scholarly journals The methodic of calculation for the need of basic construction machines on construction site when developing organizational and technological documentation

2018 ◽  
Vol 33 ◽  
pp. 03077 ◽  
Author(s):  
Boris Zhadanovsky ◽  
Sergey Sinenko

Economic indicators of construction work, particularly in high-rise construction, are directly related to the choice of optimal number of machines. The shortage of machinery makes it impossible to complete the construction & installation work on scheduled time. Rates of performance of construction & installation works and labor productivity during high-rise construction largely depend on the degree of provision of construction project with machines (level of work mechanization). During calculation of the need for machines in construction projects, it is necessary to ensure that work is completed on scheduled time, increased level of complex mechanization, increased productivity and reduction of manual work, and improved usage and maintenance of machine fleet. The selection of machines and determination of their numbers should be carried out by using formulas presented in this work.

1996 ◽  
Vol 2 (8) ◽  
pp. 84-100 ◽  
Author(s):  
Gintautas Ambrasas ◽  
Artūras Kaklauskas ◽  
Edmundas K. Zavadskas

The paper describes the Demonstration System suggested by the authors. This Demonstration System enables efficient performance of alternative life-time process planning, multicriteria assessment, utility degree determination and selection of the most efficient versions of various projects and their constituent parts: Determination of rational design solutions for walls, windows, roof structures, basement floor, heating system. Selection of rational constituent parts of a project (selection of construction site and location, multipurpose complex assessment of buildings, determination of rational types of contracts). Selection of efficient interested parties (contractors, suppliers, neighbours). Alternative designing of life-time process of a project (one-family dwelling houses; agricultural, cast-in-place, prefabricated panel, and thermal renovation of buildings), its multicriteria assessment, determination of utility degree and selection of the most efficient version: Determination of efficient investment projects. Preparation of recommendations on efficiency increase of projects. Alternative roof-to-basement designing of a building (one-family dwelling houses; agricultural, cast-in-place, prefabricated panel, and thermal renovation of buildings) and its multicriteria analysis. This Demonstration System enables to perform alternative designing of projects and their constituent parts, multicriteria analysis, determination of utility degree and priority and preparation of recommendations on further improvement of projects. The Demonstration System is composed of two main parts: knowledge and decisionmaking subsystem. The knowledge base contains information (system and subsystems of criteria, values and significance of criteria, etc.) fully characterizing life-time processes of various projects (investments, buildings and so forth) and their constituent parts. For instance, knowledge base of life-time process of constituent parts of a building consists of information on alternative construction sites, buildings, designers, contractors, suppliers and so on. A construction site can be described by the following system of criteria: cost, assessment of existing services (water supply, sewerage, gas, electric power supply), air contamination level, living expenses, shopping possibilities, assessment of possibilities for recreation, sports and medical care, possibility to find a job, development outlooks of the district, transport conveniences, etc. The composed knowledge base is processed in various sections by decision-making subsystem. The multicriteria analysis of received results is performed by decision-making subsystem two. The Demonstration System is used by Bachelors, Engineers and Masters while working on their term and final projects. The paper gives a more detailed analysis of the proposed System. There is presented one of works performed by means of the Demonstration System.


2021 ◽  
Vol 258 ◽  
pp. 09066
Author(s):  
Andrey Schreiber ◽  
Ivan Abramov ◽  
Zaid Al-Zaidi

Since 2003, the territory of Iraq there were many military conflicts and conducted a large number of terrorist operations, especially in the capital Baghdad.As a result, construction work in Baghdad began to increase after 2003, which led to an increase in construction risks. The most dangerous risks were military conflicts that occurred near the construction site and affected the workforce, equipment and the construction site itself. The purpose of the study is to identify the most important factors causing risks during construction in Baghdad due to military operations and terrorist threats, to assess the degree of impact of these factors on the duration, cost and quality of construction work, as well as on the safety of workers and the economic situation of construction enterprises. The object of the study is the Al-Radwaniyah residential complex under construction in Baghdad, which is located near the US military base. In the course of the study, the most important military factors causing risks were identified, and then a questionnaire survey was conducted to determine the degree of impact of these factors among employees of enterprises involved in the construction of the specified residential complex (contractors, engineers, consultants, etc.). After processing the results of the questionnaire, the risk factors were analysed using a statistical method. This made it possible to establish the degree of impact of each factor. The study showed the degree of influence of military factors that cause risks, in particular, on the safety and life of workers, the impact on the psychological and social state of the working staff in general. It was also found that sudden military clashes and terrorist operations in the study region have a negative impact on the economic and financial situation of the construction project, lead to a delay in the project and increase its cost. Therefore, it is necessary to look for solutions to avoid or reduce these factors in areas where there is a possibility of their sudden occurrence.


Author(s):  
Jairaj Desai ◽  
Howell Li ◽  
Jijo K. Mathew ◽  
Yi-Ting Cheng ◽  
Ayman Habib ◽  
...  

AbstractThe Federal Highway Administration (FHWA) reported between 2016 and 2017, fatal crashes in work zones increased by 3%, while fatal crashes outside of work zones decreased by 1.5%. The FHWA also reported that work zones account for approximately 10% of the nation’s overall congestion and 24% of unexpected interstate delays. This paper reports on a study of 23 construction work zones that covered approximately 150 centerline miles of Indiana interstate roadway in the summer of 2019. Approximately 50% of all interstate crashes for the period of May to September 2019 occurred within or in an approach upstream or downstream of one of these work zones. Commercially available vehicle hard-braking event data is used for the study and geofenced to the work zone approaches and limits. This research examined 196,215 hard-braking events over a 2-month period in the summer of 2019 and 3132 crashes over the same 2-month period in 2018 and 2019 for the 23 interstate work zones. The study found there were approximately 1 crash/mile for every 147 hard-braking events in and around a construction site. The R2 was approximately 0.85. The paper concludes by recommending that hard-braking event data be used by agencies to quickly identify emerging work zone locations that show relatively large number of hard-braking events for further evaluation.


Author(s):  
Shumank Deep ◽  
Mohd Asim ◽  
Mohd Kashif Khan

Abstract Practically speaking, not all real estate construction projects are accomplished in the defined span and within budget. Various factors responsible for occurrence of delays are one of the long-standing issues in the field of real estate. Delays make contractors endure productivity loss, cause high disturbance expenses, and prolongation costs. The aim of the research is to summarize several delay causing factors, which are observed in the execution of previous real estate construction projects. It then proposes implementation of standard prevention procedures to minimize delays. Time effect examination is the approach to evaluating and allotting the upshots of delays or changing a venture schedule. This review sets execution framework of the two sub-principles of the Toyota Way attributes known as philosophy sub-principles and process subprinciples to guide real estate construction businesses in their lean change to delay free real estate construction work. These are implemented after investigating the critical factors responsible for delays in the delayed projects by comparing their as-planned schedules with the adjusted schedules. Methods used in the research include structured surveys and content analysis, which is performed after collection of quantitative data from the respondents. The lean construction principles will be designed and provided to clients to be productive in performing work packages on their scheduled time with minimum possibility of time overrun.


2021 ◽  
Vol 13 (2) ◽  
pp. 544
Author(s):  
Michał Tomczak ◽  
Piotr Jaśkowski

In the literature on the scheduling of construction projects it is difficult to find a justification for adopting the criteria for evaluating work schedules based explicitly on the preferences of those who develop them. This article tries to fill this gap and provide information on the preferences of construction site managers for sustainable scheduling and organization of construction projects. The publication focuses on the views and needs of construction site engineering staff regarding methods of work organization, the need to reduce downtimes in the work of crews, the deadline for project realization and the selection of crews for tasks. This information was obtained on the basis of surveys conducted among managerial staff of various levels (74 people). The authors hope that the information provided in this publication will allow the creation of more reliable tools to support construction managers better adapted to their preferences and needs, and therefore more likely to be applied in practice.


2017 ◽  
Vol 9 (1) ◽  
Author(s):  
Imam Setiadi ◽  
Dinda Rita K. Hartaja

Selection of the appropriate composition desalination units can be done with a variety of method approaches, one of the method is the Analytic Hierarchy Process. In determining the desalination unit with AHP method to consider is setting a goal, an alternative criteria and pairwise comparison. Research for the determination of the exact composition of the desalination unit in order to achieve sustainable drinking water suppy in coastal areas and small islands has been conducted. The results of the study are as follows, the energy demand of 50.83%, operator costs of 26.64%, maintenance costs of 14.13% and chemical requirement 8.4%. For an alternative composition desalination unit of RO 10 m3 / day is the best alternative composition with value of 59.61%, the composition of the next alternative is RO 20 m3/ day of 30.40% and the last alternative of the desalination unit composition is RO 120 m3/ day of 09.99%.Key words : Desalination, Mukti Stage Flash Composition, AHP


Kerntechnik ◽  
2008 ◽  
Vol 73 (3) ◽  
pp. 118-121
Author(s):  
T. Heinrich ◽  
L. Funke ◽  
M. Köhler ◽  
U.-K. Schkade ◽  
F. Ullrich ◽  
...  