scholarly journals Blockchain-based BIM Digital Project Management Mechanism Research

IEEE Access ◽  
2021 ◽  
pp. 1-1
Author(s):  
Yanling Ni ◽  
Baolin Sun ◽  
Yucai Wang
2021 ◽  
pp. 292-297
Author(s):  
Wei Song ◽  
Lei Xue ◽  
Yao Wang ◽  
Jiwu Liu ◽  
Yuming Zheng ◽  
...  

2011 ◽  
Vol 361-363 ◽  
pp. 1589-1592
Author(s):  
Si Ling Yang ◽  
Ying Zong Liu ◽  
Hong Jiang Gao

As the nation pays more and more attention to ecological construction, the government investment in forestation projects increases every year. The project management of afforestation project with government investment is a complex systematic project which needs well coordinate of the relationship of various subjects to find a reasonable combination of every interest subjects by appropriate design of the system, so it is necessary to introduce reasonable project management mechanism. This paper points out the problems exist in the current project management of forestation project with government investment and analyses the reasons; then agent construction system is proposed to improve the management mechanism of the forestation project with government investment; finally, the advantages and disadvantages of the system were analyzed.


Author(s):  
Т. V. Yurieva

The development of the new economy in terms of strategic changes may be accompanied by the appearance the unstable and crisis situations. These can be effectively controlled through the use of crisis management mechanism and project management methods. This approach allows developing and implementing of anti-crisis strategy, to obtain the necessary economic results in conditions of limited parameters (resources, time, etc.).


2011 ◽  
Vol 280 ◽  
pp. 62-66
Author(s):  
Lian Bo Zhu ◽  
Wei Hao

China is one of the countries with the most amounts of new buildings in the world each year. The number of the construction waste has already accounted for 30% to 40% of the total city garbage. So it is necessary to study the construction waste treatments. There are many research results in recent years. These results can be divided into three parts, which are the policy studies, the management mechanism and the techniques of the construction waste treatments. The paper discusses and analyses them. Based these research results the paper gets the conclusion that three aspects should continue to be studied, which is the unified calculation formula of the construction waste quantity, the construction waste industrialization and the support and incentive mechanism research.


2014 ◽  
Vol 1030-1032 ◽  
pp. 2639-2642 ◽  
Author(s):  
Qian Fang Pei ◽  
Han Meng Zhang ◽  
Ya Kun Yang

As the market establishing and the project management mechanism for deepening reform , the project cost management is in a core position and playing increasingly important role in the project . Based on cost management analysis and relevant theories and methods, and it combined the content, features and current situation of cost management in substation project. The paper uses the method of PDACE process control theory and value engineering, it is applied to the cost management.of the substation project. This study played a major role on reducing the cost of construction project.


2009 ◽  
Vol 628-629 ◽  
pp. 19-24
Author(s):  
Li Gang Qu ◽  
Wei Wang ◽  
Da Wei Wu

The functional and structural models of networked collaborative design system based on project management are brought forward in this paper. Its typical workflow is defined according to the system architecture. In process of studying implementation mechanism of collaborative design system, the algorithm of Fuzzy Analytic Hierarchy Process (F-AHP) is employed in choosing partners as personnel management mechanism, the method of Design Structure Matrix (DSM) is applied in process of decomposing and assigning design tasks, and weight-coefficient recursively statistic algorithm is used in controlling task schedule. The archetypal system of networked collaborative design based on project management is developed and tested, realization supported “multi-user &multi-task” is drown the conclusion.


2012 ◽  
Vol 174-177 ◽  
pp. 2763-2767
Author(s):  
Xiao Long Gan ◽  
Shi Rong Li

Project stakeholders play an important role in the implementation process of sustainable construction. Due to different attributes of each stakeholder in the project, their importance level is different. This paper firstly identifies 13 project stakeholders based on Chinese construction project management mechanism and then a questionnaire survey was conducted to investigate their importance. This finding indicates that client and government play extremely important role in the sustainable construction; all the project stakeholders are important in the three aspects and the importance level order of project stakeholders in the three aspects is different.


Sign in / Sign up

Export Citation Format

Share Document