scholarly journals Strategic framework for implementing smart devices in the construction industry

2021 ◽  
Vol 21 (2) ◽  
pp. 218-243
Author(s):  
Manuel Alexander Silverio-Fernández ◽  
Suresh Renukappa ◽  
Subashini Suresh

Purpose The decentralisation of information and high rate of mobile content access in the construction industry provide an ideal scenario for improvement of processes via the implementation of the paradigm of the Internet of Things (IoT). Smart devices are considered as the objects interconnected in the IoT; therefore, they play a fundamental role in the digital transformation of the construction industry. Currently, there is a lack of guidelines regarding the implementation of smart devices for digitalisation in the construction industry. Consequently, this paper aims to provide a set of guidelines for implementing smart devices in the construction industry. Design/methodology/approach An empirical study was performed in the UK and the Dominican Republic (DR). Following a systematic approach, qualitative data collection and analysis was performed based on semi-structured interviews involving professionals from construction companies in the UK and the DR. Interviews were recorded and subsequently transcribed using Microsoft Word and exported to the software NVivo, where the software was used to find common thematic nodes across all interviews. Findings The findings encompass drivers, challenges and critical success factors (CSFs) for implementing smart devices in construction project. For both countries, the top five CSFs were leadership, staff training, culture, technology awareness and cost of implementation. These findings were used to develop a strategic framework for implementing smart devices in construction companies. The framework establishes the actors, elements and actions to be considered by construction companies when implementing smart devices. Originality/value This paper provides a richer insight into the understanding and awareness of implementing smart devices. A strategic framework for implementing smart devices in the construction industry and providing guidelines for adopting smart devices in construction projects was developed and validated. This study provides a better understanding of the key factors to be considered by construction companies when embedding smart devices into their projects.

2019 ◽  
Vol 26 (8) ◽  
pp. 1625-1640 ◽  
Author(s):  
Manuel Alexander Silverio-Fernandez ◽  
Suresh Renukappa ◽  
Subashini Suresh

Purpose The decentralisation of information and high rate of mobile content access in the construction industry provides an ideal scenario for improvement of processes via the implementation of the paradigm of the Internet of Things (IoT). Smart devices are considered as the objects interconnected in the IoT; therefore, they play a fundamental role in the implementation of digital solutions during the execution of construction projects. The purpose of this paper is to assess the critical factors for a successful implementation of smart devices in the construction industry. Design/methodology/approach An empirical study was performed in the Dominican Republic. This country, located at the heart of the Caribbean, presents an economy that strongly relies on the construction industry. Following a systematic approach, a qualitative data collection and analysis was performed based on semi-structured interviews and content analysis to professionals of construction companies in the Dominican Republic, enquiring the concept of smart devices and critical success factors for implementing the devices in the industry. Findings The key success factors obtained from the contestants were leadership, technology awareness, company size, usability of proposed solution, cost of implementation and interoperability. Originality/value This paper provides information to clients of the construction sector regarding the benefits of embedding smart devices into their business activities. Furthermore, this study provides a better understanding of the key factors to be considered by construction organisations when embedding smart devices into their projects. This study also provides recommendations for distinct stakeholders of the construction sector, such as policy makers, clients and technology consultants. Policy makers should especially consider factors such as technology awareness and leadership to develop the right policies for the integration of the IoT in construction projects. Technology consultants should be aware of the latest case studies of successful implementation of smart devices and IoT systems in the world in order to adapt and implement smart devices and IoT in their projects.


Author(s):  
Lukumon O. Oyedele ◽  
Martin Regan ◽  
Jason von Meding ◽  
Ashraf Ahmed ◽  
Obas John Ebohon ◽  
...  

PurposeThe UK construction industry produces up to one third of all waste to landfill. This study aims to identify specific project practices impeding the reduction of waste in construction projects as well as uncovering potential waste solutions throughout the project delivery process. The rationale being that for such a drastic reduction in waste to landfill, holistic and extensive measures would be required.Design/methodology/approachA two‐way methodological approach was used. This comprised qualitative unstructured interviews and a quantitative questionnaire survey of three major stakeholders in the UK construction industry: clients, architects and contractors.FindingsDesign factors remain the major cause of impediments to waste reduction to landfill. Critical impediments include clients making waste prevention a top priority in projects, overly complex designs, waste taking a low priority compared to project time and costs, lack of concerns by designers for buildability, among others. Critical solutions include early supply chain involvement in design process, choosing materials for their durability, early communication of design changes to all parties, longer project programmes and better lead times, among others.Practical implicationsIn all, the target of halving construction waste to landfill based on the 2008 benchmark is achievable but would require construction companies to take it upon themselves to implement the proposed solutions suggested by this study.Originality/valueThe value of this research is to provide UK construction companies with solutions to reduce waste and aid the reaching of the landfill target, as landfill is decreasing as a solution to waste. In addition the cost savings on reducing waste could be crucial for companies in this current economic climate.


Author(s):  
Habeeb Kusimo ◽  
Lukumon Oyedele ◽  
Olugbenga Akinade ◽  
Ahmed Oyedele ◽  
Sofiat Abioye ◽  
...  

Purpose The purpose of this paper is to identify challenges faced in resource management in the UK construction industry and to propose some solutions to these problems. Design/methodology/approach Based on a qualitative research methodology, 14 experts from the UK construction industry were chosen to be participants in the study. The participants were equally divided into two focus groups to discuss resource management using five projects as case studies. Thematic analysis of the discussion reveals seven key factors that affect resource management. Findings The results show that most of the problems identified are due to poor data management processes and the practice of having data in silos. Overcoming this challenge requires the adoption of big data approaches for resource management to allow the integration of large and different forms of data. Originality/value This study seeks to bring to the fore challenges faced in resource management by the UK construction industry and to outline some solutions to address them.


2015 ◽  
Vol 33 (1) ◽  
pp. 73-87 ◽  
Author(s):  
Anthony Higham ◽  
Chris Fortune ◽  
Howard James

Purpose – The purpose of this paper is to establish the extent to which life cycle costing (LCC) is used as an early stage project evaluation tool by practitioners in the UK construction industry. The use of this evaluation tool has long been advocated by academics as a means of ensuring best value rather than lowest cost is a driver for business decisions related to potential built environment projects. Therefore there is a need to appraise its current uptake levels amongst built environment professionals and assess whether there are any barriers affecting its use in UK practice. Design/methodology/approach – Using a mixed methods approach, the authors present the findings from a survey of construction professionals located in the UK and the results from a series of follow up semi-structured interviews designed to further explore the factors found to affect the use of LCC in practice. Findings – The study shows that LCC is still not widely used by built environment professionals in the UK. The greatest inhibitor on the take up of the tool is the need of clients to budget on short-term horizons. Other factors such as a lack awareness of the tool by practitioners and clients, unreliability of data into the long term and the overriding need for commercially driven projects to achieve maximum return on investment continue to inhibit the widespread adoption of LCC as an early stage project evaluation tool. These findings have implications for the capability of the UK construction industry to deliver on its commitment to enhance the sustainability of the built environment. Originality/value – The paper offers insights into the current use of LCC and the factors affecting its use in the UK.


2014 ◽  
Vol 12 (1) ◽  
pp. 53-70 ◽  
Author(s):  
Nirodha Gayani Fernando ◽  
Dilanthi Amaratunga ◽  
Richard Haigh

Purpose – This paper aims to explore and investigate the career success of professional women in the UK construction industry. Design/methodology/approach – The aim of the research was set following the literature review and synthesis, after which a multiple case study approach is adopted to conduct exploratory case studies among professional women in the UK construction industry. A mixed method design was used for data collection, whereby qualitative data were collected in the first study and quantitative data were collected in the second study. The researcher adopted this sequence in order to gather qualitative data and analysis of a relatively unexplored area of career success factors of professional women in the UK construction industry. The results from the qualitative method were used, along with a relevant literature review, to develop the focus and questions in the quantitative phase of the study. The individuals in the first stage of data collection were not the same participants as those in the second stage, because the purpose of the quantitative study was to generalise the results to a population. Findings – The results indicated that soft skills are very important for career success, while hard skills are essential thereafter for professional women in the UK construction industry. Accordingly, it is necessary to develop soft skills in order to advance the women's professional careers. Further, the results indicated that age and gender are the least important career success factors for women in construction. The ability to work with people, taking opportunities, confidence, adaptability, communication skills, dedication, competence, focus, supportive line management, integrity, leadership skills, ability to bring teams together, good mix of skills, honesty, networking, intelligence and logically approaching business problems identified as the critical career success factors. Research limitations/implications – The construction industry is limited to organisations that construct buildings and infrastructure, and those involved in property development. These organisations comprise client, contractor and consultancy organisations. Practical implications – The findings of the paper are useful to human resource development managers to understand and improve organisational training and development plans, which help to advance the career of professional women. By doing so, organisations could recruit and retain more professional women in the construction industry. Therefore, recruiting and retaining more professional women in the organisation helps to enhance productivity in the industry and to enhance their health and well being in society at large. Originality/value – The value of this paper is twofold. First, this study contributes to fill the knowledge gap in career success factors of professional women in the UK construction industry. Second, this empirical research will have implications in the identification of different training and development activities to advance the careers of women in the UK construction industry.


2014 ◽  
Vol 4 (1) ◽  
pp. 90-107 ◽  
Author(s):  
Alex Opoku ◽  
Vian Ahmed

Purpose – Adopting sustainable construction practices minimizes the overall environmental impact of the built asset throughout its whole life. Currently, there is demand from key stakeholders in the construction industry for organization to deliver sustainable built environment, however, leaders/champions within construction organizations charged with the adoption of sustainable construction practices face many challenges. The purpose of this paper is to present the results of an investigation into the challenges facing intra-organizational leaders charged with the promotion of sustainable construction practices. Design/methodology/approach – Qualitative data were collected through semi-structured interview with 15 leaders, followed by an industry-wide survey of 200 intra-organizational leaders in contractor and consultant organizations in the UK construction industry. Findings – The results revealed that increased capital cost is the most significant challenge facing construction organizations in attempt to adopt sustainability practices in the delivery of construction projects. Originality/value – This study provides the empirical evidence linking leadership within construction organizations and sustainability; filling the gap in literature and serving as a source of reference material for higher education programmes in the built environment.


2020 ◽  
Vol 18 (6) ◽  
pp. 1691-1709
Author(s):  
Emmanuel Nsiah Ankomah ◽  
Joshua Ayarkwa ◽  
Kofi Agyekum

Purpose The purpose of this study is to ascertain the extent to which the practices of small and medium building contractors (SMBCs) conform to lean construction (LC) principles. Ultimately, practical results encourage a discourse on the true potentials and challenges to the holistic uptake of LC principles in the Ghanaian construction industry. Design/methodology/approach This research is based on a qualitative case study approach. The data was obtained through face-to-face structured interviews. Findings Across the cases, it was realized that there is a low-level application of LC principles among SMBCs. There was no indication that lean concepts were used on a company-wide basis in the Ghanaian construction industry. Furthermore, the study revealed that the traditional wasteful approach to managing construction projects was still prevalent among the firms. Practical implications This paper uses the 4P model as a foundation for assessing the extent to which the practices of SMBCs conform to LC principles. Practically, the study also created a certain level of awareness among the SMBCs about LC, LC principles and the benefits of the application of these principles within organizations. Originality/value This study contributes to the body of knowledge as it uncovers the status of LC implementation among SMBCs in the Ghanaian construction industry. The findings that are presented in this paper can be used as a starting point to disseminate the research and practice of LC among SMBCs.


2018 ◽  
Vol 16 (1) ◽  
pp. 87-100 ◽  
Author(s):  
Julius Akotia ◽  
Alex Opoku

Purpose The purpose of this paper is to explore the key practitioners’ level of involvement in the delivery of sustainable regeneration projects in the UK. Practitioners’ level of involvement is a major factor that has and continues to determine the delivery of sustainability outcomes of regeneration projects. Design/methodology/approach The paper adopted a qualitative study that obtained data from 21 key practitioners through semi-structured interviews in exploring practitioners’ level of involvement in the delivery of sustainable regeneration projects in the UK. The semi-structured interviews are conducted with seven practitioners, each from the three construction organisations selected through a purposive sampling approach for the study. Findings The findings identify varied levels of involvement of the key practitioners at the three delivery stages – early, construction and post-construction of the projects. The findings further reveal that clients’ representatives, commercial managers and architects are the most frequently involved practitioners during the early stages of the projects. The findings also indicate that practitioners who have sustainability assigned to their roles and their responsibilities, such as sustainability managers, are the least involved in all the three delivery stages of the projects. Research limitations/implications The study involves interview with 21 practitioners from three organisations delivering sustainable regeneration projects; hence, this could limit the generalisation of the research findings. However, the findings of this study could serve as a useful source of information for the further study in this area. Practical implications The paper is of the view that the level of key practitioners’ involvement in the delivery of the projects will have an impact on their knowledge and will determine how sustainability benefits are promoted and delivered from the projects. Originality/value Although some studies have been carried out on practitioners’ engagement in the delivery of “normal” construction projects, none has focussed on practitioners’ levels of involvement in sustainable regeneration projects. Hence, this study has brought to the fore how the key practitioners tasked with the responsibilities of delivering sustainability benefits of regeneration projects have been involved (at various levels of the project life cycle) in the delivery of these projects.


2017 ◽  
Vol 22 (3) ◽  
pp. 322-338 ◽  
Author(s):  
Rachel Griffiths ◽  
Wayne Lord ◽  
Jeremy Coggins

Purpose The purpose of this study is to identify building contractors’ views as to the need for, impact of and barriers to the use of project bank accounts (PBAs) in the UK construction industry. Design/methodology/approach A cross-sectional research study was carried out by the use of questionnaires to collect quantitative data. The population for the research was of construction professionals working as full-time employees for either main (Tier 1) or specialist contractors (Tiers 2-4). Findings Contractors consider PBAs as an effective initiative to encourage fair payment. There is uncertainty, however, as to whether PBAs will result in project cost savings. Head contractor resistance is perceived to be the biggest barrier to the use of PBAs. Adoption of PBAs in private-sector construction projects is likely to be slow. Research limitations/implications The relative infancy of PBA usage in the construction industry means that responses are largely based on awareness as opposed to experience. Nevertheless, survey data represent a snapshot of contractors’ perceptions with respect to PBAs, which may be used as a benchmark against which to compare future studies to monitor how contractors’ views and expectations have changed with time. Originality/value The survey results will be of particular interest to those international jurisdictions who are considering, or who have already embarked on, the path of trialling and/or using PBAs in the public sector.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Ramin Asadi ◽  
Suzanne Wilkinson ◽  
James Olabode Bamidele Rotimi

Purpose The high rate of rework that occurs in construction projects has a negative effect on the performance of the construction projects. Although several mechanisms have been implemented to control reworking, a comprehensive list of rework causes is yet to be provided to present the common causes that contribute to rework in construction contracts. This paper aims to investigate the most common rework causes that need to be addressed in construction contracts. Design/methodology/approach A mixed-method using both the qualitative and quantitative approach is used in this paper. First of all, the study adopted a four-step literature review to introduce the rework research trends and provide statistical reports using descriptive analysis. Next, a comprehensive review has been completed using content analysis to identify the common causes of rework in construction projects. Finally, the common causes in construction contracts are further investigated through a quantitative questionnaire survey to validate the initial results. Findings The results of the review showed an increasing trend of publications on rework over the last three decades. Most of the studies were conducted in Australia, the UK, Nigeria and Hong Kong. Based on further investigation in the study area of sources of rework, 37 causes of rework causes were identified and classified in five groups. Then, the most significant causes of rework in construction contracts were compiled in the list of 22 items. Research limitations/implications The paper’s reported result, contributes to the contract management body of knowledge by proposing a list of common rework causes that can be used by practitioners during the contract negotiation to prevent contractual issues. The result of the review can also be used for further investigation of the relationship between rework and contract conditions. Originality/value The proposed list of common causes of rework in construction contracts allows project parties to improve the terms of the contract in addressing rework, this could result in fewer contractual claims and disputes. The findings of this study will also guide the investigations into the contract conditions, thus the approach used is constructive.


Sign in / Sign up

Export Citation Format

Share Document