scholarly journals Engineering and Geological Zoning of the Residual Soil of the Malmyzhsky Deposit (Svoboda Site)

Author(s):  
I.V. Abaturova ◽  
◽  
T.S. Bobina ◽  

Interest to the study of residual soil arose at a time when geological engineers faced the problem of developing the open pits in the eluvial soils. A significant number of Russian and foreign scientists considered the formation of weathering crusts from different points of view. They established the geochemical zoning, and engineeringgeological zoning of the weathering crusts. However, no comprehensive and detailed engineering-geological zonation of the crusts of weathering, especially when studying mineral deposits, was given due to the insufficient attention paid to it until today. Therefore, it is important to correctly determine the type and profile of the residual soil in order to establish the possibility to control the engineering and geological conditions when exposing the rock mass during excavation work for further forecasting the slope stability of the projected open pit mining structures

Energies ◽  
2020 ◽  
Vol 13 (8) ◽  
pp. 1913
Author(s):  
Marek Cała ◽  
Katarzyna Cyran ◽  
Joanna Jakóbczyk ◽  
Michał Kowalski

The extraction of the Bełchatów lignite deposit located in the vicinity of the Dębina salt dome requires careful planning that considers the influence of mining projects on the slope and salt dome stability conditions. The instability problem is directly related to horizontal and vertical displacement, as well as the complex geological and mining conditions. These conditions are very unique with regard to the co-occurrence of the salt dome and lignite deposits in the same area, as well as the large scale of the pit wall slope. Thus, predicting rock mass behavior and ensuring the safety of mining operations are important issues. The presented analysis focused on the influence of long-term lignite extraction on the western pit wall slope of the Bełchatów field and the salt dome’s stability conditions. This study offers a comprehensive approach to a complex geotechnical problem defined by large-scale, complex geometry, and geological conditions. The rock mass behavior and stress conditions are simulated in numerical modelling. The results of the presented analysis will be useful not only for present mining activities but also for future developments related to post-mining and recultivation plans.


2021 ◽  
pp. 48-53
Author(s):  
I. V. Zyryanov ◽  
A. N. Akishev ◽  
I. B. Bokiy ◽  
N. M. Sherstyuk

A specific feature of open pit mining of diamond deposits in Western Yakutia is the construction of the open pits in the zone of negative ambient temperatures, which includes thick permafrost rock mass, and which is at the same time complicated by the influence of cryogenic processes on deformation of pit wall benches. The paper presents the comparative analysis of strength characteristics in frozen and thawed rocks, stability of benches during mining, the general geomechanical approach to the determination of parameters of non-mining walls of the ultra-deep open pit diamond mines, and the parameters of nonmining walls and benches. Optimization of open pit wall configuration should primarily be based on the maximum utilization of the strength properties of frozen rocks in combination with the development of new approaches, calculation schemes and methods for assessing stability of open pit walls and benches of unconventional design, including the non-mining vertical benches. The main design characteristic that determines the parameters of open pit walls is the structural tectonic relaxation coefficient, which specifies the calculated value of cohesion in rock mass. For the diamond deposits, the values of the structural relaxation coefficient were obtained in a series of field tests and back calculations. Full-scale tests were carried out both during exploration operations in underground mines and in open pits. The accuracy of determining the values of the structural relaxation coefficient in the range of 0.085–0.11 is confirmed by the parameters of non-mining walls in an open pit mine 385–640 m deep, with overall slope angles of 38–55° and a steeper H 0.35–0.5 lower part having the slope angle of up to 70° with average strength characteristics of 7.85–11.84 MPa and the internal friction angle of 28.1–37.4°. Using the natural load-bearing capacity of rock mass to the full advantage, which the values of the structural relaxation coefficient of deposits show, allows optimization of open pit wall slope design and minimization of stripping operations.


2018 ◽  
Vol 41 ◽  
pp. 01007
Author(s):  
Yuriy Kutepov ◽  
Aleksandr Mironov ◽  
Maksim Sablin ◽  
Elena Borger

This article considers mining and geological conditions of the site “Blagodatny” of the mine named after A.D. Ruban located underneaththe old open pit coal mine and the hydraulic-mine dump. The potentially dangerous zones in the undermined rock mass have been identified based onthe conditions of formation of water inflow into mine workings. Safe depthof coal seams mining has been calculated depending on the type of water body – the hydraulic-mine dump.


2021 ◽  
Vol 303 ◽  
pp. 01029
Author(s):  
Alexander Katsubin ◽  
Victor Martyanov ◽  
Milan Grohol

Information about the geological structure of Kuznetsky coal basin (Kuzbass) allows us to note that coal deposits developed by open-cast method are characterized by complicated conditions and have the following features: large length of deposits at significant depths of occurrence; coal series bedding of different thicknesses (from 1 to 40 m); different dip angles (from 3 to 90º); a significant number of dip and direction disturbances; different thickness of unconsolidated quaternary sediments (from 5 to 40 m); a wide range of strength values of rocks. In addition, there is a thickness irregularity and frequent variability of elements of occurrence of coal seams within the boundaries of a quarry field both in length and depth of mining. From the point of view of open-pit mining, such deposits are complex-structured. The factors listed above have a decisive influence on the choice of technical means, the order of development and the possibility of carrying out surface mining operations. Therefore, there is a need for a systematization of mining and geological conditions for the development of coal deposits, the purpose of which is to ensure a process of evaluation of complex-structured coal deposits for the development of coal-bearing zones by various complexes of equipment.


2020 ◽  
Vol 61 (5) ◽  
pp. 80-96
Author(s):  
Tuan Anh Nguyen ◽  
Viet Van Pham ◽  
Nam Xuan Bui ◽  
Hoa Thu Thi Le ◽  
Hai Thi Le ◽  
...  

In open pit mining, besides the value of the minerals obtained, the cost of waste rock removal determines the efficiency of the mining operation. The paper introduces the rock mass data processing method and modelisation of fractured rock mass to serve the optimal calculation of technological stages in mining. This code is a discrete fracture network (DFN) code that couple geometrical block system construction based on modelisation stochastic with RESOBLOK simulations. The method of three-dimensional modeling (3D) of the fractured rock mass in the quarry is based on the rock mass data, the geometrical parameters of the open pit mine. From there, the rock mass simulation models were used in the analysis of the stability analysis of open pit benches, the optimization of the blast design parameters at overburden benches, project construction materials, and technology projects for block stone extraction. An application in some open pit mines such as quarries of Vietnam is presented.


Author(s):  
Sergei Vokhmin ◽  

Introduction. Drilling and blasting operations are first in the workflow and significantly determine the economic efficiency of the entire mining and primary processing workflow in the enterprise. The cost of drilling and blasting operations is a significant part of total production costs of large mining companies. In this context, mining engineers today are facing a crucial technological problem, i.e. the reduction of the off-gauge fraction yield after the explosion. Research aims to develop the models which forecast the granulometric composition of the rock mass taken down as the original factor in reducing the economic waste of the entire workflow. Methodology. The parameters which influence the results of rock mass fragmentation and the techniques of rock mass granulometric composition forecasting in the course of drilling and blasting were analyzed. Results. The present paper gives a brief overview of the global mineral output; provides information on the extraction of key types of minerals (mineral fuel, ferrous metals, non-ferrous metals, precious metals, and construction materials), as well as revenues derived from their sale. On the example of domestic companies, approaches to the issue of forecasting the off-gauge fraction yield after the explosion. Summary. Direction for future actions in creating the model forecasting rock mass yield of a certain fraction after the explosion.


2021 ◽  
Vol 2021 ◽  
pp. 1-16
Author(s):  
Rongxing He ◽  
Jing Zhang ◽  
Yang Liu ◽  
Delin Song ◽  
Fengyu Ren

Continuous mining of metal deposits leads the overlying strata to move, deform, and collapse, which is particularly obvious when open-pit mining and underground mining are adjacent. Once the mining depth of the adjacent open-pit lags severely behind the underground, the ultimate underground mining depth needs to be studied before the surface deformation extends to the open-pit mining area. The numerical simulation and the mechanical model are applied to research the ultimate underground mining depth of the southeast mining area in the Gongchangling Iron mine. In the numerical simulation, the effect of granular rock is considered and the granular rock in the collapse pit is simplified as the degraded rock mass. The ultimate underground mining depth can be obtained by the values of the indicators of surface movement and deformation. In the mechanical model, the modified mechanical model for the progressive hanging wall caving is established based on Hoke’s conclusion, which considers the lateral pressure of the granular rock. Using the limiting equilibrium analysis, the relationship of the ultimate underground mining depth and the range of surface caving can be derived. The results show that the ultimate underground mining depth obtained by the numerical simulation is greater than the theoretical calculation of the modified mechanical model. The reason for this difference may be related to the assumption of the granular rock in the numerical simulation, which increases the resistance of granular rock to the deformation of rock mass. Therefore, the ultimate underground mining depth obtained by the theoretical calculation is suggested. Meanwhile, the surface displacement monitoring is implemented to verify the reasonability of the ultimate underground mining depth. Monitoring results show that the indicators of surface deformation are below the critical value of dangerous movement when the underground is mined to the ultimate mining depth. The practice proves that the determination of the ultimate underground mining depth in this work can ensure the safety of the open-pit and underground synergetic mining.


Sign in / Sign up

Export Citation Format

Share Document