CLAIMS MANAGEMENT: UNDERLYING CAUSES IN MEGA-CONSTRUCTION PROJECTS
Construction claims remain unavoidable in any megaproject contractual relationship and can quickly escalate to misunderstandings, disputes and litigations if not appropriately managed. Disputes pose a significant risk in hindering project progress; they are characterised by lengthy legal battles that consume substantial time and financial resources. This study identifies the causes of claims encountered by clients, contractors and consultants in transport and energy sector mega construction projects in South Africa. A semi-systematic literature review was used to identify, select and appraise existing literature on this issue. Content analysis using NVivo 12 was used to identify factors causing claims in the construction sector, particularly in MCPs. Findings of the study revealed that construction projects occurring outside of South Africa experienced a delay in payments, time and cost overruns, change orders, inadequate project and drawing specifications, natural risks or force majeure. In South Africa, delays and cost overruns (due to insufficient experience and expertise of project managers and engineers) frequent to be the causes attributable to claims.