scholarly journals A novel approach to optimize the production cost of railway coaches of India using situational-based composite triangular and trapezoidal fuzzy LPP models

Author(s):  
Rakesh Kumar ◽  
Gaurav Dhiman ◽  
Neeraj Kumar ◽  
Rajesh Kumar Chandrawat ◽  
Varun Joshi ◽  
...  

AbstractThis article offers a comparative study of maximizing and modelling production costs by means of composite triangular fuzzy and trapezoidal FLPP. It also outlines five different scenarios of instability and has developed realistic models to minimize production costs. Herein, the first attempt is made to examine the credibility of optimized cost via two different composite FLP models, and the results were compared with its extension, i.e., the trapezoidal FLP model. To validate the models with real-time phenomena, the Production cost data of Rail Coach Factory (RCF) Kapurthala has been taken. The lower, static, and upper bounds have been computed for each situation, and then systems of optimized FLP are constructed. The credibility of each model of composite-triangular and trapezoidal FLP concerning all situations has been obtained, and using this membership grade, the minimum and the greatest minimum costs have been illustrated. The performance of each composite-triangular FLP model was compared to trapezoidal FLP models, and the intense effects of trapezoidal on composite fuzzy LPP models are investigated.

2021 ◽  
Vol 3 (1 (111)) ◽  
pp. 47-61
Author(s):  
Hendri Dwi Saptioratri Budiono ◽  
Finno Ariandiyudha Hadiwardoyo

A machining process is very dependent on the model created. The more complicated the model, the greater the design difficulty and the greater the machining process. Reduced production costs can help a company increase profits. A focus on production cost can be achieved in a number of ways, the first of which is by replacing materials or changing the design. It is better to reduce product costs during the design stage than during the manufacturing stage. The main objective of this research is to develop an application that can recognize features in a CAD program and calculate the complexity index of shapes in real time. In this study, the prismatic features and slab features classified by Jong-Yun Jung were used. The feature recognition method applied in this study is a hybrid of the rule-based and graph-based methods, which uses the STL file developed by Sunil and Pande to obtain all the information needed. Then, the results are extracted from feature recognition data and are used to calculate the product complexity index of the model being studied. This study applied the product complexity index, following the model developed earlier by El Maraghy. Validation is performed by comparing the software count with the complexity index calculated with the STEP method by Hendri and Sholeh et al. This research develops a program that recognizes features in CAD software and calculates the index complexity of shapes in real time. This will allow designers to calculate the expected complexity value during the design process. As a result, the estimated production cost can be seen early on. Finally, this software is tested for calculating the index values for the complexity of a combined features model. The use of eight slots and eight pockets as a benchmark scoring for shape produces a more accurate product complexity index


2018 ◽  
Vol 4 (2) ◽  
pp. 43-55
Author(s):  
Ika Yulianti ◽  
Endah Masrunik ◽  
Anam Miftakhul Huda ◽  
Diana Elvianita

This study aims to find a comparison of the calculation of the cost of goods manufactured in the CV. Mitra Setia Blitar uses the company's method and uses the Job Order Costing (JOC) method. The method used in this study is quantitative. The types of data used are quantitative and qualitative. Quantitative data is in the form of map production cost data while qualitative data is in the form of information about map production process. The result of calculating the cost of production of the map between the two methods results in a difference of Rp. 306. Calculation using the company method is more expensive than using the Job Order Costing method. Calculation of cost of goods manufactured using the company method is Rp. 2,205,000, - or Rp. 2,205, - each unit. While using the Job Order Costing (JOC) method is Rp. 1,899,000, - or Rp 1,899, - each unit. So that the right method used in calculating the cost of production is the Job Order Costing (JOC) method


2020 ◽  
Vol 8 (2) ◽  
pp. 128-149
Author(s):  
Dini Maulana Lestari

This paper will discuss about the immaterial costs and production yields at one of the refined sugar factory companies in Makassar, South Sulawesi. The theory is based on the fact that Immaterial is a cost that is almsgiving, meaning costs that are outside of the basic costs of the company in producing production, so this research aims to find out: (1) what is the production cost needed to produce this production, (2) the maximum level of production at company from 2013 to 2017. This type of research is a quantitative study because it uses a questionnaire in the form of values ​​that are processed using the marginal cost approach formula. The results of the analysis show that (1) the maximum level of production costs occurred in 2016 amounting to 6,912 with an Immaterial cost of Rp. 2,481,796,800 and the total production produced is 359,077.3 tons (2) The required workforce with the total production produced is 359,077.3 tones of 180 people including the maximum production point which means that the lowest value is achieved (optimal).    


2020 ◽  
Vol 2 (1) ◽  
Author(s):  
Nurul Mukminah ◽  
Rita Purwasih

This study aims to determine and compare the profitability of different types of broiler chicken farms (open and cloused houses) in Subang Regency. This study involved 9 farmers consisting of 5 farmers with closed house and 4 farmers with open house who partnered with PT. Surya Unggas Mandiri (PT. SUM). Production costs taken are 2 production periods from May-August 2018. Data are analyzed using economic analysis and descriptive methods. The results showed that the production cost per period per 1000 birds closed house was higher (Rp. 27.656.768,-) compared to open house (Rp. 24.975.671,-). The revenue per period per 1000 birds of closed house is higher (Rp. 30.606.931,-) compared to open house (Rp. 25.788.618,-). The profit of farmers who use closed house is higher (Rp. 2.621/period/bird) than open house (Rp.417,-). The profitability in close house s is 9.48% and is very feasible to develop


2019 ◽  
Vol 4 (2) ◽  
pp. 205-214
Author(s):  
Erika Fatma

Lot sizing problem in production planning aims to optimize production costs (processing, setup and holding cost) by fulfilling demand and resources capacity costraint. The Capacitated Lot sizing Problem (CLSP) model aims to balance the setup costs and inventory costs to obtain optimal total costs. The object of this study was a plastic component manufacturing company. This study use CLSP model, considering process costs, holding costs and setup costs, by calculating product cycle and setup time. The constraint of this model is the production time capacity and the storage capacity of the finished product. CLSP can reduce the total production cost by 4.05% and can reduce setup time by 46.75%.  Keyword: Lot size, CLSP, Total production cost.


2010 ◽  
Vol 36 (5) ◽  
pp. 984-989
Author(s):  
Zhe ZHAO ◽  
Chun-Hua REN ◽  
Xiao JIANG ◽  
Lü-Ping ZHANG ◽  
Juan FENG ◽  
...  

1997 ◽  
Vol 36 (8-9) ◽  
pp. 19-24 ◽  
Author(s):  
Richard Norreys ◽  
Ian Cluckie

Conventional UDS models are mechanistic which though appropriate for design purposes are less well suited to real-time control because they are slow running, difficult to calibrate, difficult to re-calibrate in real time and have trouble handling noisy data. At Salford University a novel hybrid of dynamic and empirical modelling has been developed, to combine the speed of the empirical model with the ability to simulate complex and non-linear systems of the mechanistic/dynamic models. This paper details the ‘knowledge acquisition module’ software and how it has been applied to construct a model of a large urban drainage system. The paper goes on to detail how the model has been linked with real-time radar data inputs from the MARS c-band radar.


Author(s):  
Brij B. Gupta ◽  
Krishna Yadav ◽  
Imran Razzak ◽  
Konstantinos Psannis ◽  
Arcangelo Castiglione ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document