Post-conflict reconstruction – a case study in Kosovo

2015 ◽  
Vol 4 (1) ◽  
pp. 103-128 ◽  
Author(s):  
James Earnest

Purpose – Rehabilitation and reconstruction of social and economic infrastructure in a post-conflict environment are complex, long-debated issues in development cooperation. In addition to war creating large-scale human suffering, generating refugees, displacing populations, engendering psychological distress, obliterating infrastructure and transforming the economy, in post-conflict situations, deepening chaos and disorder can be found at the highest social, economic and political levels; serious developmental challenges remain insufficiently addressed. Repairing war-damaged infrastructure in order to reactivate the local economy is a challenge for all post-conflict countries. The paper aims to discuss these issues. Design/methodology/approach – The study was designed to examine planning and execution of post-conflict reconstruction (PCR). The use of a mixed-method research approach combining both quantitative and qualitative data collection was used to explore planning and implementation of PCR infrastructure projects in Kosovo. The data collection in the field was undertaken for a period of eight weeks, from July to September 2008. A total of 420 respondents were involved in the study process, as follows: key informants (four), pilot test (12), semi-structured interviews (36), project manager/engineers survey (231), chief of mission/country director survey (117), and focus group (20). To meet the needs of the society and recognise the required functional components of project management, the overall contexts of managing projects in a post-conflict environment have been discussed in the study. Findings – Planning and implementing reconstruction projects in areas affected by conflict have proven to be far more challenging than expected and responses by practitioners, aid agencies, and government regarded as inadequate. The changing political, economic, and social factors in Kosovo after the war in 1999 have had a significant influence on the limited adoption of a project management methodology in development and reconstruction projects. The findings from the exploratory study were aimed at improving understanding of the planning, pre-designing, and implementation of infrastructure projects. The findings indicated a need to promote a better understanding of how projects are undertaken at all levels of the organisation, and to describe processes, procedures, and tools used for the actual application of projects. The findings of the study identified a poor quality of planning and implementation of reconstruction projects in an environment of complexity, change, and uncertainty. The study also raised some very significant findings for a broader approach to community involvement in project identification, planning, and implementation. Infrastructure projects implemented in Kosovo were used to develop a conceptual framework for designing projects and programmes more likely to yield positive outcomes for post-conflict society. Originality/value – The study was done by the researcher in Kosovo.

2014 ◽  
Vol 69 (3) ◽  
pp. 216-228 ◽  
Author(s):  
Ulrike Pröbstl-Haider ◽  
Verena Melzer ◽  
Alexandra Jiricka

Purpose This paper aims to address lack in destination leadership and to propose a new typology of approaches. Frequently, rural tourism is suggested as a remedy that should enhance the local economy, create new jobs, strengthen the regional identity and finance the infrastructure. Design/methodology/approach Case study analysis shows that regions, communities, tourism organizations and managers use different strategies to strengthen their tourism offers or to develop new ones. The paper analyzes different development approaches among destinations and discusses their respective leadership structure. Findings The typology of tourism development models makes the different development options transparent and easy to understand. This may aid a community to support tourism development with spatial planning and avoid conflicts with other forms of land uses. Overall, leadership for rural tourism development should lead to a strategic cooperation between tourism businesses and other organizations based on a commitment to destination coherence. Research limitations/implications The chosen research approach is based on the analysis of Central European case studies. Therefore, researchers of other geographical backgrounds are encouraged to test the proposed propositions further. Practical implications The presented typology illustrated four distinct options of coherent development strategies, which can support communities/regions to find a long-term decision frame. Originality/value The presented typology facilitates collaborative planning, helps operationalize rural tourism development policies and provides the foundation for spatial planning, all of which furthers the linkages between tourism and other sectors in the rural economy.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Imranul Hoque

PurposeThis study aims to investigate how buyer-assisted lean intervention in garment supplier factories affects garment suppliers' productivity and production capability development.Design/methodology/approachEmploying a qualitative research approach and a lean intervention design, a multiple case study method was adopted for this study. Quantitative data on productivity performance and qualitative data on production capability development were collected from a Danish buyer and their four corresponding garment suppliers. Collected data were analysed using standard lean measurement tools and qualitative data analysis techniques.FindingsThis study demonstrates that buyer-assisted lean intervention is a useful strategy for garment suppliers to enhance their productivity and production capability. However, suppliers need to select the right lean tools, ensure seriousness and commitment to lean initiatives, substantial involvement of top management and workers, arrange formal and informal training, provide performance-based financial/non-financial incentives and nurture a learning culture to facilitate suppliers' production capability development.Research limitations/implicationsThis study implemented few lean tools in a single sewing line in four supplier factories for a short intervention duration. Thus, there is a scope for future studies to investigate the impact of the lean intervention on a large scale.Practical implicationsThe findings of this study might bring new insights to the management of buyer and supplier firms concerning how buyers could involve in suppliers' lean intervention initiatives and what suppliers need to ensure to develop production capability.Originality/valueFor the first time, this study engaged a buyer in suppliers' lean intervention initiatives to improve productivity and production capability in the garment industry of a developing country.


2016 ◽  
Vol 8 (2) ◽  
pp. 113-132 ◽  
Author(s):  
Soroush Maghsoudi ◽  
Colin Duffield ◽  
David Wilson

Purpose Unlike manufacturing and research and developments, major infrastructure projects rarely emphasize or drive their objectives on the basis of innovation. This is in part because of a risk-averse culture, yet conceivably great benefits and opportunities are being lost because of this behavior. Design/methodology/approach The case for focusing on innovation in infrastructure projects is that the reasons driving innovation are not fully understood, and this impedes the effective implementation of lessons learned for the numerous innovative projects into practice more generally. The purpose of this study was to discover how innovation is produced and captured in major infrastructure projects in Australia and to understand how innovation may be replicated for future projects through refinement of design, project management, finance and procurement. Findings Engineering and project managers may find this paper helpful to better understand how innovation might happen in infrastructure projects and what different forms it can take. Originality/value The findings of this study demonstrate that people and culture drive consistent successful infrastructure outcomes more than simply the development of new products or processes.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Nyamagere Gladys Sospeter ◽  
Pantaleo D. Rwelamila ◽  
Joaquim J. Gimbi

PurposeThis study develops a conceptual framework appropriate for managing Post-Disaster Reconstruction Projects (PDRPs) so as to avoid cost and time overruns in Angola.Design/methodology/approachAn explanatory sequential mixed research approach was used. Data was collected from project participants within the ministry of planning, the provincial government office of planning and the local government in Angola. A questionnaire with closed questions was completed by 130 survey respondents. Semi-structured focus group interviews were conducted with seven participants selected through purposive sampling. Descriptive statistics, t-test and content analysis were used to analyse quantitative and qualitative data, respectively.FindingsThe study indicates that there is presently no formal project management process. Neither have government project management standards been developed and broadcast. This results in ad hoc processes being mostly used for managing PDRPs. The study further presents disaster preparation programme, community engagement, resources and stakeholder's engagement, post-disaster procurement policies, financial guides, post-disaster recovery legislation, context-specific (social economic, demographic, political and cultural variables), programme preparation as essential components to be considered for developing an appropriate framework for managing PDRPs.Research limitations/implicationsThe study is limited by its geographical settings which focussed the results on one province in Angola. However, the findings can be useful for other countries wishing to gain insights on the framework with “overlooked components” for managing DPRPs in emerging countries with similar disaster environment, government policies and same business environment.Practical implicationsThe framework for managing PDRPs may positively impact project realization, hence minimization of time and cost overruns. The findings are vital for managers, local practitioners and policy/decision-makers in emerging countries of essential components and lessons useful for managing PDRPs and making decisions when they intend to participate in such projects. An understanding of which approaches are critical and essential components of the framework serves as a basis for improving project delivery. Future research studies should describe its practical application.Originality/valueThe study provides insights by identifying an ordered grouped set of project management models/approaches mostly applicable for managing PDRPs in Angola, better understanding of appropriate components/variables to be considered and develops a conceptual framework for managing PDRPs in emerging countries, post-war context.


2019 ◽  
Vol 13 (2) ◽  
pp. 317-330
Author(s):  
Ghassan Elkahlout

Purpose The purpose of this paper is to study the feasibility of using the agency-driven housing approach in a post-conflict context. This paper aims to identify the challenges in applying the agency-driven approach within the context of post-conflict housing reconstruction in the Gaza Strip. Design/methodology/approach In this paper, a qualitative research approach was adopted. Semi-structured interviews were conducted with key stakeholders and representatives of project beneficiaries. Secondary data drawn from academic papers, articles, technical reports and media reports were also obtained. Findings The findings support doubts in the literature about the feasibility of using the agency-driven approach in post-conflict housing reconstruction. The paper concludes that an agency-driven housing project successfully constructed a few thousand housing units and provided thousands of temporary job opportunities. The project encountered challenges in beneficiary selection; affordability of housing units; access to building materials; governance issues; and delays in implementation. Practical implications This paper offers valuable lessons for decision-makers, planners and architects to build on in future endeavours in Gaza and in similar contexts. Originality/value This paper particularly confirms the challenges of using the agency-driven housing approach in a post-conflict setting. These findings are useful for policy-makers to develop relevant strategies to address housing needs in the Gaza Strip.


2016 ◽  
Vol 9 (4) ◽  
pp. 716-743 ◽  
Author(s):  
Derek Walker ◽  
Beverley Lloyd-Walker

Purpose The purpose of this paper is to explore the extent of the continuing influence on project management (PM) research directions of rethinking project management over the last ten years. Design/methodology/approach The authors chose a qualitative research approach that involved reading all papers published in the International Journal of Managing Project in Business since its commencement in 2008. Content analysis was performed on these papers to allow axial coding of key article content influence themes. Findings The research identified the strength, over time, of the three research interest clusters on the PM research agenda and resultant changes in the PM paradigm. The five directions put forward by the rethinking PM agenda and other researchers ten years ago have continued to influence the PM research agenda. Originality/value Findings provide a better understanding the changes in PM research directions since rethinking PM, the increased breadth and sophistication of PM research in general, and future research directions.


2019 ◽  
Vol 34 (2) ◽  
pp. 291-302 ◽  
Author(s):  
Mathew S. Isaac ◽  
Ajay T. Abraham ◽  
Elaine Y. Richards

Purpose The purpose of this paper is to review the recent implementation of the Challenger Sales Model (CSM) at Cars.com, an online automotive marketplace that generated $633m in sales in 2016 with a sales force of over 500 representatives, and to identify insights related to the implementation that may be relevant to sales researchers and other organizations considering similar implementations. A more specific aim is to determine whether establishing “constructive tension” between salespeople and their customers, which is a key tenet of the CSM, was perceived as a source of value for Cars.com. Design/methodology/approach The case study is based primarily on in-depth interviews with 15 employees spanning different sales and/or training responsibilities in the organization, from the current CEO (previously the former Senior Vice President of Sales) to sales representatives from different sales teams. Findings Five major insights emerged from this research: (1) Because it represents a change in the established norms governing interpersonal dynamics, constructive tension is often more difficult for salespeople to foster when interacting with existing (vs prospective) customers. (2) Whereas leading with insights is more difficult when interacting with prospective (vs existing) customers, sustaining meaningful insights over time is a major challenge when dealing with existing customers. (3 )Products that are more transactional or price-driven are ineffective at creating constructive tension and incompatible with the CSM. (4) Creating value from constructive tension requires the entire sales organization to share a common vision of what it means to be a Challenger and to adopt consistent nomenclature and formal programs for training and coaching. (5) Even more than other consultative sales models, the successful implementation of the CSM demands company-wide integration and makes it untenable for most indirect sales teams. Originality/value Although prior academic research has offered critiques of the CSM, the present paper is one of the first to use a discovery-oriented, qualitative research approach to provide a retrospective look at the actual implementation of the CSM within an organization. This approach results in novel insights, such as the identification of conditions when high-pressure versus low-pressure selling techniques are likely to be more successful, that may be of interest to sales researchers and to other companies considering a large-scale implementation of the CSM or related sales methodologies.


2020 ◽  
Vol 22 (1) ◽  
pp. 111-132
Author(s):  
Iman Sudirman ◽  
Joko Siswanto ◽  
Atya Nur Aisha

Purpose This study aims to identify the competencies of small- and medium-sized enterprises’ (SMEs) entrepreneurs in the software sector and the perceived level of attainment in each competency. It also examines whether these competencies and their levels affect business turnover and growth (in terms of business scale and duration). Design/methodology/approach To accomplish this purpose, the study took a quantitative approach, involving a survey of 33 SME entrepreneurs, which was then processed using statistical tests, including chi-square test, Kruskal–Wallis test and ordinal regression. Findings There were four findings of the study. Firstly, software SME entrepreneurs need 17 competencies, with high levels of soft competencies being required and average levels of technical competencies. Secondly, there are significant differences in perceived levels of customer service orientation (p = 0.089) depending on the scale of the business and in perceived levels of project management (p = 0.087) depending on the duration of the business. Thirdly, customer service orientation (p = 0.031) and project management (p = 0.01) both have a significant influence on business revenues. Fourthly, there were significant gaps in perceived levels of competency (p < 0.05) in achievement orientation, customer service orientation and project management. Originality/value There is existing research that conducts competency mappings at the managerial level in large-scale organizations; however, this sort of research in relation to SME entrepreneurs is still lacking. The present study seeks to fill this gap. It also maps integrated entrepreneurial competencies, including soft and technical competencies; a focus that is lacking in previous studies.


Subject Regional infrastructure ambitions. Significance Plans for large-scale regional infrastructure projects have become vehicles for economic cooperation in East Africa over the past several years. However, behind the rhetoric of regional solidarity, such ventures have become a critical arena for power rivalries to play out. Impacts Infrastructure plans are exacerbating local conflicts in northern Kenya and driving new dynamics. Land grabbing is a trend across areas where new infrastructure is meant to be, tying political and business elites to original plans. Despite its ambitions to reduce reliance on Khartoum, South Sudan is not going to be a secure infrastructure partner for some time.


Significance The win secures Conde a second five-year term. However, opposition parties allege widespread fraud. They refuse to recognise the result and threaten large-scale protests. Impacts New Ebola cases will set back the country's eradication timeline, possibly pushing the crisis into a third year. Mining firms could cite this as a reason further to delay infrastructure projects while they await better commodity prices. News that Ebola persists in semen for up to nine months means men could be carriers even after they are proclaimed cured. The state is likely to increase its use of traditional healers to treat Ebola -- to help overcome primary healthcare deficits.


Sign in / Sign up

Export Citation Format

Share Document