilized are still very low. The study therefore, recommend that education and training programmes on BIM software uses should be organized for construction industries, BIM should be made compulsory for all personnel involved in construction process and a standard contract document should be made available by the government/professional bodies for all building constructors to ensure the usability of BIM for construction project to enhance the construction design, process, analyze and resolve potential hazards and ensure that the building project is completed timely. Practical Implications: The study revealed the benefit of BIM software application for project planning Hence, the importance of BIM software cannot be overemphasized in achieving high building quality, innovative virtual design and project management in the modern world. Originality/value: This paper shows that Building information modelling software is an innovative way to practically design and manage project plan. BIM adoption is needed to enhance building performance and operation.

2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Martin Evans ◽  
Peter Farrell

PurposeThe construction industry encounters substantial challenges in its evolution towards sustainable development and in the adoption of building information modelling (BIM) technology and lean construction (LC) practices on construction mega-projects. This research aims to investigate the critical barriers encountered by key construction stakeholders in their efforts to integrate BIM and LC in the construction mega-projects.Design/methodology/approachA two-round Delphi survey shaped the foundation of aggregating consensus between an expert panel that examined a set of 28 barriers resulting from a detailed analysis of the extant literature. Descriptive and inferential statistical tests were exploited for data analysis, and interrater agreement analysis was used to elaborated and validate results.FindingsThe research concluded that the key barriers by descending order of significance are lack of mandatory BIM and LC industry standards and regulations by the government, resistance of the industry to change from traditional practices to LeanBIM, high cost of software licenses and training and running of BIM.Originality/valueThe research findings and the proposed mitigation strategy will enhance the application of BIM and LC practices in construction mega-projects and allow project key stakeholders to place emphasis on tackling the crucial challenges and barriers identified in this research.


2019 ◽  
Vol 266 ◽  
pp. 05003
Author(s):  
Khairool Aizat Ahmad Jamal ◽  
Mohammad Fadhil Mohammad ◽  
Norfashiha Hashim ◽  
Mohamed Rizal Mohamed ◽  
Mohd Adib Ramli

Malaysia is experiencing high economic growth which requires the construction industry to fulfill development demands. Building Information Modelling (BIM) had been widely publicized by the government in order to increase the industry’s productivity by instigating numerous initiatives aimed to spearhead its progression. In contrast with the aspiration, architects as key players of construction industry are still facing issues in adopting BIM into practice. Previous researches had broadly covered about BIM in construction industry, but few concentrations in specific to the local architect thus imposing gap of knowledge. In addressing the issues, the research aim to probe the current state of BIM implementation, primarily on the challenges that hinders its adoption. The BIM factors which covers people, process, policy and technology were derived and investigated through the use of 322 questionnaires distributed to architects at management and operational level. The study revealed the key barriers that contributes towards the problem is within the people factor, where majority highlighted the lacked of skilled and experienced BIM workforce which contributes towards steep learning environment as well as high cost of applying BIM. Consequently, several key strategic solutions had been indicated through both external and internal factors in addressing the challenge of BIM. Results suggested that there is a need of further support from the industry’s professional bodies, development of legal instruments, BIM enforcement, specific BIM education as well as BIM R&D programs.


Author(s):  
Nur Syamimi Zulkefli ◽  
◽  
Faizul Azli Mohd-Rahim ◽  
Nurshuhada Zainon ◽  
◽  
...  

Apropos to numerous environmental issues highlighted globally and locally, Malaysia has now moving forward towards new agenda of greening the cities. A positive movement trend of new green building in the country can be seen as number of projects going into green rating application are increasing yearly. Nevertheless, sustainability impact is considered as significantly small since newly developed green building represent small percentage as compared to the existing non-green building. Therefore, the idea of greening the existing building through refurbishment emerged in order to achieve wider sustainability objectives. Apart from that, supported with recent evolvement of technology and digitalization in construction industry, in lieu with governments’ strategies to adopt Industry 4.0, Building Information Modelling (BIM) has also been acknowledged and used broadly as a solution to integrate and facilitate management of information throughout building lifecycles. Considering these two areas; sustainability and BIM are continuously gaining momentum these days, this paper attempts to explore BIM’s potentials as an enabler to help greening the existing non-green building. Literature review is conducted focus on reviewing BIM and sustainability present status in Malaysian construction industry, also their relationship including examining potential areas where BIM may contribute to enhance the buildings’ sustainability performances. Based on the reviews, there is a potential of bridging the two areas considering both has becoming a national construction industry agenda since the government released CITP2016-2020. To further concur the ideas, literature reviews has also proven that the ability of BIM to facilitate various functions has enable it to support several sustainability analyses such as energy, carbon emission, lighting, water, materials and waste, building and site, and costing analysis.


2014 ◽  
Vol 75 (1) ◽  
Author(s):  
Zahrizan Zakari ◽  
Nasly Mohamed Ali Ali ◽  
Ahmad Tarmizi Haron ◽  
Amanda Marshall Ponting ◽  
Zuhairi Abd. Hamid

In Malaysia, Building Information Modelling (BIM) has recently gained attraction from construction players and some of them have applied it to several projects. By utilising the BIM process, the construction players have the opportunity to plan, coordinate and design in an integrated approach. This is one of the many benefits that they could gain and resulting in increased productivity. Despite these benefits, the implementation of BIM in the Malaysian construction industry is still lagging behind Singapore, for instance. Thus, it warrants a study such as the present to determine what are the actual barriers that hamper its implementation and what are the driving factors that could enhance its pace of implementation in the Malaysian construction industry. In this study, a questionnaire survey based on Convenience Sampling Method was carried out to gather the possible barriers and driving factors for BIM implementation among the Malaysian construction players. Additionally, Relative Importance Indices (RII) were used to analyse the data obtained and to identify those barriers and driving factors for the implementation of BIM in this country. Consequently, results of this study revealed that the main barriers for implementing the BIM are: 1) Lack of knowledge about BIM, 2) Reluctance and/or no insistence shown by the Malaysian construction industry players (Clients, Contractors and Consultants alike) on the use or implementation of BIM. The driving factors, on the other hand, that could lead to the speeding up of the implementation of BIM are: 1) Support and enforcing the implementation of BIM by the Government, 2) promote BIM training program and 3) Initiatives of senior management of the related industry players. In conclusion, for successful wide spread application of BIM in Malaysia, a good push from the government alone is far from enough. All other construction industry players mentioned must assume their roles well in promoting the use of BIM in their construction projects.


2019 ◽  
Vol 266 ◽  
pp. 05005 ◽  
Author(s):  
Dat Tien Doan ◽  
Ali Ghaffarianhoseini ◽  
Nicola Naismith ◽  
Tongrui Zhang ◽  
Attiq Ur Rehman ◽  
...  

Building Information Modelling (BIM) has rapidly developed in the construction industry recently; it is also considered as one of the core concepts in the Industry 4.0. However, BIM understanding is always seen as a significant problem for BIM implementation. Therefore, this paper aims to provide the insights into BIM awareness of the construction practitioners with the focus on the BIM definition in the New Zealand construction industry where BIM is still in its early stages. 22 interviews were conducted with 26 construction experts holding important positions in their companies and having at least eight years’ experience in the industry. The results indicated that BIM has a variety of meanings to the interviewees. Four different definitions including Building Information Model, Building Information Modelling, Building Information Management, and Software/Technology were identified which was considered inappropriate, the fallacies of definition, for the construction industry. Also, most of the construction practitioners are seen as not well-aware of BIM, especially the SMEs. Furthermore, the results also indicated that the BIM survey potentially provided a false result at least regarding the BIM adoption rate in the New Zealand construction industry, which urges the BIM survey host to clarify the BIM definition before conducting the survey. The results of this paper are hoped to alarm the government and construction organizations to have a unique BIM definition for BIM development in New Zealand to ensure the consistent understanding among the industry.


2020 ◽  
Vol 25 (2) ◽  
pp. 199-217
Author(s):  
Andreas F Van Roy ◽  
Adrian Firdaus

This article aims to identify the status of construction industry practitioners in Indonesia in terms of their knowledge and current practices as well as the barriers for implementing Building Information Modelling (BIM). This study utilises a questionnaire survey, aimed at the construction industry practitioners in Indonesia. The result shows that BIM is still a novelty for the construction practitioners in Indonesia. This is backed with the finding that more than 60% of the respondents was not familiar with BIM terminology or did not have proper knowledge of BIM terminology. More than 70% of the respondents' projects have implemented BIM Level 1, mostly in transportation service, energy production and distribution, roads and bridges, and the building infrastructure category. The five highest ranks of barriers to BIM implementation are lack of BIM training, lack of BIM experience and capability, no client demand, high cost in software and hardware acquisition, and inadequate information technology (IT) facilities. The recommended strategy should be initiated by the government, by conducting a comprehensive familiarisation programme covering BIM knowledge, BIM advantages and BIM implementation in the industry. At the same time, the government should prepare regulations and standards as guidance to BIM implementation in Indonesia.


Author(s):  
M M Mering ◽  
E Aminudin ◽  
C S Chai ◽  
R Zakaria ◽  
C S Tan ◽  
...  

2020 ◽  
Vol 8 (1) ◽  
pp. 4-17
Author(s):  
Nor Akmal Mohamad ◽  
Madihah Khalid

Building information modelling (BIM) is one of the new technologies being used in architectural and constructions projects. At present, BIM curricula are being taught in many Malaysian higher learning institutions, including at the certificate level in community colleges. Even though many studies have investigated behavioural intention to adopt BIM in the industrial setting, studies on the intention to use BIM among students during their training or learning have not received the same level of attention. This study, therefore, investigated the extent to which community college students are willing to accept and use BIM. Factors that influenced their behavioural intention to use BIM, as well as the relationship between the factors and intention to use were also examined. The Technology Acceptance Model (TAM) was used as the theoretical framework to guide the research, where students’ behavioural intention to use BIM was explained through their perceptions of its usefulness and ease of use, as well as their attitude towards BIM utilization in the classroom. A total of 144 community college students enrolled in the architecture programmes in Malaysia were selected as the sample using convenience sampling. The findings show that the students’ behavioural intention to adopt BIM is high. They also perceive BIM as useful and easy to use, and their attitude towards BIM usage appears to be positive. The regression model produced an adjusted R-squared value of 0.790 indicating that 79% of the total variance in the students’ intention to use BIM can be explained by the three independent variables, i.e., perceived usefulness, ease of use, and attitude. Keywords: Building information modelling, perceived usefulness, perceived ease of use, attitude, intention to use, behavioural intention, Technology Acceptance Model


Sign in / Sign up

Export Citation Format

Share Document