Development of complexity management strategies for construction projects

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Sharareh Kermanshachi ◽  
Thahomina Jahan Nipa ◽  
Bac Dao

Purpose The purpose of this study is to ascertain and list the most effective management strategies in efficiently handling the project complexities to enhance the performance of the project. Design/methodology/approach To fulfill the aim of this study, a comprehensive literature review was conducted, and the qualitative Delphi technique in two rounds was applied. Participants of the Delphi technique consisted of 12 subject matter experts (SMEs) with cumulative experience of 250 years in working in construction projects. In the first round of the Delphi technique, SMEs were asked to provide complexity management strategies to address the complexities due to 37 complexity indicators (CIs) under 11 complexity categories. In the second round of the Delphi technique, SMEs identified the top three management strategies for each of the 37 CIs. Findings This study collected the outcome of the two-round Delphi technique and based on the output developed the list of strategies to manage complexities related to each indicator. For example, establishing a well-informed governance team, assigning a Project Manager (PM) when the number of projects is more than one in an organization, and assigning a PM efficient enough to communicate with higher authority effectively will help in managing complexity that arises due to faulty assessment of the influence of a project on the organization’s overall success. Originality/value This study will help practitioners in effectively managing the project complexities, and thus will reduce the monetary loss associated with project complexities.

2014 ◽  
Vol 3 (2) ◽  
pp. 179-192 ◽  
Author(s):  
Holly Elisabeth Carter ◽  
John Drury ◽  
G. James Rubin ◽  
Richard Williams ◽  
Richard Amlôt

Purpose – There is an assumption in emergency planning that the public will “panic” or refuse to comply in the event of mass decontamination. This assumption has serious implications for how the public will be managed. The paper aims to discuss these issues. Design/methodology/approach – The authors carried out semi-structured interviews with 13 emergency responders, six of whom had experience of incidents involving decontamination. The authors asked them, first, about their experiences of these events and, second, about their expectations for decontamination involving a large crowd. The aim was to explore the extent to which responders perceived non-compliance and anxiety as (crowd) problems during decontamination, and if so, how they felt that they could be addressed. Findings – Responders with experience of decontamination perceived non-compliance and excessive anxiety to be rare, and suggested that orderly behaviour was more common. However, the majority of emergency responders with no experience of decontamination said they expected panic and non-compliance. They therefore emphasised the importance of “controlling”, rather than communicating with, the public. Research limitations/implications – The authors argue that “control”-based emergency management strategies can impact negatively on the relationship between the public and responders, and hence hinder effective management of an incident. It would therefore be beneficial to provide training for emergency responders on likely public behaviour during incidents involving decontamination. Originality/value – This research extends previous research by facilitating a detailed understanding of emergency responders’ experiences and perceptions of managing incidents involving decontamination, and showing how these experiences and perceptions can affect the way in which such incidents are managed.


2014 ◽  
Vol 27 (3) ◽  
pp. 426-464 ◽  
Author(s):  
Fábio Frezatti ◽  
David B. Carter ◽  
Marcelo F.G. Barroso

Purpose – An effective management accounting information system (MAIS), as well as the accounting discourse related to it, can support, facilitate, enable, and constrain diverse business discourses. This paper aims to examine the discursive and organisational effects of an organisation accounting upon absent accounting artefacts, i.e. accounting without accounting. Situated within the discursive literature, this paper examines the construction of competing articulations of the organisation by focusing on what accounting does or does not do within an organisation. In particular, the paper acknowledges the fundamental importance of the accounting discourse in supporting, facilitating, enabling, and constraining competing organisational discourses, as it illustrates how the absence of accounting centralises power within the organisation. Design/methodology/approach – From a rhetorical, discursive perspective, the authors develop an in-depth qualitative case study in a manufacturing organisation where MAIS has been abandoned for approximately two years. Interpretive research approaches, from a post-structural perspective, provided the base for the structure of the research. The authors studied how other organisational discourses (such as entrepreneurship and growth), which are traditionally constructed with reference to accounting and other artefacts, continued to be produced and sustained. The non-use and non-availability of management accounting information created a vacuum that needed to be filled. The lack of discursive counterpoints and counter-evidence provided by MAIS created a vacuum of information, allowing powerful, proxy discourses to prevail in the organisation, increasing risks to business management. Findings – The absence of MAIS to support an accounting discourse requires that contingent discourses “fill in the discursive gap”. Despite appearances, they are no substitute for the accounting discourse. Thus, over time, the entrepreneurial, growth and partners' discourses lose credibility, without the corresponding use of management accounting information and its associated discourse. Originality/value – There are at least two main contributions from the case study and the findings presented in this paper: first, they provide a new perspective for studying MAIS, as a specific organisational discourse among other discourses that shape people relationship within the organisation as an examination of accounting without accounting. Second, this discussion reinforces the relevance of accounting discourse for other organisational discourses, supporting, facilitating, enabling, and constraining them, by demonstrating the effects of its absence.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Vivek Roy

PurposeSupply chain traceability and supply chain visibility have become a critical element for the effective management of contemporary complex supply chains. At their core is information sharing, which has been acknowledged as a key prerequisite for logistics and supply chain performance, but whose notional underpinnings have not been delineated fully, leading to interchangeable deployment of these terms. Addressing the shortcoming, this paper aims to establish a contrast between the two notions.Design/methodology/approachDrawing from systematic review protocols, a multi-disciplinary review scope is constructed wherein the synthesis is strategized to primarily channel implications for the scholarship of logistics and supply chain management. The review is aimed at addressing two research objectives: (1) how the notions of traceability and visibility in supply chain management develop contrast in terms of their thematic emphasis and (2) to attain an integrative understanding of the notional convergence and divergence between supply chain traceability and visibility for raising strategic recommendations.FindingsThe review outcomes help contrast both the convergence and the divergence between traceability and visibility in the supply chain environment, and the differentiated but fundamental role that information sharing plays within these notions to outline why they are not interchangeable.Originality/valueThe originality of the findings lies in the conceptual synthesis of the relevant literature from both technological and non-technological perspectives to ultimately draw logistics and supply chain management implications. The review also points out key strategic considerations to demarcate the notional boundaries of traceability and visibility in future research.


Facilities ◽  
2015 ◽  
Vol 33 (5/6) ◽  
pp. 412-423
Author(s):  
Bert Smit ◽  
Roy C. Wood

Purpose – This paper aims to develop an understanding of the potential for application of facilities management concepts and principles in the context of the “zoo sector”. Design/methodology/approach – The paper is a conceptual one and begins with a narrative designed to provide sufficient background to understanding key issues relevant to the practice of facilities management in zoological and similar institutions, including the implications of conservational/scientific and display imperatives of zoological facilities for facilities management. We then consider how these issues can be worked through in the context of four broad dimensions of facilities management: strategies for the management of stakeholder behaviour (non-human animals, personnel and visitors); building and environmental design (including space usage); safety, security and health; and “miscellaneous” services. The paper concludes by providing a provisional framework for further research into facilities management in the zoo sector. Findings – As a conceptual paper, there are no empirical findings. Conceptually, the paper offers an initial and simple framework for interpreting the possible application of facilities management in zoological and related facilities. Originality/value – In a search of the two principal journals in the field of facilities management, nothing could be found of direct relevance to the management of facilities in zoological and similar organizations. This paper is thus a singular contribution to the field. Conceptually, the authors attribute neglect of the topic to the distinctive traditions in the study of facilities management, which, at the risk of caricature, emphasise either the pre-eminence of a building and building services approach to facilities management, or an approach which is almost exclusively focused on the “human” dimensions to the discipline.


2018 ◽  
Vol 25 (6) ◽  
pp. 707-720 ◽  
Author(s):  
Ayodeji Emmanuel Oke

Purpose The ability of construction contractors to engage in construction bond agreement with guarantors depends on capital, experience, capacity and continuity. Using these criteria, the purpose of this paper is to provide insights into the bonding capacity of Nigerian contractors. Design/methodology/approach Factors required for bonding were examined based on a set of questions addressed to managers of contracting firms and personnel involved in issuing bonds and guarantees in commercial banks and insurance companies. The scorecard approach was employed to determine the bonding capability of the contractors. Findings Contractors’ financial strength and past performance on previous projects are the two important factors considered by guarantors in granting bond to contractors. However, the condition surrounding the bond, the legal capacity of the guarantor to issue bond and the identity of the guarantor are mostly considered by contractors in approaching a potential guarantor. Using the scorecard approach, about one-third of contractors have the necessary requirements to engage in construction bond agreement with guarantors. This ability of contractors is affected by years of experience of the firm but not by their location nor years of experience of their manager. Practical implications It is necessary for contracting firms to increase their capital base through merging, borrowing, etc., and also engage experienced professionals and workers in the execution of construction projects, as this will eventually improve their bonding ability. Social implications The study is limited to construction contractors registered with Ondo and Lagos State Governments and guarantors that are banks and insurance companies in Nigeria. Originality/value The paper specified various areas of concerns for Nigerian contracting firms in their bid to enhance their bonding ability. This will help them in overcoming various challenges and bottlenecks that may arise in securing bonds and guarantees from guarantors.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Guangchong Chen ◽  
Jiayu Chen ◽  
Yuchun Tang ◽  
Yan Ning ◽  
Qiming Li

PurposeCollaboration is essential to BIM-enabled construction projects (BECPs). To facilitate collaboration, various strategies have been proposed. Usually, project team adopts single collaboration strategy for convenience. However, BIM-based collaboration is rather dynamic and exposed to a lot of barriers and risks, which easily changes collaboration conditions among partners. Therefore, better understanding of collaboration conditions in BECPs is crucial to develop flexible and suitable strategies. To fill in the gap, this study intends to identify typical collaboration profiles in BECPs and develop a profile-oriented strategy selection framework.Design/methodology/approachThis study establishes a six-dimensional collaborative behavior matric based on a comprehensive literature review to profile collaboration. Then a questionnaire survey is conducted to collect the collaboration data from 162 BECPs in China. Finally, latent profile analysis (LPA) is utilized to identify the typical collaboration profiles in BECPs.FindingsThrough LPA, four profiles are identified, including restricted collaboration profile, smarmy collaboration profile, intuitive collaboration profile, and modest collaboration profile. A profile-oriented strategy selection framework is also established to match strategies with collaboration profiles. Two major categories of strategies are proposed to promote these collaboration profiles including trust building and elevating strategies and collaborative behaviors facilitating strategies.Research limitations/implicationsThese identified profiles can provide an insightful understanding on the diversified collaboration conditions in BECPs.Practical implicationsThe profile-oriented strategy selection framework will help managers develop strategies flexibly to promote collaboration in BECPs.Originality/valueThis study validates four typical collaboration profiles in BECPs. Moreover, a profile-oriented strategy selection framework is also established for collaboration facilitation in BECPs.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Chipozya Kosta Tembo ◽  
Franco Muleya ◽  
Emmanuellie Phiri

PurposeThis research aimed to investigate the extent to which organisational culture is practised in local and foreign contractors in grade one and two categories and how it affects their performance.Design/methodology/approachThe approach for this research was positivist in nature adopting a mono-method of data collection through a survey using self-administered questionnaires. A total of 138 questionnaires were distributed among public clients and large-scale contractors registered in the stated grades, and 112 questionnaires were returned for analysis representing an overall response rate of 81% for contractors and clients.FindingsFindings revealed that in organisational culture, significant differences were found for management style and dominant characteristics of the organisation between local and foreign contractors. Differences were not found for leadership styles, measures of success and organisational glue. Results suggest that for local contractors to perform better, significant changes are needed to their management style and dominant characteristics of their organisations.Originality/valueForeign contractors in the Zambian construction industry are reportedly outperforming local contractors making them preferred contractors on larger public projects accounting for 85% of construction projects by value of works. This study presents the differences in organisational culture between foreign and local firms. It further demonstrates that organisational culture plays a key role in determining performance of a contracting firm. The study presents areas that local contractors can improve in organisational culture in order to remain competitive.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Jae-Seob Lee

PurposeThe purpose of the paper is to develop a method to integrate the schedule-based analysis with a productivity-based analysis to prove and support the result of the damages calculation.Design/methodology/approachIn this paper, a “cost and schedule impact integration” (CSI2) model is proposed to objectively show and estimate lost productivity due to changes in construction projects.FindingsA schedule-based analysis to include separate tracking of change order costs can be used to predict productivity due to the delay and disruption; changes in construction projects almost always result in delay and disruption. However, the schedule-based analysis needs to be integrated with a productivity-based analysis to prove and support the result of the damages calculation.Practical implicationsThe results of this study expand upon construction practices for proving and quantifying lost productivity due to changes in construction projects.Originality/valueThe contribution of the paper is summarized as the introduction of a “schedule impact analysis” into a “cost impact analysis” technique to assess the damages, as well as to demonstrate the labor productivity impact due to delay and disruption in construction projects.


Author(s):  
Habeeb Kusimo ◽  
Lukumon Oyedele ◽  
Olugbenga Akinade ◽  
Ahmed Oyedele ◽  
Sofiat Abioye ◽  
...  

Purpose The purpose of this paper is to identify challenges faced in resource management in the UK construction industry and to propose some solutions to these problems. Design/methodology/approach Based on a qualitative research methodology, 14 experts from the UK construction industry were chosen to be participants in the study. The participants were equally divided into two focus groups to discuss resource management using five projects as case studies. Thematic analysis of the discussion reveals seven key factors that affect resource management. Findings The results show that most of the problems identified are due to poor data management processes and the practice of having data in silos. Overcoming this challenge requires the adoption of big data approaches for resource management to allow the integration of large and different forms of data. Originality/value This study seeks to bring to the fore challenges faced in resource management by the UK construction industry and to outline some solutions to address them.


2019 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Jeong-Yang Park ◽  
Yong Kyu Lew ◽  
Byung Il Park

Purpose The purpose of this paper is to answer why some multinational enterprises (MNEs) fail within the international business (IB) domain. Design/methodology/approach Conceptually, the study takes an organismic approach to MNE failure. Methodologically, it adopts an elite interview approach derived from the Delphi technique. Respondents are 39 IB and strategic management academics. Findings The paper finds that MNE failure is rooted in strategic leadership and capabilities (i.e. internal deterioration of organizational resources and strategies) and institutional pressures and differences, and these factors lead to deterioration of institutional legitimacy for an MNE. Originality/value The paper conducts a review of the firm failure and foreign divestment literature and undertakes an organismic approach to the analysis of MNE failure in the IB context. The paper provides useful insights on developing and implementing both market and non-market strategies for overcoming MNE internationalization failure.


Sign in / Sign up

Export Citation Format

Share Document