scholarly journals Typical Construction Technology and Method of UHV Main Transformer

2018 ◽  
Vol 38 ◽  
pp. 04003
Author(s):  
Chen Kerui ◽  
Han Yang ◽  
Wang Lei ◽  
Pei Ying ◽  
He Dengsen ◽  
...  

According to the latest experience of UHV transformer on-site installation work, according to the rules and regulations requirements, the construction process and process of UHV transformer are summarized, and a typical UHV transformer construction method commonly used at present is obtained. Operation comes down to the arrival of acceptance, annex installation, vacuum oiling and hot oil circulation, sealing inspection, standing five processes. In accordance with the above process steps, this paper is divided into five parts to introduce the process and method of UHV transformer construction in order to guide the on-site construction and training teaching.

2013 ◽  
Vol 395-396 ◽  
pp. 548-554
Author(s):  
Cheng Zhu ◽  
Rui Li ◽  
Zhi Yun Zhang

With the advantages such as shortening the construction period, not affecting the relative navigation and effectively reducing the construction cost, jacking construction technology has been widely applied, as the construction method compared with other conventional construction method is more complicated, it is necessary to discuss the control technology of jacking force during the construction process.


Electronics ◽  
2021 ◽  
Vol 10 (4) ◽  
pp. 513
Author(s):  
Dylan Kobayashi ◽  
Ryan Theriot ◽  
Noel Kawano ◽  
Jack Lam ◽  
Eric Wu ◽  
...  

The Destiny-class CyberCANOE (Destiny) is a Hybrid Reality environment that provides 20/20 visual acuity in a 13-foot-wide, 320-degree cylindrical structure comprised of tiled passive stereo-capable organic light emitting diode (OLED) displays. Hybrid Reality systems combine surround-screen virtual reality environments with ultra-high-resolution digital project-rooms. They are intended as collaborative environments that enable multiple users to work minimally encumbered for long periods of time in rooms surrounded by data in the form of visualizations that benefit from being displayed at resolutions matching visual acuity and/or in stereoscopic 3D. Destiny is unique in that it is the first Hybrid Reality system to use OLED displays and it uses a real-time GPU-based approach for minimizing stereoscopic crosstalk. This paper chronicles the non-trivial engineering research and attention-to-detail that is required to develop a production quality hybrid-reality environment by providing details about Destiny’s design and construction process. This detailed account of how a Hybrid Reality system is designed and constructed from the ground up will help VR researchers and developers understand the engineering complexity of developing such systems. This paper also discusses a GPU-based crosstalk mitigation technique and evaluation, and the use of Microsoft’s augmented reality headset, the HoloLens, as a design and training aid during construction.


2014 ◽  
Vol 548-549 ◽  
pp. 1790-1794
Author(s):  
Xia Zhao ◽  
You Ping Ding ◽  
Xiu Yan Zhang

In order to analyze the effect of heat preservation, the heat preservation technology of detail structure, such as decorative lines of external walls, edge beam and edge column, windows, balcony and laying position of air conditioner, have been well treated under the system of thin plastered external wall based on EPS. Moreover, the technical-economy benefits of detail structure treatments have been analyzed by comparing with those without detail structure treatment. The results show that better heat preservation and economy benefits would be created by detail structure treatment, which could provide good reference for similar construction process.


Author(s):  
Simon Hoffmann ◽  
Amit Kutumbale ◽  
Danilo Della Ca'

<p>A bridge’s bearings, arguably its most critical components, perform a vital function throughout the bridge’s service life, but the bearings used can also have a significant impact on the bridge construction process. Suitably designed adjustable bearings are an integral part of the incremental launch method of bridge construction, for instance, which can be a very efficient construction method. Adjustable bearings may also support other bridge construction methods, such as segmental bridge construction, where fixities/freedoms that applied during the construction phase require to be changed before the bridge enters service. Lifting bearings, the height of which can be increased, may enable a lack of precision in the structure to be tolerated, and measuring bearings may enable load distribution during bridge construction to be verified, where this is required by the construction method. Design features of otherwise standard bearings that support quick and high-quality installation can also contribute towards the efficiency of the overall bridge construction process, as can the use of bearing designs which minimize bearing size. Bearing solutions and features that facilitate bearing installation and bridge construction in ways such as these are described.</p>


2013 ◽  
Vol 353-356 ◽  
pp. 1604-1608
Author(s):  
Guang Bin Bai ◽  
Jie Zhao ◽  
Li Sheng Liu

Based on a subway tunnel construction, the construction method was introduced. The ground subsidence, crown settlement and convergence displacement caused by the cut tunnel are monitored during the tunneling construction and the results of monitoring data for them are analyzed. This technology wells to guide the tunnel-entering construction effectively and avoid the tunnel-entering construction process prone to landslides, thus ensuring the safety of the tunnel construction and will guiding the future construction.


2011 ◽  
Vol 255-260 ◽  
pp. 65-69
Author(s):  
Hua Feng Deng ◽  
Min Zhu ◽  
Jing Guo ◽  
Tao Lu

Chimney is the building which is high but the horizontal cross section is small, so the high altitude work surface is small and difficult to construct, in which the stability of the scaffold and the safety of vertical transport equipment are especially important. For the serious problems arising in the prophase construction of the 50m chimney, double rows steel pipe scaffold was designed outside the chimney, and the vertical transportation uses the external grillage hoisting frame. Reformed the internal existing scaffold into pedestrian passage to separate people and material, and a detailed calculation analysis of the structural members such as scaffold, grillage hoisting frame and other structures was carried out. Large deformation, destabilization and other safety problems of the scaffold, grillage hoisting frame and other structures were not arising during the anaphase construction process, which indicates that the construction technical measures and calculation and analysis results are with important guiding significance to guarantee the smooth of the construction, and also can be referenced by other similar projects.


2011 ◽  
Vol 71-78 ◽  
pp. 1392-1397 ◽  
Author(s):  
Wen Xiong Huang ◽  
Li Ying Tan ◽  
Kang Jing Zhou

Cracks on the Joint Part between Pier and Girder, namely Block NO.0 in the construction process, has become one of the major diseases of continuous rigid-frame bridges. Based on the real construction technology, process and environment of Yuquanxi Bridge, the uneven distribution of stress caused by various factors is precisely analyzed by ANSYS. The shrinkage difference of concrete, the excessive hydration heat, and the sunshine temperature difference is accurately simulated respectively. By comparing the numerical results with actual cracks condition, the results prove that the theoretical analyse is accord with the actual situation, and the real reason of cracks on Block No.0 of Yuquanxi Bridge is uncovered. This study is of great practical value in preventing cracks and improving bridge construction technology.


2005 ◽  
Vol 30 (4) ◽  
pp. 48-50
Author(s):  
Cristina Almazán

This incremental housing programme combines resources from participating families with traditional joint savings schemes and micro-credit to help those who have no access to formal credit to build new homes or improve their existing accommodation. Families are involved in the design process of their homes and training is provided in self-help construction methods. The construction process is phased to avoid families becoming financially overstretched. The consolidation of community organisation and solidarity, the empowerment of women and development of savings capacity are important elements of this well-established programme that has to date funded the construction and/or improvement of over 800 homes in the state of Veracruz, Mexico.


Sign in / Sign up

Export Citation Format

Share Document