An on-line optimisation of a SBR cycle for carbon and nitrogen removal based on on-line pH and OUR: the role of dissolved oxygen control

2006 ◽  
Vol 53 (4-5) ◽  
pp. 171-178 ◽  
Author(s):  
S. Puig ◽  
Ll. Corominas ◽  
A. Traore ◽  
J. Colomer ◽  
M.D. Balaguer ◽  
...  

A pilot plant sequencing batch reactor (SBR) was applied in a wastewater treatment plant treating urban wastewater focused on carbon and nitrogen removal. From an initial predefined step-feed cycle definition, the evolution of the on-line monitored pH and calculated oxygen uptake rate (OUR) were analysed in terms of knowledge extraction. First, the aerobic phases of the SBR cycle were operated using an On/Off dissolved oxygen (DO) control strategy that concluded with a sinusoidal pH profile that made detecting the “ammonia valley” difficult. After changing to fuzzy logic control of the dissolved oxygen and by adding an air flow meter to the pilot plant, the pH evolution and on-line calculated OUR showed a clearer trend during the aerobic phases. Finally, a proposed algorithm for adjusting the aerobic phases of the SBR for carbon and ammonia removal is presented and discussed.

1999 ◽  
Vol 39 (6) ◽  
pp. 191-198 ◽  
Author(s):  
Timothy J. Hurse ◽  
Michael A. Connor

In an attempt to gain a better understanding of ammonia and nitrogen removal processes in multi-pond wastewater treatment lagoons, an analysis was carried out of data obtained during regular monitoring of Lagoon 115E at the Western Treatment Plant in Melbourne. To do this, a contour plot approach was developed that enables the data to be displayed as a function of pond number and date. Superimposition of contour plots for different parameters enabled the dependence of ammonia and nitrogen removal rates on various lagoon characteristics to be readily assessed. The importance of nitrification as an ammonia removal mechanism was confirmed. Temperature, dissolved oxygen concentration and algal concentration all had a significant influence on whether or not sizeable nitrifier populations developed and persisted in lagoon waters. The analysis made it evident that a better understanding of microbial, chemical and physical processes in lagoons is needed before their nitrogen removal capabilities can be predicted with confidence.


2004 ◽  
Vol 50 (10) ◽  
pp. 89-96 ◽  
Author(s):  
S. Puig ◽  
M.T. Vives ◽  
Ll. Corominas ◽  
M.D. Balaguer ◽  
J. Colprim

One of the problems of nitrogen removal from wastewater when applying sequencing batch reactor (SBR) technology, is the specific use of organic matter for denitrification purposes. Since easily biodegradable organic matter is rapidly consumed under aerobic or anoxic conditions (i.e. aerobic oxidation or anoxic denitrification, respectively), it is an important factor to consider when scaling up SBRs from the laboratory to real plant operation. In this paper, we present the results obtained in relation to scaling up reactors from lab-scale to pilot-plant scale, treating real wastewater from two different locations: the laboratory and in situ, respectively. In order to make using easily biodegradable organic matter more efficient, the filling phases of SBR cycles were adjusted according to a step-feed strategy composed of 6 anoxic-aerobic events. Feeding only occurred during anoxic phases. The results obtained demonstrated that the methodology may be useful in treating real wastewater with high carbon and nitrogen variations, as it always kept effluent levels lower than the official standards require (effluent total COD lower than 125 mg COD/L and effluent Total Nitrogen lower than 15 mg N/L).


2020 ◽  
Vol 82 (9) ◽  
pp. 1795-1807 ◽  
Author(s):  
Dejun Bian ◽  
Zebing Nie ◽  
Fan Wang ◽  
Shengshu Ai ◽  
Suiyi Zhu ◽  
...  

Abstract A micro-pressure swirl reactor (MPSR) was developed for carbon and nitrogen removal of wastewater, in which dissolved oxygen (DO) gradient and internal circulation could be created by setting the aerators along one side of the reactor, and micro-pressure could be realized by sealing most of the top cap and increasing the outlet water level. In this study, velocity and DO distribution in the reactor was measured, removal performance treating high-concentration wastewater was investigated, and the main functional microorganisms were analyzed. The experiment results indicated that there was stable swirl flow and spatial DO gradient in MPSR. Operated in sequencing batch reactor mode, distinct biological environments spatially and temporally were created. Under the average influent condition of chemical oxygen demand (COD) concentration of 2,884 mg/L and total nitrogen (TN) of 184 mg/L, COD removal efficiency and removal loading was 98% and 1.8 kgCOD/(m3·d) respectively, and TN removal efficiency and removal loading reached up to 90% and 0.11 kgTN/(m3·d) respectively. With efficient utilization of DO and simpler configuration for simultaneous nitrification and denitrification, the MPSR has the potential of treating high-concentration wastewater at lower cost.


2000 ◽  
Vol 41 (4-5) ◽  
pp. 5-12 ◽  
Author(s):  
E.v. Münch ◽  
K. Barr ◽  
S. Watts ◽  
J. Keller

The Oxley Creek wastewater treatment plant is a conventional 185,000 EP BOD removal activated sludge plant that is to be upgraded for nitrogen removal to protect its receiving water bodies, the Brisbane River and Moreton Bay. Suspended carrier technology is one possible way of upgrading this activated sludge wastewater treatment plant for nitrogen removal. Freely moving plastic media is added to the aeration zone, providing a growth platform for nitrifying bacteria and increasing the effective solids residence time (SRT). This paper presents the results from operating a pilot plant for 7 months at the Oxley Creek WWTP in Brisbane, Australia. Natrix Major 12/12 plastic media, developed by ANOX (Lund, Sweden), was trialed in the pilot plant. The pilot plant was operated with a mixed liquor suspended solids concentration of 1220 mg/L and a total hydraulic residence time of 5.4 hours, similar to the operating conditions in the full-scale Stage 1&2 works at the Oxley Creek WWTP. The plastic carriers were suspended in the last third of the bioreactor volume, which was aerated to a DO setpoint of 4.0 mg/L. The first third of the bioreactor volume was made anoxic and the second third served for carbon removal, being aerated to a DO setpoint of 0.5 mg/L. The results from the pilot plant indicate that an average effluent total inorganic nitrogen concentration (ammonia-N plus NOx−N) of less than 12 mg/L is possible. However, the effluent ammonia concentrations from the pilot plant showed large weekly fluctuations due to the intermittent operation of the sludge dewatering centrifuge returning significant ammonia loads to the plant on three days of the week. Optimising denitrification was carried out by lowering the DO concentration in the influent and in the carbon removal reactor. The results from the pilot plant study show that the Oxley Creek WWTP could be upgraded for nitrogen removal without additional tankage, using suspended carrier technology.


2005 ◽  
Vol 52 (4) ◽  
pp. 9-17 ◽  
Author(s):  
S. Caffaz ◽  
R. Canziani ◽  
C. Lubello ◽  
D. Santianni

In recent years a completely autotrophic nitrogen removal process based on Anammox biomass has been tested in a few European countries in order to treat anaerobic supernatant and to increase the COD/N ratio in municipal wastewater. This work reports experimental results on a possible technical solution to upgrade the S. Colombano treatment plant which treats wastewater from the Florentine urban area. The idea is to use 50% of the volume of the anaerobic digester in order to treat external sewage sludge (as septic tank sludge) together with waste activated sludge and to treat the resulting effluent on a SHARON-ANAMMOX process in order to remove nitrogen from the anaerobic supernatant. Anaerobic co-digestion, tested in a 200 L pilot plant, enables low cost treatment of septic tank sludge and increases biogas production; however, it also increases the nitrogen load re-circulated to the WWTP, where nitrogen removal efficiency is already low (<50%), due to the low COD/N ratio, which limits predenitrification efficiency. Experimental results from a SHARON process tested in a lab-scale pilot plant show that nitrite oxidising bacteria are washed-out and steady nitrite production can be achieved at retention times in the range 1–1.5 days, at 35 °C. In a lab-scale SBR reactor, coupled with a nitration bioreactor, maximum specific nitrogen removal rate under nitrite-limiting conditions (with doubling time equal to about 26 days at 35 °C) was equal to 0.22 kgN/kgSSV/d, about 44 times the rate measured in inoculum Anammox sludge. Finally, a cost analysis of the proposed upgrade is reported.


2013 ◽  
Vol 67 (12) ◽  
pp. 2677-2684 ◽  
Author(s):  
M. Christensson ◽  
S. Ekström ◽  
A. Andersson Chan ◽  
E. Le Vaillant ◽  
R. Lemaire

ANITA™ Mox is a new one-stage deammonification Moving-Bed Biofilm Reactor (MBBR) developed for partial nitrification to nitrite and autotrophic N-removal from N-rich effluents. This deammonification process offers many advantages such as dramatically reduced oxygen requirements, no chemical oxygen demand requirement, lower sludge production, no pre-treatment or requirement of chemicals and thereby being an energy and cost efficient nitrogen removal process. An innovative seeding strategy, the ‘BioFarm concept’, has been developed in order to decrease the start-up time of new ANITA Mox installations. New ANITA Mox installations are started with typically 3–15% of the added carriers being from the ‘BioFarm’, with already established anammox biofilm, the rest being new carriers. The first ANITA Mox plant, started up in 2010 at Sjölunda wastewater treatment plant (WWTP) in Malmö, Sweden, proved this seeding concept, reaching an ammonium removal rate of 1.2 kgN/m3 d and approximately 90% ammonia removal within 4 months from start-up. This first ANITA Mox plant is also the BioFarm used for forthcoming installations. Typical features of this first installation were low energy consumption, 1.5 kW/NH4-N-removed, low N2O emissions, <1% of the reduced nitrogen and a very stable and robust process towards variations in loads and process conditions. The second ANITA Mox plant, started up at Sundets WWTP in Växjö, Sweden, reached full capacity with more than 90% ammonia removal within 2 months from start-up. By applying a nitrogen loading strategy to the reactor that matches the capacity of the seeding carriers, more than 80% nitrogen removal could be obtained throughout the start-up period.


2015 ◽  
Vol 72 (1) ◽  
pp. 45-51 ◽  
Author(s):  
Massimo Raboni ◽  
Renato Gavasci ◽  
Paolo Viotti

Abstract Low concentrations of dissolved oxygen (DO) are usually found in biological anoxic pre-denitrification reactors, causing a reduction in nitrogen removal efficiency. Therefore, the reduction of DO in such reactors is fundamental for achieving good nutrient removal. The article shows the results of an experimental study carried out to evaluate the effect of the anoxic reactor hydrodynamic model on both residual DO concentration and nitrogen removal efficiency. In particular, two hydrodynamic models were considered: the single completely mixed reactor and a series of four reactors that resemble plug-flow behaviour. The latter prove to be more effective in oxygen consumption, allowing a lower residual DO concentration than the former. The series of reactors also achieves better specific denitrification rates and higher denitrification efficiency. Moreover, the denitrification food to microrganism (F:M) ratio (F:MDEN) demonstrates a relevant synergic action in both controlling residual DO and improving the denitrification performance.


2009 ◽  
Vol 59 (12) ◽  
pp. 2371-2377 ◽  
Author(s):  
Q. Yang ◽  
X. H. Liu ◽  
Y. Z. Peng ◽  
S. Y. Wang ◽  
H. W. Sun ◽  
...  

To obtain economically sustainable wastewater treatment, advanced nitrogen removal from municipal wastewater and the feasibility of achieving and stabilizing short-cut nitrification and denitrification were investigated in a pilot-plant sequencing batch reactor (SBR) with a working volume of 54 m3. Advanced nitrogen removal, from summer to winter, with effluent TN lower than 3 mg/L and nitrogen removal efficiency above 98% was successfully achieved in pulsed-feed SBR. Through long-term application of process control in pulsed-feed SBR, nitrite accumulation reached above 95% at normal temperature of 25°C. Even in winter, at the lowest temperature of 13°C, nitrite was still the end production of nitrification and nitrite accumulation was higher than 90%. On the basis of achieving advanced nitrogen removal, short-cut nitrification and denitrification was also successfully achieved. Compare to the pulse-feed SBR with fixed time control, the dosage of carbon source and energy consumption in pulsed-feed SBR with process control were saved about 30% and 15% respectively. In pulsed-feed SBR with process control, nitrogen removal efficiency was greatly improved. Moreover, consumption of power and carbon source was further saved.


2006 ◽  
Vol 53 (4-5) ◽  
pp. 253-262 ◽  
Author(s):  
A. Guisasola ◽  
M. Pijuan ◽  
J.A. Baeza ◽  
J. Carrera ◽  
J. Lafuente

The enhanced biological phosphorus removal (EBPR) process is based on enriching the sludge with polyphosphate accumulating organisms (PAO) which are scarce in conventional non-EBPR wastewater treatment plant sludge. Hence, the start-up of EBPR systems (i.e. enriching the sludge with PAO) can be very slow and complex. A simulation study of a possible improvement of the start-up of an EBPR system in a sequencing batch reactor is presented in this work. The improvement is based on reducing the length of the aerobic phase so that it coincides with the depletion of orthophosphate from the medium. This improvement, though verified by simulation to be very successful, requires a good on-line orthophosphate sensor. To avoid this technical limitation, a link between oxygen uptake rate (OUR) measurements and orthophosphate presence is proposed. This link allows the control of the aerobic phase length with OUR as a measured variable and, consequently, a considerable improvement with respect to the conventional fixed aerobic phase length operation. An improvement of 95% in the ratio of PAO to heterotrophs and an increase of 30% in the final amount of PAO in sludge is achieved with this control strategy. The kinetic mod for simulations was a modification of the Activated Sludge Model 2d.


Sign in / Sign up

Export Citation Format

Share Document