A fuzzy back-propagation network approach for planning actions to shorten the cycle time of a job in dynamic random access memory manufacturing
2015 ◽
Vol 26
(8)
◽
pp. 1813-1825
◽
Keyword(s):
1996 ◽
Vol 35
(Part 1, No. 2B)
◽
pp. 1086-1089
◽
1996 ◽
Vol 35
(Part 1, No. 9B)
◽
pp. 4976-4979
◽
2021 ◽
Vol 21
(8)
◽
pp. 4216-4222
2004 ◽
Vol 43
(5A)
◽
pp. 2457-2461
◽
1998 ◽
Vol 45
(6)
◽
pp. 1300-1309
◽
Keyword(s):
Keyword(s):
2007 ◽
Vol 11
(10)
◽
pp. 1391-1397
◽