Delphi and Analytic hierarchy process for the construction of a risk assessment index system for post-stroke shoulder-hand syndrome

2022 ◽  
Vol 6 (0) ◽  
pp. e2022001
Author(s):  
YuHuan Zhang ◽  
ChunBo Fan ◽  
YongMei Luo ◽  
Dong Chen ◽  
ChunXiao Yang ◽  
...  
2012 ◽  
Vol 268-270 ◽  
pp. 2031-2034
Author(s):  
Zheng Li ◽  
Ding Gui Luo

The concrete assessment index of cheese dyeing enterprises’ cleaner production is filtered out by the classic Delphi method (Delphi) of expert evaluation. According to the characteristic of Analytic Hierarchy Process (AHP),we have identified the different levels. Finally, assessment index system was established and the weight of each index and standard value were also determined. The cleaner production level can be evaluated eventually more intuitively. So it can provide the technical support and guidance for cleaner production assessment of Cheese Dyeing Enterprises and realize a sustainable development of this kind of enterprises.


2011 ◽  
Vol 71-78 ◽  
pp. 2479-2482
Author(s):  
Ling Hua Wang ◽  
Rui Lian Wang ◽  
Pan Hua Ning

According to characteristics about the agricultural water, agricultural water level assessment index system was structured, and Analytic Hierarchy Process was used to determine the importance of each hierarchy in the system. The fuzzy scheme optimum method which was adopted to assess the agriculture system utilization water level. So the fuzzy problems about how to use mathematic method to analyse and deal with the agricultural water assessment were solved to a certain extent. The final result of the example indicated that fuzzy comprehension assessment method could reflect utilization water characteristic in different areas and also showed that the method is correct and practical.


2012 ◽  
Vol 204-208 ◽  
pp. 2028-2033 ◽  
Author(s):  
Zhong Chu Tian ◽  
Lei Yang ◽  
Tian Yong Jiang

The risk factors of continuous incremental launching bridge during construction stage are specialized. The risk in incremental launching stage is analyzed and identified. A risk assessment index system is built. A fuzzy comprehensive evaluation model is developed. The results obtained from the risk assessment model verifies the validity and practicality of the developed method by the combination of analytic hierarchy process and fuzzy mathematics theory. Moderate risk assessment results are developed to provide references for incremental launching construction method.


2014 ◽  
Vol 522-524 ◽  
pp. 1452-1456
Author(s):  
Can Liu ◽  
Shui Cheng Tian ◽  
Jie Liu

Assessment index system for safety capability of mine team leaders is established to assess their safety capability accurately, after defining its concept. The system is comprised of two layers, with 5 indexes in the first-layer and 14 indexes in the second-layer. Furthermore, the relative weights of indexes are determined by analytic hierarchy process (AHP). The grey relational assessment model for safety capability of mine team leader is constructed based on the indexes system. The safety capability of 4 mine team leaders are assessed by the model, according to the sequences in their safety capabilities. Assessment for safety capability based on AHP and GRA could be a tool for evaluation and decision-making in mining enterprises.


2014 ◽  
Vol 505-506 ◽  
pp. 990-994
Author(s):  
Rong Shi ◽  
Ming Jie Li

The work on Airlines security risk assessment at home and abroad is mainly confined to safety evaluation, and the research on security risk assessment is very few. Taking an example of flight safety system of an airline, fuzzy comprehensive evaluation and analytic hierarchy process (AHP) is used to calculate the value of the risk of flight safety system based on risk assessment matrix. Flight safety risk assessment index system is established, and weights of the index system are determined by analytic hierarchy process. The indicators relevant values of risk probability and severity are calculated respectively by using fuzzy evaluation. And ultimately the values of flight safety risk assessment are gotten. Example calculations demonstrate the feasibility, effectiveness and practicality.


2014 ◽  
Vol 955-959 ◽  
pp. 1873-1876
Author(s):  
Jing Zhao Zhang ◽  
De Wen Li ◽  
Hong Gang Wang

Based on the special circumstances of public safety at the railway station region, the risk assessment index system of public safety in this area is built. Analytic Hierarchy Process is selected as the method of decision making and comprehensive assessment. Taking the characteristics and pattern of historic development of the public safety situation in Xi’an railway station region, the rationality of index weights is verified. Then, the risk assessment of public safety in Xi’an railway station region is conducted through expert investigation and grading. The results show that the system security level of Xi’an railway station region is grade II, the evaluation scores of B1, B2 and B3 are 83.5, 84.4 and 87.8 respectively, the indexes of index layer whose system security level in grade I contain C9, C14, C23, C24, C29, C30, C32 and C35.


2020 ◽  
pp. 1-12
Author(s):  
Zhou Jiang ◽  
Zhenwu Wei

Grassland resources are an important part of land resources. Moreover, it has the functions of regulating the climate, windproof and sand fixation, conserving water sources, maintaining water and soil, raising livestock, providing food, purifying the air, and beautifying the environment in terrestrial ecosystems. Grassland resource evaluation is of great significance to the sustainable development of grassland resources. Therefore, this paper improves the BP neural network, uses the comprehensive index method to calculate the weights in the analytic hierarchy process, and constructs a water resources carrying capacity research and analysis system based on the entropy weight extension decision theory. Meanwhile, this paper analyzes different levels of resource and environmental carrying capacity to achieve the purpose of comprehensive evaluation of resource and environmental carrying capacity. In addition, based on the theory of sustainable development, under the guidance of the principle of index system construction, this paper studies the actual situation of grassland resources and the availability and operability of data, and combines with the opinions given by experts to form an evaluation index system of grassland resources and environmental carrying capacity. Finally, through the actual case study analysis, it is concluded that the model constructed in this paper has a certain effect.


Author(s):  
Ruzhen Luo ◽  
Chunmei Zhang ◽  
Yanhui Liu

In China, many young and middle-aged rural residents move to urban areas each year. The rural elderly are left behind. The number of the rural left-behind elderly is increasing with urbanization, but it is unclear which indicators can be used to assess their health condition. The health risk assessment index system was developed to improve the health level of the rural left-behind elderly. A two-round web-based Delphi process was used to organize the recommendations from fifteen Chinese experts in geriatrics, health management, social psychology who participated in this study. Meaningfulness, importance, modifiability, and comprehensive value of the health risk assessment indicators in the index system were evaluated. The effective recovery rates of the two-round Delphi were 86.67% and 92.31%, respectively. The judgement coefficient and the authority coefficient were 0.87 and 0.82, respectively. The expert familiarity was 0.76. Ultimately, the health risk assessment index system for the rural left-behind elderly consisted of five first-level indicators, thirteen second-level indicators, and sixty-six third-level indicators. The final indicators can be used to evaluate the health of the rural left-behind elderly and provide the basis for additional health risk interventions.


Sign in / Sign up

Export Citation Format

Share Document