The prospects for expanding the iron ore mineral and raw material base through the processing of oxidized ferruginous quartzite of the Mikhailovskoe deposit

2020 ◽  
pp. 19-24
Author(s):  
R. I. Ismagilov ◽  
◽  
P. M. Baskaev ◽  
T. V. Ignatova ◽  
E. V. Shelepov ◽  
...  
Author(s):  
I. F. Iskakov ◽  
G. A. Kunitsyn ◽  
D. V. Lazarev ◽  
А. А. Red`kin ◽  
S. A. Trubitsyn ◽  
...  

To use effectively internal raw material base, JSC “Ural Steel” accomplished I category major overhaul of the blast furnace No. 2. The main purpose of the overhaul was to design a rational profile which could ensure an ability to operate with a charge containing 95 % of Mikhailovskii GOK (mining and concentrating plant) pellets having basicity of 0.5 by CaO/SiO2. The blast furnace No. 2 having useful volume of 1232 m3, was constructed by design of Danieli Corus, the Netherlands, and was blown in on December 30, 2020. In the process of guarantee tests, step-by-step increase of Mikhailovskii GOK pellets (Fetotal = 60.5 %, CaO/SiO2 = 0.5) content in the charge iron ore part was being accomplished from 55 to 95.1%. Charging of the blend containing pellets in the amount of 55% of iron ore part, was done by charging system 4OOCC + 1COOCC (Ore - Coke) with filling level 1.5 m. Under conditions of pellets part increase in the blend, the charging system was changed to decrease their content at the periphery, to increase it in the ore ridge zone and make it intermediate between periphery and the ore ridge. At the pellets share in the iron ore raw materials 0.75 the charging system was used as the following: 3OOCC + 1COOC + 1COOCC, while at the content 95.1% the following charging system was used: 2COOC + 2COOC + 1COOCC. It was noted that in the period of guarantee tests the furnace running was smooth. The average silicon content in the hot metal was 0.70% at the standard deviation 0.666. Sulfur content in the hot metal did not exceed 0.024%, the blowing and natural gas consumption figures were 2100 m3/min and 11000 m3/min correspondently, oxygen content in the blowing 26.5%, hot blowing and top smoke pressure figures were 226.5 and 109.8 KPa correspondently. The productivity of the furnace was reached as high as 2358 t/day at the specific coke rate 433 kg/t of hot metal. After guarantee tests completion, the pellets content in the iron ore part was decreased gradually from 95 down to 50%. The decreasing was made by 5% in every 6 hours of operation. Application of the mastered technology of the blast furnace No. 2 with the increased share of pellets will enable to stably supply the blast furnaces No. 1, 3 and 4 by iron ore raw materials in the proportion of 30-35% of pellets and 65-70% of sinter.


Author(s):  
S.O. Popov ◽  
V.M. Sidor ◽  
V.A. Novik

Purpose. Substantiation of expediency and prospects for resuming the development of magnetite quartzites by underground method in Ukraine. Methodology. Analysis of literature sources, project documentation and practical data that contain information on the current state and conditions for the development of iron ore in Ukraine, as well as data on varieties and state of reserves of different types of these ores. Findings. The problem, faced by domestic iron ore mining enterprises in connection with reaching the large depths of mining operations and the emergence of a shortage of raw material resources, is described. The volumes of magnetite quartzites, which are contained in the dormant mines, operating mines, and those mines of Ukraine that are not currently in operation, are determined. The expediency and directions for resuming the development of these ores, as well as expanding the raw material base of the domestic iron ore mining industry, are justified. Originalty. The principal approaches to the implementation at a modern technological and technical level of the cyclic-flow underground mining technology for the development of magnetite quartzite reserves, which is capable of ensuring the economic efficiency of their extraction at depths where the open method of their development becomes unprofitable, are expanded. Practical value. Ensuring the economic efficiency of underground development of magnetite quartzite reserves in operating conditions of the iron ore mining enterprises of Ukraine leads to a significant expansion of their raw material base, which is currently constantly decreasing, as well as support of the production capacity of these enterprises for a long period of time, and allows Ukraine to remain one of the leaders in the iron ore mining industry in the world. Key words: prospects, underground mining, magnetite quartzites, mining, technological, economic aspects.


2020 ◽  
Vol 166 ◽  
pp. 02005
Author(s):  
Serhii Joukov ◽  
Serhii Lutsenko ◽  
Yulian Hryhoriev ◽  
Maxim Martyniuk ◽  
Volodymyr Peregudov

The economic efficiency of the enterprise and the length of its operation, the full utilization of mineral reserves and the total cost of operation depend on the selected depth and boundaries of opencast mining. In such conditions of the deposits’ development it is necessary to evaluate the capabilities of the raw material base for the further development of the mining enterprise. The basis for determining of the border overburden ratio is on the condition that the price of manufactured marketable output of the designed enterprise should not exceed the price of the same marketable output in the world market. The realization of this condition is achieved analytically. This takes into account the impact of the rate of return on the final depth of the designed open pit. A new method of determining of the border overburden ratio is developed, which ensures the competitiveness of iron ore concentrate in the world market. The value of the border overburden ratio is developed for the Pershotravnevij open pit of the Northern mining and processing plant, depending on the situation of the iron-containing products’ prices, which ensures the competitiveness of marketable iron-ore output in the domestic and world markets.


2021 ◽  
Vol 280 ◽  
pp. 01005
Author(s):  
Serhii Lutsenko ◽  
Yulian Hryhoriev ◽  
Volodymyr Peregudov ◽  
Aidar Kuttybayev ◽  
Asel Shampykova

The article considers the determination of the final contours of the open pits. One of the problems of development of iron ore deposits at the present stage of development of opencast mining is described, which consists in the fact that in most open pits their working contours on the surface have reached final position. In these conditions, it is necessary to reevaluate the capabilities of the raw material base for further operation of mining enterprises. The analysis of scientific achievements in the decision of the final definition of the open pits` contours is executed. The well-known principle of determining the boundaries of opencast mining, the principle of which is to determine the boundaries based on a comparison of the allowable cost of ore production with the expected for the designed open pit. On the example of the open pits, which reflect the characteristic features of the development of steep-dipping deposits of Ukraine, the influence of current overburden ratio of the existing open pits on the economic overburden ratio, which serves as the main criterion in determining the boundaries of opencast mining for the designed open pits. A method for determining the boundaries of the open pits has been developed, which provides for the use of the economic overburden ratio of opening as a value not constant but variable over time, and one that depends on the change of current coefficients of opening in open pits-competitors. As a result, the theory in the field of determining the final contours of the open pits is improved. The new method differs from the known ones by taking into account the change in the economic overburden ratio over time, as well as determining the impact of technological indicators of open pits - competitors on the final depth of the designed open pit.


2016 ◽  
Vol 17 (1(17)) ◽  
pp. 3-8
Author(s):  
A.V. Plotnikov ◽  
◽  
V.V. Efimenko ◽  
O.V. Yaremenko ◽  
◽  
...  

2018 ◽  
Vol 5 (6) ◽  
pp. 3-7 ◽  
Author(s):  
E.S. Popov ◽  
V.I. Gavrilyuk ◽  
N.V. Mukina ◽  
E.T. Kovalev ◽  
I.D. Drozdnik ◽  
...  

Mining Revue ◽  
2021 ◽  
Vol 27 (3) ◽  
pp. 40-44
Author(s):  
Eugen Traistă ◽  
Camelia Bădulescu ◽  
Maria Lazăr ◽  
Camelia Traistă

Abstract Metallurgical slag is one of the most common industrial wastes. Many of these wastes are not stable over time, by reacting with water and air, continuously generating emissions of heavy metals. Metallurgical slag processing is necessary for at least two reasons: reducing pollutant emissions and broadening the raw material base. The recovery of these slags is very difficult because they are the result of metallurgical processes that aimed to fix metals considered impurities in chemical matrices as stable as possible. This paper presents the initial research on the behavior of metallurgical slags against different leaching technologies.


2021 ◽  
Vol 1022 ◽  
pp. 80-86
Author(s):  
Mikhail G. Kholodnyak ◽  
Sergey A. Stelmakh ◽  
Evgeniy M. Shcherban ◽  
Mukhuma P. Nazhuev

The paper considers the current state of the mineral raw material base and the construction material market of the Rostov Region. The effect of various factors on the strain-stress behavior of local limestones has been investigated. The scientific and technical literary sources devoted to the processes of rock failure under various loads have been analyzed. The experimental studies have shown that the tested samples of limestone with a high content of cuboidal grains have characteristics comparable to those of the crushed granite stone. It has been concluded that the use of the Rostov Region limestones in the construction industry is competitive and feasible, provided the proper implementation of the engineering measures proposed in their production.