scholarly journals INFORMATION MODELING OF LIFE CYCLE OF HIGH-RISE CONSTRUCTION PROJECTS

Vestnik MGSU ◽  
2018 ◽  
pp. 14-22 ◽  
Author(s):  
E. A. Gusakova

Improving the efficiency of life cycle management of capital construction projects using information modeling technologies is one of the important tasks of the construction industry. The paper presents an analysis of accumulated domestic practices, including the legal and regulatory framework, assessing the effectiveness of managing the implementation of investment construction projects and of complex and serial capital construction projects, as well as the life cycle management of especially dangerous technically complex and unique capital construction projects using information modeling technologies, especially capital construction projects, as well as their supporting and using systems, primarily in the nuclear and transport sectors. A review of modern approaches to assessing the effectiveness of life cycle management systems of complex engineering systems in relation to capital construction projects is carried out. The presented material will make it possible to formulate the basic principles and prospects of applying approaches to assessing the effectiveness of the life cycle management system of a capital construction project using information modeling technologies.


The variants of the division of the life cycle of a construction object at the stages adopted in the territory of the Russian Federation, as well as in other countries are considered. Particular attention is paid to the exemplary work plan – "RIBA plan of work", used in England. A feature of this document is its applicability in the information modeling of construction projects (Building information Modeling – BIM). The article presents a structural and logical scheme of the life cycle of a building object and a list of works that are performed using information modeling technology at various stages of the life cycle of the building. The place of information models in the process of determining the service life of the building is shown. On the basis of the considered sources of information, promising directions for the development of the life cycle management system of the construction object (Life Cycle Management) and the development of the regulatory framework in order to improve the use of information modeling in construction are given.


Work ◽  
2012 ◽  
Vol 41 ◽  
pp. 114-119 ◽  
Author(s):  
Kerosuo Hannele ◽  
Miettinen Reijo ◽  
Mäki Tarja ◽  
Paavola Sami ◽  
Korpela Jenni ◽  
...  

2019 ◽  
Vol 948 (6) ◽  
pp. 16-23
Author(s):  
B.F. Azarov ◽  
I.V. Karelina

The role and place of ground laser scanning in the process of creating information models of the construction object at different stages of its life cycle are discussed. It is noted that ground laser scanning is the main way of creating point clouds of buildings and structures. The composition of information models characterizing the construction object at different stages of its life cycle is considered. It is indicated that ground-based laser scanning is the best solution for the information modeling problems in constructing an object, in particular, for its geodetic control. The authors provide examples of using ground laser scanning data for geodetic control at different stages of construction. In conclusion, the relevant problems of three- dimensional building-models, which can be solved using the technology of ground laser scanning, are indicated. It also noted what advantages ground-based laser scanning has as a tool for information modeling construction projects.


2021 ◽  
Vol 27 (12) ◽  
pp. 992-1002
Author(s):  
I. V. Karakozova ◽  
Yu. S. Prokhorova

Aim. The presented study aims to create a unified information environment for all participants of construction project implementation and to monitor key indicators of construction during its implementation.Tasks. The authors develop a methodological approach to substantiate a unified information environment for the implementation of capital construction projects; develop modules of the information environment that reflect the processes of designing a facility and managing costs at all stages of its life cycle. Methods. This study uses the methods of analysis and synthesis, graphical modeling, expert and comparative assessments, methods of pricing in construction.Results. An information environment for the implementation of capital construction projects is developed. Its major modules reflect the processes of designing and constructing a facility and managing costs at all stages of its life cycle.Conclusions. Introduction of the proposed information environment for managing construction costs at the enterprise level with an integrated design module based on information modeling technologies will improve the efficiency of interaction between the participants of the investment and construction process and will provide a unified cost management algorithm in the context of the active digitalization of the industry.


2021 ◽  
Vol 13 (15) ◽  
pp. 8139
Author(s):  
Ian Vázquez-Rowe ◽  
Cristina Córdova-Arias ◽  
Xavier Brioso ◽  
Sandra Santa-Cruz

Building information modeling (BIM) is an emerging technology that improves visualization, understanding, and transparency in construction projects. Its use in Latin America and the Caribbean (LA&C), while still scarce, is developing in combination with multi-criteria decision-making (MCDM) methods, such as the choosing by advantages (CBA) method. Despite the holistic nature of MCDM methods, the inclusion of life cycle environmental metrics is lagging in construction projects in LA&C. However, recent studies point toward the need to optimize the synergies between BIM and life cycle assessment (LCA), in which a method like CBA could allow improving the quality of the decisions. Therefore, the main objective of this study is to integrate LCA and CBA methods to identify the effect that the inclusion of environmental impacts can have on decision-making in public procurement, as well as comparing how this final decision differs from an exclusively LCA-oriented interpretation of the results. Once the LCA was performed, a set of additional criteria for the CBA method were fixed, including transparency, technical, and social indicators. Thereafter, a stakeholder participative workshop was held in order to gather experts to elucidate on the final decision. The methodology was applied to a relevant construction sector problem modelled with BIM in the city of Lima (Peru), which consisted of three different construction techniques needed to retrofit educational institutions. Results from the LCA-oriented assessment, which was supported by Monte Carlo simulation, revealed a situation in which the masonry-based technique showed significantly lower environmental impacts than the remaining two options. However, when a wider range of technical, social, and transparency criteria are added to the environmental indicators, this low-carbon technique only prevailed in those workshop tables in which environmental experts were present and under specific computational assumptions, whereas teams with a higher proportion of government members were inclined to foster alternatives that imply less bureaucratic barriers. Finally, the results constitute an important milestone when it comes to including environmental factors in public procurement in LA&C.


2018 ◽  
Vol 8 (4) ◽  
pp. 372-385 ◽  
Author(s):  
Ahmad Huzaimi Abd Jamil ◽  
Mohamad Syazli Fathi

Purpose Building information modeling (BIM) has been proven to enable outstanding results in construction processes by enhancing knowledge sharing with regard to a building or facility throughout its life cycle from the conceptual design to facility management. The purpose of this paper is to investigate the extent to which the use of BIM has impacted the legal and contractual implications of the existing construction contracts for aligning the three sets of relevant development domains: BIM functionality, contract procurement methods, and BIM legal and contractual issues to enhance the efficient use of valuable resources. Design/methodology/approach This exploratory study was undertaken by analyzing the literature using a novel approach involving a matrix that juxtaposes BIM functionalities for each project life cycle with contract procurement methods. As part of the study, 28 interactions of BIM legal and contractual issues have been identified, as representing positive and negative interactions. Findings The interaction matrix framework that juxtaposes BIM functionalities and procurement methods highlights the theoretical and practical relationships identified between the methods. It also simultaneously recognizes the constructive and destructive interactions between these development domains by means of critically identifying the possible interactions of the legal and contractual aspects of both the BIM project procurement and the practical aspects of BIM project delivery. Originality/value The present study contributes to the existing literature by extensively identifying the probable interactions of contractual issues within BIM functionality with contract procurement methods throughout the life cycle of a building construction project.


2018 ◽  
Vol 33 ◽  
pp. 03037
Author(s):  
Yana Rogacheva ◽  
Andrey Panenkov ◽  
Zinaida Petrikova ◽  
Ekaterina Nezhnikova

Improving the quality of high-rise buildings under modern conditions should be based not only on compliance with the norms of technical regulations, but also on ensuring energy efficiency, environmental friendliness, and intellectuality, which can be achieved only through the introduction of innovations at all stages of the life cycle of the investment project. Authors of this article justified the need for a mechanism of technological and price audit of projects. They also suggested the model of life cycle of organizational and economic changes, connected with implantation of the mechanism of projects audit. They showed innovation character of ecological high-rise construction for the whole life cycle. Authors also made proposals to change the audit system for high-rise construction projects in the focus of its environmental friendliness.


Author(s):  
Е. П. Горбанева ◽  
А. В. Мищенко

Постановка задачи. Исследуется технология информационного моделирования на всех этапах жизненного цикла объектов капитального строительства. Практическая реализация технологии информационного моделирования рассматривается на примере проведения изыскательских работ. Результаты. Выявлены недостатки существующей нормативной документации, применяемой при информационном моделирования. Сформулированы задачи технологии информационного моделирования в строительной отрасли на протяжении всего жизненного цикла. Рассмотрено применение технологии информационного моделирования на этапе инженерных изысканий жизненного цикла объекта капитального строительства с обоснованием ее экономической эффективности. Выводы. Для эффективного применения технологии информационного моделирования и обеспечения выполнения возложенных на нее задач необходимо создание полноценной производственной нормативной базы, определяющей статус информационной модели и требования к документации (в том числе ее хранению и внесению в нее изменений), получаемой на ее основе различными участниками на всех этапах строительного производства. Statement of the problem. Information modeling technology is explored at all stages of the life cycle of capital construction projects. Practical implementation of information modeling technology by the example of survey work is demonstrated. Results. Deficiencies of the existing regulatory documents used in information modeling are identified. The tasks of information modeling technologies in the construction industry throughout the life cycle are formulated. The application of information modeling technology at the stage of engineering surveys of the life cycle of the capital construction object with the justification of its economic efficiency is considered. Conclusions. For effective application of information modeling technologies and ensuring the completion of the tasks, it is necessary to create a full-fledged production regulatory framework that defines the status of the information model and the requirements for documentation (including making changes and storage) obtained on its basis by various participants at all stages of construction production.