An EWA framework for the probabilistic-based structural integrity assessment of offshore platforms

2018 ◽  
Vol 59 ◽  
pp. 60-79 ◽  
Author(s):  
M. Zeinoddini ◽  
Y. Yaghubi Namin ◽  
H. Matin Nikoo ◽  
H. Estekanchi ◽  
M. Kimiaei
2001 ◽  
Vol 41 (1) ◽  
pp. 727
Author(s):  
A.D. Barton

Esso Australia Pty Ltd (Esso) has embraced the framework of risk management to improve the focus and priorities of its inspection and maintenance activities. Structural integrity is one of the disciplines that has adopted a risk-based approach to inspection and integrity assessment and this has been applied to Esso/BHP’s 18 offshore platforms located in Bass Strait.The paper provides a discussion of the issues faced in the management of structural integrity of offshore platforms which lead to the development of a risk-based inspection (RBI) strategy. RBI is applied to improve the prediction of the structures’ condition and provides a consistent basis for continued improvement in the future. The RBI model generates targeted inspection workscopes for each platform that, coupled with the implementation of appropriate inspection techniques, ensure that the integrity of the platforms can be managed with greater confidence and at lower cost.The RBI approach has resulted in reduced focus on traditional areas of uncertainty such as fatigue of tubular joints, and increased focus on secondary structures, for example service caissons. This shift in focus is made possible by building into the risk model a calibration process that considers previous inspection data. A key component of this calibration is a new method developed to calibrate tubular joint fatigue lives.


Author(s):  
Hamid Golpour ◽  
Mostafa Zeinoddini ◽  
Hadi Khalili ◽  
Ali Golbaz ◽  
Yashar Yaghubi ◽  
...  

The existing knowledge on the structural integrity assessment of offshore platforms may benefit from case studies on the life extension evaluations of aging structures. This paper presents a case study for the structural integrity assessment of an existing 8 legged aging drilling platform located in the Persian Gulf. The platform is now 42 years old and the objective of the study is to check its fit for purpose for a life extension of 25 years beyond 2012. The structural model is based on the best estimates of the existing conditions of the platform. A number of analysis approach such as i) assessment based on the previous exposures, ii) linear (elastic), iii) equivalent linear (or the linear global analysis with local overload considerations), and iv) non-linear analysis methods have been used to estimate the structural integrity of the platform. The paper provides further background, clarifications and proposed updates to API-RP 2A-Section 17. The paper is divided into three parts. Section 1 is a discussion on the background of the previous assessment study and perspective view on why the case study platform needs to be assessed. Section 2 and Section 3 include the finding of the code-noncompliance points of the platform based on the recommendations of API RP 2A-2007. Section 4 presents the remedy actions recommended for the fit for purpose of the platform.


2013 ◽  
Author(s):  
Roberto Piva ◽  
Margherita Latronico ◽  
Andrea Nero ◽  
Stefano Sartirana

Author(s):  
Daigo Watanabe ◽  
Kiminobu Hojo

This paper introduces an example of structural integrity evaluation for Light Water Reactor (LWR) against excessive loads on the Design Extension Condition (DEC). In order to assess the design acceptance level of DEC, three acceptance criteria which are the stress basis limit of the current design code, the strain basis limit of the current design code and the strain basis limit by using Load and Resistance Factor Design (LRFD) method were applied. As a result the allowable stress was increased by changing the acceptance criteria from the stress basis limit to the strain basis limit. It is shown that the practical margin of the LWR’s components still keeps even on DEC by introducing an appropriate criterion for integrity assessment and safety factors.


Author(s):  
Sébastien Fouques ◽  
Ole Andreas Hermundstad

The paper is concerned with the launch of free-fall lifeboats (FFL). It proposes a method that complies with the DNV-OS-E406 standard in order to select characteristic launches from Monte Carlo simulations for further structural load assessment with CFD and FEM. Proxy variables derived from kinematic parameters and aiming at predicting pressure load indicators are computed with the VARUNA launch simulator developed by MARINTEK. The statistical distributions of the proxy variables obtained from the Monte Carlo simulations are used to identify critical scenarios, and characteristic launches can then be selected from a chosen probability level. The feasibility of the proposed method is documented in the paper for several types of pressure loads. Existing model test data from various FFL-launch campaigns in calm water and in waves are used to compute the proxy variables as it would be done in the VARUNA simulator. Scatter diagrams showing the correlation with actual measured pressure load indicators are then established to assess the quality of the chosen proxy variables.


Author(s):  
Dominique Moinereau ◽  
Jean-Michel Frund ◽  
Henriette Churier-Bossennec ◽  
Georges Bezdikian ◽  
Alain Martin

A significant extensive Research & Development work is conducted by Electricite´ de France (EDF) related to the structural integrity re-assessment of the French 900 and 1300 MWe reactor pressure vessels in order to increase their lifetime. Within the framework of this programme, numerous developments have been implemented or are in progress related to the methodology to assess flaws during a pressurized thermal shock (PTS) event. The paper contains three aspects: a short description of the specific French approach for RPV PTS assessment, a presentation of recent improvements on thermalhydraulic, materials and mechanical aspects, and finally an overview of the present R&D programme on thermalhydraulic, materials and mechanical aspects. Regarding the last aspect on present R&D programme, several projects in progress will be shortly described. This overview includes the redefinition of some significant thermalhydraulic transients based on some new three-dimensional CFD computations (focused at the present time on small break LOCA transient), the assessment of vessel materials properties, and the improvement of the RPV PTS structural integrity assessment including several themes such as warm pre-stress (WPS), crack arrest, constraint effect ....


Sign in / Sign up

Export Citation Format

Share Document