scholarly journals The Use of Project Time Management Processes and the Schedule Performance of Construction Projects in Mexico

2015 ◽  
Vol 2015 ◽  
pp. 1-9 ◽  
Author(s):  
Rómel G. Solís-Carcaño ◽  
Gilberto A. Corona-Suárez ◽  
Aldo J. García-Ibarra

Delays have been frequently reported as the cause of several conflicts that affect the different parties involved in construction projects. Project Time Management (PTM) includes a number of planning and controlling processes that are recommended for complying with requirements related to project time. The study reported in this paper aimed at assessing the use of PTM processes and its relation with project schedule performance (i.e., timely completion). Seven PTM processes and seventy-seven tasks associated with them were identified from the literature that is globally relevant to project management. The study included the assessment of fourteen school construction projects executed by a public agency in the Yucatan Peninsula, Mexico. These projects were monitored during the construction phase in order to measure two different variables: the use of processes related to PTM (i.e., schedule planning and controlling processes) and the project schedule performance. For each of these projects a Use Index was obtained for assessing the first variable, while the Schedule Performance Index and the Schedule Variance were computed to assess the second one. The results demonstrated there is statistical dependence between these two variables. Most of the projects that attained timely completion also made a greater use of the PTM processes.

2018 ◽  
Vol 1 (2) ◽  
Author(s):  
Abadi Palusia

Currently, many road projects are performing poorly for timely completion, an analysis of time road project implementation needs to be done on the contractor company, so that it can be known that the shortcomings and weaknesses done so far, which later can be an input for contractor, to be even better in the implementation of time management of a road construction project. In 2017 many packages of road construction works in Sawahlunto City. The purpose of this study is to determine the factors that affect the implementation of time management of road construction projects in Sawahlunto. The research method used is quantitative research method by spreading questionnaires to the respondents involved in road construction project in Sawahlunto City. Kata Kunci : Time Management, road, late


Author(s):  
Ayşen Saraç Çıracıoğlu ◽  
Hakan Yaman

In both developing and industrialised countries, due to numerous time-related problems of construction projects, BIM-based time management, 4D BIM, plays an increasingly critical role within the industry. This study investigates the planning and scheduling problems, BIM application level, and BIM-based scheduling implementation by the lead construction companies in Turkey. Despite the critical importance of the planning department in construction companies, the planning and BIM integration levels have scarcely been investigated from the contractor perspective in Turkey. This paper presents the outcomes of 16 semi-structured interviews (SSI) with managers of the leading Turkish contractors selected from 100 of ENR’s 2019 Top 250 International Contractors list; a list of issues are outlined. The current situation escalates problems like tendering with missing project documents, examining 2D project drawings while scheduling, fragmentation, project manager’s reluctance to use and follow the project schedule, issues with updating the schedule as per construction improvements and quantities, and a lack of investment for BIM implementation. The research findings, ultimately, aim to help contractors improve their processes. Although this study’s findings are obtained from interviews with lead Turkish contractors, it is not limited in terms of geographic context since the interviewed contractors work worldwide.


Author(s):  
Anthony Perrenoud ◽  
Kenneth Sullivan

Schedule management reduces schedule delays while optimizing positive opportunities to the project timeline. The built industry continues to struggle to capture project metrics that will improve supply chain management. The lack of performance metrics on construction projects filters the actual project performance of the project stakeholders. Contractors can easily be blamed for schedule delays because of the nature of construction projects. A large university capital improvement organization recognizes their lack of performance information and begins implementing a performance measurement system in 2005. The university measurements focus on project impacts to cost, schedule, and quality in hopes that additional information will improve risk management processes. This article reviews the schedule impacts that contractors create within projects. Data was collected directly from both contractor and client project managers of 254 construction projects. Actual delays from contractors were found to be a small percentage of the overall project schedule delays. More than half of the delays that contractors produced were found to be correlated to the material suppliers.


2010 ◽  
Vol 16 (4) ◽  
pp. 491-498
Author(s):  
Yimin Zhu ◽  
Mehmet Emre Bayraktar ◽  
Shu-Ching Chen

Disagreements in construction projects often result in litigation that is both time‐consuming and expensive. A dispute review board (DRB) provides a valuable and proven alternative method of dispute resolution. Currently, the Florida Department of Transportation (FDOT) stores DRB reports in portable document format (PDF) with limited search capability. Improving information retrieval of DRB documents and providing a certain level of integration of DRB reports with relevant but heterogeneous data and documents is the key to enhancing the current FDOT DRB system. This paper presents a web‐based data management framework to improve information management processes of the FDOT DRB system by providing key features such as metadata generation, an integrated review process, a simple issue description, member information management, and versatile information search. The new system not only allows DRB members and FDOT construction engineers to store and retrieve DRB reports but also provides more functionality to process those re‐ports. New functionalities include a structured search based on the metadata of DRB reports, an unstructured search using advanced computer technology, and the integration of DRB reports with other related information for analysis. This type of functionality improves the efficiency and effectiveness of the DRB system. Santrauka Del nesutarimu vykdant statybos projektus dažnai kyla teisminiu ginču, kurie yra brangūs ir trunka ilgai. Vertingas ir praktikoje prigijes alternatyvus ginču sprendimo metodas yra ginču nagrinejimo taryba (GNT). Šiuo metu Floridos transporto departamentas (FTD) yra sukaupes GNT ataskaitas PDF formatu su ribota paieškos galimybe. GNT dokumentu informacijos paieška ir tinkamo lygio GNT ataskaitu integravimas su reikalingais, bet heterogeniniais duomenimis yra esmine prielaida tobulinti dabartine FTD GNT sistema. Straipsnyje pristatoma internetine duomenu valdymo sistema, skirta patobulinti FTD GNT valdymo procesa remiantis šiomis esminemis savybemis: metaduomenu generavimo, integruoto peržiūros proceso, paprasto ginčo aprašymo, dalyvio informacijos valdymo, visapusiškos informacijos paieškos. Naujoji sistema ne tik leidžia FTD BNT nariams saugoti bei rasti GNT ataskaitas, bet ir sudaro galimybes funkcionaliau jas apdoroti. Naujos sistemos funkcijos apima struktūrizuota paieška GNT ataskaitu metaduomenu pagrindu, restruktūri‐zuota paieška naudojant pažangias kompiuteriu technologijas ir GNT ataskaitu integravima su kita susijusia analizuojama informacija. Šios funkcines savybes pagerina GNT sistemos efektyvuma.


2021 ◽  
Vol 11 (12) ◽  
pp. 5531
Author(s):  
Linlin Xie ◽  
Yajiao Chen ◽  
Ruidong Chang

Prefabricated buildings are the direction of the future development of the construction industry and have received widespread attention. The effective execution of prefabricated construction project scheduling should consider resource constraints and the supply arrangement of prefabricated components. However, the traditional construction resource-constrained project scheduling implementation method cannot simultaneously consider the characteristics of the linkage between component production and on-site assembly construction. It cannot also fully adapt to the scheduling implementation method of the prefabricated construction projects. It is difficult to work out a reasonable project schedule and resource allocation table. In order to determine the relevant schedule parameters that can reflect the actual construction situation of the prefabricated building and meet the scheduling requirements of the prefabricated project, this study proposes a prefabricated construction project scheduling model that considers project resource constraints and prefabricated component supply constraints. Additionally, it improves the design of traditional genetic algorithms (GAs). Research results of the experimental calculation and engineering application show that the proposed project scheduling optimization model and GA are effective and practical, which can help project managers in effectively formulating prefabricated construction project scheduling plans, reasonably allocating resources, reducing completion time, and improving project performance.


2016 ◽  
Vol 2016 ◽  
pp. 1-8 ◽  
Author(s):  
Roberto Barbosa dos Santos ◽  
Antônio Edésio Jungles

Construction projects are risky in both physical implementation and management. The characteristics of the risk reinforce the necessity of efficient management to increase the chances of success without commitment to its goals. This study explores the correlation of delay and the schedule performance index (SPI) to evaluate the risk of a construction project completed with time overruns. The hypothesis that the SPI of projects with a delay is distinct from those projects without a delay is assumed. A database with 19 elements was used to test this hypothesis and to calculate limit values to the SPI. Therefore, the risk of delay will be small when the observed SPI is greater than the superior limit and large when the SPI is below the inferior limit. The simplicity involved in the calculation of these values showed an advantage in comparison with other methods of risk evaluation. Another strong point observed is that any company can determine the value of risk by considering its own history and support decisions like doing corrective actions.


2021 ◽  
Vol 318 ◽  
pp. 02003
Author(s):  
Hassan Kamal Alhilli ◽  
Sedki I. Rezoqi

Changes are a common phenomenon in the construction industry, impacting the project's cost, time, and performance. The purpose of this work is to a comprehensive review relating to variation order causes. Also, the aim here is to determine variation order causes in the building’s construction. More importantly, explore the relationship between these causes. However, the importance of specifying the causes for change orders is the first step in managing variation orders to reduce the harmful effect on a project. The field survey was conducted for several institutions such as health (Karkh’s health), higher education (University of Baghdad and University of Kufa). As a result, a field visit was made to the project sites. They were then, Conducting interviews with the resident engineer, the consultant, and the contractor. A developer tool called cause (variation orders) breakdown structure (CBS) included 12 causes at the first level, including 103 sub-causes. There is a relationship between the variation orders causes, which is evident in the third level. The study recommends adopting (CBS) a comprehensive reference for variation order causes in projects due to facilitating their management processes. Future research could examine the relative importance of variation order causes, in addition to using a fuzzy cognitive map to find the extent of each cause’s influence on the other.


Author(s):  
N. B. Kasim ◽  
Peniel Ang Soon Ern

Construction materials usually constitute a major portion of the total cost in a building construction project. Despite the potential benefit of ICT, convincing construction organisations to embrace its use and implementation has proved a difficult task. This research seeks to identify the implementation of ICT in construction materials management processes and to investigate on the acceptance of contractors for ICT transformation to the materials management in construction projects. In relation to that, current constraints that are found hindering the acceptance of ICT in materials management processes are also identified. A triangulation research approach which consists of standard derived questionnaires, semi structured interviews with class A contractors and review of previous research were conducted. The findings from this research reveal that the implementation of ICT in the materials management for construction projects in Malaysia is at early stage. Microsoft Excel Spreadsheet and handheld devices are found to be the common ICT tools adopted in the materials management processes. Meanwhile, there is only an average level of acceptance towards the transformation of ICT implementation in the construction materials management. The main barrier is found to be the cost involvement at the initial stage or overall implementation of ICT in the materials management processes. Finally, it can be concluded that there is a lack of awareness towards the ICT implementation of materials management in the construction projects.