An intuitionistic method for the selection of a risk management approach to information technology projects

2017 ◽  
Vol 375 ◽  
pp. 202-218 ◽  
Author(s):  
Antonio Rodríguez ◽  
Francisco Ortega ◽  
Ramiro Concepción
2021 ◽  
Vol 2 (1) ◽  
pp. 1-8
Author(s):  
Ahmed muayad younus Alzahawi ◽  
Mohanad Abumandil

This study aims to investigate the relationship between Scrum framework and risk management processes in Malaysia. Companies discuss the management based on a concerned business scale and the influence risk management in Malaysia Information technology projects success. This research is targeting Information technology firms and technology projects. Were researched through guarantee inside and out comprehension of the postulation foundation. In the outcome segment, the author influences a few proposals for the case to small-scale organizations to actualize ventures and to develop risk management successfully. The phases of risk management, in particular the step of risk detection, have a detrimental impact on project performance. Furthermore, risk control has its own risks as a mechanism. This makes it impossible to know if risk management is an appropriate approach in the IT production process for managing and minimizing risks. The study shows the effect of risk management in IT businesses is utilized in the Scrum


2009 ◽  
Vol 40 (3) ◽  
pp. 72-81 ◽  
Author(s):  
Elmar Kutsch ◽  
Mark Hall

The management of risk is considered a key discipline by the Project Management Institute and the Association for Project Management. However, knowledge of what needs to be done frequently fails to result in action consistent with that knowledge. The reasons for this seem to have received little attention. This study researched the degree of use of project risk management and barriers that prevent IT project managers from using risk management. Interviews and a survey were carried out. The results show that, in one-third of cases, because of the problem of cost justification, no formal project risk management process was applied.


Author(s):  
Furry Arifin

This article contains several things to be controlled by a Project Manager in order to be able to develop a software engineering project plan. The development methodology begins with survey, analysis and engineering in software planning. Establishing a good project team structure is as important as selecting team members who are also experts in their field. Perceiving that the construction and implementation of information technology-based systems are executed using a project management approach, the project manager is then the most responsible officer for the team performance. The project Manager will lead his team to planning and developing information technology projects in accordance with their intended target. There are three fields that must be considered in an information system project, namely: information systems, information technology, and information management. 


Author(s):  
Ehsan Mousakhani ◽  
Shirzad Ranjbar ◽  
Taha Ashoori

Abstract Transferring all or some parts of the engineering activities or supply of goods to third persons or companies is one of the adopted methods that transfer a significant part of the likely risks to the concerned side. Out­sourcing activities are followed by many benefits, such as reducing overhead and operational costs, increasing efficiency, reducing risk, and so on; however, if this is not done carefully, not only is no benefit gained, but also new risks are imposed on the organization. Considering that waste of time and cost diversions of projects stem from the selection of inappropriate contractors, risk assessment is important in outsourcing. Using a risk-oriented approach based on software toward outsourcing, the present study aims to identify and rate the factors affecting the selection of contractors and to finally provide a method to evaluate and select the proper way for the selection of contractors. This method is not just based on the lowest price, but it also includes several factors that influence the selection of contractors, which is achieved by applying the Expert Choice software. At first, the most important risk factors in the selection of contractors were identified according to the conducted research. Then, the factors that had the greatest risk potential for achieving the project goals were chosen from among them. The opinions of experts were obtained in the next phase to determine the importance of various factors in the process of contractor selection, which was achieved by the distribution of a questionnaire. Subsequently, the most important factors chosen by the experts were specified, and their relationship with the contractor’s risk management was found.


Sign in / Sign up

Export Citation Format

Share Document