scholarly journals ANALISA FAKTOR-FAKTOR YANG MEMPENGARUHI PENERAPAN MANAJEMEN WAKTU PADA PROYEK KONSTRUKSI JALAN DI KOTA SAWAHLUNTO

2018 ◽  
Vol 1 (2) ◽  
Author(s):  
Abadi Palusia

Currently, many road projects are performing poorly for timely completion, an analysis of time road project implementation needs to be done on the contractor company, so that it can be known that the shortcomings and weaknesses done so far, which later can be an input for contractor, to be even better in the implementation of time management of a road construction project. In 2017 many packages of road construction works in Sawahlunto City. The purpose of this study is to determine the factors that affect the implementation of time management of road construction projects in Sawahlunto. The research method used is quantitative research method by spreading questionnaires to the respondents involved in road construction project in Sawahlunto City. Kata Kunci : Time Management, road, late

2020 ◽  
Vol 5 (2) ◽  
pp. 67-92
Author(s):  
Njebi Mark Mutugi ◽  
Prof. Dorothy Ndunge Kyalo

Purpose: Major road construction projects across Kilifi County have experienced delays in delivery due to a majority of contractors, both local firms and government agencies, failing to adhere to agreed-upon completion dates.it is in the backdrop of these problems that influenced the researcher to establish the influence of time management on the implementation of road projects in Kilifi County. The main purpose of this study was to examine the influence of time management on the implementation’s road constructions projects in Kilifi County.Methodology: The study adopted cross sectional research design and collect data using questionnaires from 120 engineers/project managers, supervisors/inspectors and technicians/foremen from 12 organizations including five construction companies involved in urban road construction projects in Kilifi County, five service providers whose utility facilities run along road construction corridors in Kilifi County, and two state corporations charged with the management of road construction in Kenya. Data was analysed using both descriptive and inferential statistics with the help of IBM SPSS Statistics. Descriptive analysis involved the use of frequencies, percentages, mean and standard deviation in order to summarize the results of the various study variables. Inferential analysis involved the application of Pearson correlation and regression analysis to determine the nature of relationship between time management and implementation of road projects in Kilifi County.Results: The study found out that activity sequencing positively and significantly affects road constructions projects in Kilifi County (r = 0.688, P=0.000 < 0.01). The study further determined that a unit improvement in activity sequencing would lead significantly lead to improvement in road project implementation (β = 0.127, t = 2.037, P=0.044 <0.05). It was also determined that resource estimation positively and significantly affects implementation of road constructions projects in Kilifi County (r = 0.721, P = 0.002 < 0.01). the analysis also showed that a unit improvement in resource estimation would lead to a unit improvement in road project implementation (β = 0.218, t = 2.741, P = 0.005<0.05). The study also determined that activity control significantly and positively predicts implementation of road constructions projects in Kilifi County (r = 0.909, P= 0.000< 0.01). The regression analysis showed that a unit improvement in activity control would significantly lead to an improvement in implementation of road construction projects in the county (β = 0.173, t =3.045, P = 0.003<0.05). Finally, the study found out that institutional capacity affects road projects implementation (r = 0.558, P=0. .003 < 0.01). It was also determined that institutional capacity has moderating influence on the relationship between time management and road project implementation (β = 0.185, t = 4.302, P=0.000 < 0.05).Unique contribution to theory, policy and practice: The study recommended that for effective time management during implementation of road construction projects, there should be stakeholder involvement as this will facilitate ideas and perspective. Stakeholder involvement in time management and planning, will better their correspondence, improve accuracy of information, increase credibility and acceptance findings and finally improve the quality road constructions projects in Kilifi County.


2021 ◽  
Vol 10 (3) ◽  
Author(s):  
Osama Salim Al Adawi ◽  
Hussin Yahia

Cost overrun is a common phenomenon in construction projects of any country, be it in developing or developed countries. This issue is a critical issue that impacts a project's success. It, therefore, needs serious attention from all the participants in the construction project to keep the projects in safe mode, to be completed within its limited cost, time, and performance. Cost overrun has a negative impact on construction project performance, which is because the construction industry is vast and complex. Any difficulty occurring during the project's life cycle leads to other problems in various parts of the project. Studies by many researchers’ cost overruns by literature review, and according to their studies suggested the most cost overrun causes. The aim of this study is to identify the most critical factors leading to cost overruns on road projects in Oman, and then provide suggestions to resolve them.


2015 ◽  
Vol 20 (3) ◽  
pp. 208-234 ◽  
Author(s):  
Wilson Udo Udofia ◽  
B. H. W. Hadikusumo ◽  
Djoen San Santoso

Purpose – This paper aims to identify and examine valid project termination reasons and the rebidding strategies of road construction project. Rebidding strategies is one of the measures to restructure terminated/troubled road construction project. Design/methodology/approach – An instrument which comprised 82 items entitled “Project Termination and Rebidding Strategies in Road Construction Projects in Nigeria” (PTRS) was developed to evaluate 60 randomly sampled road projects using qualified project/site managers and engineers as project respondents for the purpose of securing valid information on the terminated and rebid road construction projects. Mean, standard deviation and factor analysis shall be used as analytical tools in identifying valid termination reasons and rebidding strategies and as well as the relationship between them through regression analysis. Findings – The paper’s findings revealed major project termination reasons and rebidding strategies. It further indicated significant relationship between variables which constitutes project termination reasons and rebidding strategies through regression analysis. Practical implications – The outcome of the paper could be of immense benefits during the procurement phase of public project, especially regarding road construction. Stakeholders involved in the road procurement should seek relevant information concerning the road project reprocurement from the expert prior to contractual obligations. Originality/value – Major challenges confronting the road construction project involve inappropriate procurement practices which frequently culminate into late deliveries of project. Rebidding strategies serve as a model through which cost, time and quality needs of the project client can be reassured in restructuring a terminated/troubled project.


2019 ◽  
Vol 9 (1) ◽  
pp. 14-17 ◽  
Author(s):  
Magdalena Kowacka ◽  
Dariusz Skorupka ◽  
Artur Duchaczek ◽  
Paweł Zagrodnik

AbstractThe work contains information on the implementation of surveying works in the road construction process. The aim of the research was to identify geodetic risk factors occurring at the stage of preparation of a construction project, the presence of which can greatly disrupt the undertaking such as the road construction. The research was carried out on the basis of expert knowledge, documentation obtained from various road construction projects and the analysis of disturbances at the initial stage of works.


2020 ◽  
Vol 13 (6) ◽  
pp. 119
Author(s):  
Johnson Matu ◽  
Dorothy Ndunge Kyalo ◽  
John Mbugua ◽  
Angeline Sabina Mulwa

This paper examines the influence of stakeholder participation in project execution on completion of road projects implemented by Kenya Urban Roads Authority. Descriptive research survey design was used for collection of both quantitative and qualitative data. Analysis was performed using correlation and regression analysis. The results were r = 0.796, R2 = 0.634, F (4, 209) = 90.503 and p&lt;0.000&lt;0.05. The findings revealed that stakeholder participation in project execution showed a strong, positive and statistically significant relationship with completion of urban road transport infrastructure projects and accounted for 63.4% of total variation in such projects. The study recommends government agencies should endeavour should work together during project implementation to ensure that service lines and acquisition of land is done ahead of time to avoid delay in completion. This will aim at ensuring quality work is achieved by both the client and the consultant through a collaborative stakeholder engagement. In conclusion, the findings of this study will shape the future of road construction and stakeholder engagement in road construction projects.


Author(s):  
Andi Herius ◽  
Indrayani Indrayani Indrayani ◽  
Arfan Hasan ◽  
Ahmad Mirza

Some road construction projects use petrasoil additive to increase soil stabilization, one of then is the Improvement of Tabarfane-Hokmar (Chemical Petrasoil) Road Project in Aru Selatan Timur District, Aru Islands. To obtain the influence of petrasoil aditive material as soil stabilization in swamp areas, a research is needed. petrasoil additives that powder shape are dissolved in water with 3 variations, namely 500 liters, 750 liters, and 1000 liters of water. Tests which carried out include compaction testing, index properties, and CBR. The results showed that the addition of petrasoil mixture with water without being combined with other added ingredients could lead to increasingly unstable soil conditions where the soil water content increased and the dry weight of the soil diminished, meaning that soil density decreases, and the CBR value of soil decreases.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Henry Duncan John Mwamvani ◽  
Christopher Amoah ◽  
Emma Ayesu-Koranteng

PurposeThe study aims to find the causes of road projects implementation delays in Blantyre, one of the four city councils (CCs) in Malawi.Design/methodology/approachThe study followed a qualitative research approach using a Blantyre City Council (BCC) as a case study. This study combined in-depth, face-to-face interviews with councillors, secretariat staff, consultants, and contractors who worked on the city's road projects. Data gathered were analysed using thematic content analysis. Also, some road project documents were examined.FindingsThe findings from the case study revealed the primary cause of road project construction delays as the shortage of engineers in conducting detailed proposed projects surveys resulting in incomplete project scope definition before contractor's procurement. Other identified factors were service providers delaying the removal of existing public utility infrastructure from project sites, client funding issues, scope changes, and client delays in issuing instructions to the contractors during project implementation. Another factor was the shortage of construction equipment and construction materials experienced by some appointed contractors.Research limitations/implicationsOnly road construction projects and stakeholders operating from Blantyre city, Malawi, were contacted for the study; thus, the findings may not be generalizable.Practical implicationsThere is an urgent need to increase technical employees, especially engineers and other critical technical staff such as quantity surveyors in Blantyre. Employees' conditions of service should be conducive to attract qualified people to undertake effective management and assessment of projects before commencement to identify the feasibility of proposed projects to decrease the rate of road construction project delays.Originality/valueThe study has established Blantyre city's core challenges in implementing its road projects seamlessly and has provided mitigation measures for dealing with the shortcomings.


2017 ◽  
Vol 15 (03) ◽  
pp. 395-416 ◽  
Author(s):  
Ehsan Mousakhani ◽  
Mohammadreza Yavarkhani ◽  
Soheyla Sohrabi

Purpose Road construction projects are one of the strategic industries in each country and their construction and development requires spending huge funds. Regarding the increased demand and resource constraints; a technique which reduces costs by maintaining and improving the functioning is of great importance for the authorities of each country. Value engineering is a comprehensive and coherent means based on innovation and team work which, in addition to maintaining the quality and improving the project function, reduces its cost and is not limited to the design and construction phase; however, it includes exploitation and maintenance as well. This study aims to present a practical model for the implementation and application of value engineering process in a construction project located in a special region (in terms of tourism, positioning in an economic growth path, and the East-West strategic axis of the region). In this regard, after reviewing the advisor's design, considering the interests of the project stakeholders, reviewing design criteria and assessment methods and with the use of value engineering techniques, a new option was presented which led to a significant reduction in costs and time and an increase of quality, safety, and environmental factors. Finally, including initial costs, repair, maintenance, income and expenses, the relative value index of this option, compared to the advisor's option, increased from 0.9 to 3.5. Based on the increased need for development of roads in the country, exploiting this model in similar projects can significantly improve the project value and the effectiveness of investments. Design/methodology/approach This research project was selected with regard to the extremely high credit of the project and its potential in terms of Value Engineering implementation. In this study, technical and financial information were first collected after forming a value engineering team including a value engineering expert who was responsible for coordinating the work, some representatives of the employer, designer, executor, and budget estimator. In functional analysis phase with the use of FAST graph, advantageous, costly, and risky functions were identified. In the creativity phase, ideas related to selected functions were created and investigated and developed in the evaluation phase. Finally, calculating the value index, two variants with higher value index than the baseline plan, were proposed and implemented. Findings Since the determining criteria of designing and implementation of road construction projects including increased safety, reduced travel time, user satisfaction, ease of implementation, cost of construction and maintenance and so on are almost similar in most projects, using this study results and implementing its practical framework in other construction projects can be beneficial. These parameters lead to an increase in quality, value, and safety of the project. With regard to done steps and resulted incomes, this essay can be known as a practical and theoretical model to promote the value of crucial projects especially in developing countries. Research limitations/implications Sanandaj-Hamedan road with the length 176km connects central provinces of Iran. This study is regarding the first part of this route. Based on the specific topography of the region and the existing road limitations, selecting a good variance with all the features of an ideal road from geometric, economic, and safety aspects is a difficult task. Originality/value Employers and project sponsors are always looking for products with greater value and lower cost; therefore, present a practical model for the implementation and application of value engineering process in a construction project and providing a similar work experience can encourage the use of value engineering techniques and significantly improve the project value and the effectiveness of investments.


2020 ◽  
Vol 11 (4) ◽  
pp. 1184
Author(s):  
Ashem Emmanuel Egila ◽  
Oluwaseun Abdulakeem Balogun ◽  
Saheed Olanrewaji Yusuf

Poor road infrastructure in Nigeria is a significant challenge, just like poverty, insecurity, and unemployment. The construction of road in the country is characterized by numerous challenges throughout the project life cycle. Some of these challenges are project delay and cost overrun, corruption and fraud, faulty contractual process among others. Objectives of this study are to identify factors influencing delays and cost overruns in road construction project, to rank these factors base on their impacts and importance, and to suggest conservative ways to address the future challenges that can result from delays and cost overruns of future road construction projects. The research instruments include in-depth literature review, fieldwork, questionnaire administration, and interview. Inferential statistics such as Relative importance index (RII) and Mean Value techniques were used to analyze collected data. The result of the study identified factors influencing delays and cost overruns in road construction projects as; man related, money-related, machine-related, material related, environmental-related, and method related factors. Analysis using RII and MV ranked man and money related as the highest factors for delay and cost overrun respectively. Hence, the research recommends that the Government should create an enabling environment, making suitable policy for the construction company to operate.


Author(s):  
Abdul Qadir Memon ◽  
◽  
Aftab Hameed Memon ◽  
Mohsin Ali Soomro ◽  
◽  
...  

This paper assessed the occurrence and severity level of various factors causing time and cost overrun in construction projects of Pakistan. Investigation was carried out through questionnaire form prepared based on 55 common factors identified from literature. Survey was done amongst the representatives of the contractors involved in handling construction activities in Pakistan. A total of 46 responses gathered against 100 distributed forms were analysed statistically. The results obtained from the analyses based on Average Index values revealed that delay in obtaining permits from the governmental agencies, financial difficulties are common issue faced in construction works of Pakistan. The study also revealed that high cost of machinery & its maintenance, inadequate planning & scheduling and slow information flow between parties have significant effect on time overrun cost while critical factors affecting cost overrun are high cost of machinery & its maintenance, unsuitable construction methods and lack of experience of contractors in affecting project cost. The findings of this study will be helpful for the practitioner in planning for achieving timely completion of the projects and also within the estimated cost.