A Proactive Aging/Asset Management Model to Optimize Equipment Maintenance Resources Over Plant Lifetime

Author(s):  
Theodore A. Meyer ◽  
Robert K. Perdue ◽  
Joel Woodcock ◽  
G. Gary Elder

Experience has shown that proactive aging/asset management can best be defined as an ongoing process. Station goals directly supported by such a process include reducing Unplanned Capability Loss Factor and gaining the optimum value from maintenance and aging management budgets. An effective aging/asset management process must meet evolving and sometimes conflicting requirements for efficient and reliable nuclear power plant operation. The process should identify most likely contributors before they fail, and develop cost-effective contingencies. Current trends indicate the need for focused tools that give quantitative input to decision-making. Opposing goals, such as increasing availability while optimizing aging management budgets, must be balanced. Recognizing the importance of experience in reducing the uncertainty inherent in predicting equipment degradation rates, nuclear industry demographics suggest the need to capture existing expert knowledge in a usable form. The Proactive Aging/Asset Management Process has been developed to address these needs. The proactive approach is a process supported by tools. The process identifies goals and develops criteria — including safety, costs, and power production — that are used to prioritize systems and equipment across the plant. The process then draws upon tools to most effectively meet the plant’s goals. The Proactive Aging/Asset Management Model™ is one software-enabled tool designed for mathematical optimization. Results assist a plant in developing a plant-wide plan of aging management activities. This paper describes the proactive aging/asset management process and provides an overview of the methodology that has been incorporated in a model to perform a plant-wide optimization of aging management activities.

2022 ◽  
pp. 1-29
Author(s):  
Carlos A. Parra ◽  
Adolfo Crespo Márquez ◽  
Vicente González-Prida ◽  
Antonio Sola Rosique ◽  
Juan F. Gómez ◽  
...  

The chapter explains in detail the maintenance management model (MMM) taken as a reference for the development of the book. The chapter is based on the eight phases of the MMM. The first three blocks determine the effectiveness of the management; the following blocks assure the same efficiency and continuous improvement in the following way: Blocks 4 and 5 include actions for the planning and scheduling of maintenance, including, of course, the capacity of planning of department of maintenance. Blocks 6 and 7 are dedicated to the evaluation and control of the maintenance and the cost of assets throughout their life cycle. This chapter of introduction briefly summarizes the process and the reference frame necessary for the implementation of the MMM. This chapter also presents the relationship between the eight phases of the maintenance management model proposed and the general requirements of the asset management standard ISO 55000 to show how the gradual implementation of the MMM largely covers the requirements of the standard ISO 55000.


Author(s):  
Carlos Parra ◽  
Adolfo Crespo Márquez ◽  
Vicente González-Prida ◽  
Fredy A. Kristjanpoller ◽  
Pablo Viveros ◽  
...  

The purpose of this chapter, is to provide a Maintenance and Reliability Management Model for the project: Design and Construction of the Third Set of Locks in the Panama Canal, with the approach of the process of asset management optimization. A practical vision of the maintenance and reliability management process and framework is presented with the idea of: Structuring the maintenance management process by grouping management activities within a series of so-called management building blocks; Structuring the framework grouping techniques that can be used to support decisions to be taken within each of these building block. This chapter presents not only a process but also the framework and techniques to manage and improve maintenance and reliability effectiveness and efficiency. This report will be used to assist different plant teams to elaborate the optimal strategies for maintenance and inspection for the assets, specified for the project: Third Set of Locks in the Panama Canal.


Author(s):  
Jean-Jacques Grenouillet

Nowadays, decommissioning of nuclear power plants has become a key issue for nuclear industry in Europe. The phasing out of nuclear energy in Germany, Belgium and Sweden, as well as the early closure of nuclear units in applicant countries in the frame of EU enlargement, has largely contributed to consider decommissioning as the next challenge to face. The situation is slightly different in France where nuclear energy is still considered as a safe, cost-effective and environment friendly energy source. Electricite´ de France (EDF) is working on the development of a new generation of reactor to replace the existing one and erection of a new nuclear power plant could start in the next few years. Nevertheless, to achieve this objective, it will be necessary to get the support of political decision-makers and the acceptance of public opinion. Due to the growing concern of these stakeholders for environmental issues, their support can only be obtained if it is possible to demonstrate that nuclear energy industry will not leave behind unsolved issues that will be a burden to the next generations. In this context decommissioning of the first generation of EDF NPPs constitutes a prerequisite for the erection of a new type of nuclear power plant. This paper will present the programme defined by EDF for the decommissioning of its nine already shutdown reactors (Fig. 1). The reasons of the recent evolution of EDF decommissioning strategy will be explained and the key issues that will contribute to the successful implementation of this programme will be addressed. Finally, what has been achieved on sites so far and major planned activities will be described.


2020 ◽  
Vol 29 (7) ◽  
pp. 670-687
Author(s):  
Jonathan Tollefson

Many thought that the 11 March 2011 Fukushima nuclear disaster in Japan might be the end of the “global nuclear renaissance.” In Europe, mass media after Fukushima increasingly presented negative framing of nuclear energy and highlighted declining support for the nuclear industry. In the United States, however, nuclear production and public support for the industry remained steady. This article analyzes US media documents to understand the construction of public discourse on nuclear power in the wake of the Fukushima disaster. Through a content analysis of US newspapers, it demonstrates that post-Fukushima media framed the crisis in a way that privileged expert knowledge and opinion, while delegitimizing non-expert engagement with nuclear energy issues. A comparison between national newspapers and newspapers located in two regions with controversial nuclear plants and active anti-nuclear citizens’ movements additionally demonstrates the power and reach of the identified framework across the spectrum of views on nuclear power.


2000 ◽  
Vol 1719 (1) ◽  
pp. 191-199 ◽  
Author(s):  
Zongwei Tao ◽  
F. Gordon Zophy ◽  
John Wiegmann

Transportation asset management is an integrated set of best practices and systems that achieve optimal and cost-effective investment and use of transportation assets throughout their service life cycle. Most infrastructure management programs and systems contain certain elements of asset management functions. However, they lack a strong capacity to accomplish the overall asset management goal. Presented is an asset management model together with an approach for systems integration. The asset management model illustrates basic asset management goals, strategies, principles, and analysis methods. An example of an integrated maintenance program incorporates the features of the model. Supporting the asset management model is a systems integration approach that demonstrates how component asset management systems can be integrated at different stages of their development life cycles. The integration process is needed to ensure that system interoperability truly supports an effective asset management program. The approach can be defined in five phases: ( a) business integration, ( b) system requirements integration, ( c) logical design integration, ( d) physical design and development integration, and ( e) implementation integration. Each phase carries a particular integration objective and develops unique integration products. An operational scenario tool is introduced as an implementation strategy for asset management.


2016 ◽  
Vol 5 (1) ◽  
pp. 143-153
Author(s):  
Horatio Sam-Aggrey

Small modular reactors (SMRs) are being touted as safer, more cost effective, and more flexible than traditional nuclear power plants. Consequently, it has been argued that SMR technology is pivotal to the revitalization of the nuclear industry at the national and global levels. Drawing mainly on previously published literature, this paper explores the opportunities and challenges related to the deployment of SMRs in the northern territories of Canada. The paper examines the potential role of SMRs in providing an opportunity for remote mines in northern Canada to reduce their vulnerability and dependence on costly, high-carbon diesel fuel. The paper also outlines and discusses some of the potential socio-economic barriers that could impede the successful introduction of SMRs in the territories. These issues include: economic factors (such as the price of primary minerals and economics of mineral exploration, and the cost of SMR deployment), the lack of infrastructure in the territories to support mining developments, and the issues pertaining to the social acceptance of nuclear power generation.


2016 ◽  
Vol 2 (2) ◽  
pp. 98
Author(s):  
Titus Kristanto

AbstrakManajemen aset merupakan hal terpenting dalam perusahaan. Proses manajemen aset yang tepat, dapat membuat aset yang dimiliki perusahaan lebih optimal. Dalam penelitian ini, Penulis membahas perancangan Enterprise Architecture (EA) manajemen aset yang dimiliki oleh PT Pembangkit Jawa Bali (PT PJB) dengan Zachman Framework. Ada 7 (tujuh) tahapan yang dilakukan perusahaan dalam manajemen aset yaitu tahapan pengumpulan data, inisialisasi perencanaan, melihat kondisi perusahaan, menganalisis hasil kondisi enterprise, membuat perencanaan arsitektur, membuat rencana implementasi, dan membuat portofolio aplikasi. Hasil penelitian adalah evaluasi blueprint arsitektur untuk diimplementasikan pada beberapa tahun di masa mendatang.Kata kunci: Enterprise Architecture Planning, manajemen aset, Zachman Frameworks. AbstractAsset management is a cornerstone for any business organisations. Proper asset management process can make a company's assets more optimal. This paper discusses the design of enterprise architecture of management assets owned by PT Pembangkit Jawa Bali with Zachman Framework. There are 7 stages in asset management, i.e. data collection, initialization planning, Observing the existing condition of enterprise, analyze the results of the condition of enterprise companies, create architectural planning, create implementation planning, and create application portfolio. The results of this reseach is evaluation of architectural blueprint to be implemented for several years in the future.Keywords: Asset management, Enterprise Architecture Planning, Zachman Framework.


2018 ◽  
Vol 35 (4) ◽  
pp. 110-113
Author(s):  
V. A. Tupchienko ◽  
H. G. Imanova

The article deals with the problem of the development of the domestic nuclear icebreaker fleet in the context of the implementation of nuclear logistics in the Arctic. The paper analyzes the key achievements of the Russian nuclear industry, highlights the key areas of development of the nuclear sector in the Far North, and identifies aspects of the development of mechanisms to ensure access to energy on the basis of floating nuclear power units. It is found that Russia is currently a leader in the implementation of the nuclear aspect of foreign policy and in providing energy to the Arctic region.


Energies ◽  
2021 ◽  
Vol 14 (13) ◽  
pp. 3832
Author(s):  
Awwal Mohammed Arigi ◽  
Gayoung Park ◽  
Jonghyun Kim

Advancements in the nuclear industry have led to the development of fully digitized main control rooms (MCRs)—often termed advanced MCRs—for newly built nuclear power plants (NPPs). Diagnosis is a major part of the cognitive activity in NPP MCRs. Advanced MCRs are expected to improve the working environment and reduce human error, especially during the diagnosis of unexpected scenarios. However, with the introduction of new types of tasks and errors by digital MCRs, a new method to analyze the diagnosis errors in these new types of MCRs is required. Task analysis for operator diagnosis in an advanced MCR based on emergency operation was performed to determine the error modes. The cause-based decision tree (CBDT) method—originally developed for analog control rooms—was then revised to a modified CBDT (MCBDT) based on the error mode categorizations. This work examines the possible adoption of the MCBDT method for the evaluation of diagnosis errors in advanced MCRs. We have also provided examples of the application of the proposed method to some common human failure events in emergency operations. The results show that with some modifications of the CBDT method, the human reliability in advanced MCRs can be reasonably estimated.


2013 ◽  
Vol 2013 ◽  
pp. 1-14 ◽  
Author(s):  
Amitava Ghosh ◽  
Prithviraj Chakraborty

Objective. Frusemide loaded calcium alginate micropellets, an oral microparticulate delivery system, was statistically optimized exhibiting prolonged therapeutic action minimizing its adverse effects.Methods. Ionotropic Gelation technique was adopted employing 32Factorial designs and keeping the entire process free from organic solvents. Physicochemical and the release characteristics of the prepared formulations were studied, keeping variations only in sodium alginate (primary polymer) and Acrycoat E30D (copolymer) dispersion.Result. Sodium alginate was predominant over Acrycoat E30D in all batches. Nonadditives or interaction was observed to be insignificant. Multiple regressions produced second-order polynomial equation, and the predictive results obtained were validated with high degree of correlation. Thein vivostudy applauded that optimized calcium alginate micropellets of frusemide can produce a much greater diuretic effect over an extended period of 24 hours.Conclusion. This study reveals that the potential of a single dose of the mathematically optimized micro pellets of frusemide formulation is sufficient in the management of peripheral edema and ascites in congestive heart failure and as well in the treatment of chronic hypertension, leading to better patient compliance, and can be produced with minimum experimentation and time, proving far more cost-effective formulation than the conventional methods of formulating dosage forms.