Towards better management of groundwater resources—lessons from an integrated capacity building project in the Indo-Gangetic

2017 ◽  
Vol 2 (Suppl 2) ◽  
pp. A52.1-A52
Author(s):  
Christine Attia Tarr ◽  
Guillermo Martinez Perez ◽  
Senga Omeonga ◽  
Fanta Kibungu ◽  
Ana Meyer ◽  
...  

Author(s):  
Heather Wharrad ◽  
Stathis Konstantinidis ◽  
Ping Yein Lee ◽  
Phelim Yong Voon Chen ◽  
Michael Taylor ◽  
...  

2009 ◽  
Vol 59 (2) ◽  
pp. 279-287 ◽  
Author(s):  
J. Bowen ◽  
G. Acciaioli

This paper presents a model of development action synthesising the development arena framework with collective action theory. It shows how application of this model in the Engineers Without Borders Australia (EWB) water supply improvement and capacity building project in Tenganan, Indonesia has helped to maximise the extent to which the project practice can reflect the project rhetoric as “bottom-up” or community-inspired. The model posits a broad range of stakeholders actively engaged in development action: each stakeholder is different, with its own interests, missions, procedures, and ways of deploying power in development action. Recognising the multiplicity of subjects of development is especially crucial for improving bottom-up practice. Connections and interactions among stakeholders are inherently problematic, and must be negotiated to accomplish development work, as tensions in the dynamic among stakeholders may operate to restrict the success of these “bottom-up” development projects.


Author(s):  
A. Calantropio ◽  
F. Chiabrando ◽  
J. Comino ◽  
A. M. Lingua ◽  
P. F. Maschio ◽  
...  

Abstract. UP4DREAM (UAV Photogrammetry for Developing Resilience and Educational Activities in Malawi) is a cooperative project cofounded by ISPRS between the Polytechnic University of Turin and the United Nations Children Fund (UNICEF) Malawi, with the support of two local Universities (Lilongwe University of Agriculture and Natural Resources, and Mzuzu University), and Agisoft LLC (for the use of their photogrammetry and computer vision software suite). Malawi is a flood-prone landlocked country constantly facing natural and health challenges, which prevent the country's sustainable socio-economic development. Frequent naturals shocks leave vulnerable communities food insecure. Moreover, Malawi suffers from high rates of HIV, as well as it has endemic malaria. The UP4DREAM project focuses on one of the drone project's critical priorities in Malawi (Imagery). It aims to start a capacity-building initiative in line with other mapping missions in developing countries, focusing on the realization and management of large-scale cartography (using GIS - Geographic Information Systems) and on the generation of 3D products based on the UAV-acquired data. The principal aim of UP4DREAM is to ensure that local institutions, universities, researchers, service companies, and manufacturers operating in the humanitarian drone corridor, established by UNICEF in 2017, will have the proper knowledge and understanding of the photogrammetry and spatial information best practices, to perform large-scale aerial data acquisition, processing, share and manage in the most efficient, cost-effective and scientifically rigorous way.


Author(s):  
Guillaume Martin

In Cambodia, only 16% of the population in rural areas has access to safely managed and clean water supply services, putting the health of 10.12 million people at stake. (Cambodia’s Voluntary National Review 2019 of the Implementation of the 2030 SDG Agenda).1001fontaines, a community-based enterprise located mainly in Cambodia, responds to this issue by enabling the production of safe drinking water directly in the targeted communities, through the establishment of small water enterprises. These units, called water kiosks, are entrusted to local entrepreneurs and supported in the long run thanks to a franchise model. In 2014, 1001fontaines suffered from low-performing water kiosks, which impacted the viability of the whole portfolio. As a result, 1001fontaines decided to launch the so-called “4G” capacity building project to upgrade the initial and continuing training of water entrepreneurs, expand distribution channels, and further leverage the local “O-We” brand to reach more beneficiaries. The “4G project” was implemented from 2014 to 2015, and resulted in the identification of best practices to be followed by every water entrepreneur. Since 2016, 1001fontaines has generalised the use of these best practices to build the capacities of new entrepreneurs.This case study aims to investigate the impact of the “4G project” and its conclusion on the water kiosks’ performance and on 1001fontaines’ ability to better and faster scale up its approach in Cambodia.


2009 ◽  
Vol 21 (2) ◽  
pp. 147-152 ◽  
Author(s):  
Gerard O'Reilly ◽  
Mark Fitzgerald ◽  
Pilane L Ariyananda ◽  
Krishantha Jayasekera ◽  
Sue Williams ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document