scholarly journals Assessment of Change Orders Attributes in Preconstruction and Construction Phase

2019 ◽  
Vol 5 (3) ◽  
pp. 616
Author(s):  
Ali Raza Khoso ◽  
Jam Shahzaib Khan ◽  
Rizwan Ullah Faiz ◽  
Muhammad Akram Akhund

Construction projects are very complex in nature. Each activity involves multiple varying tasks. Construction industry is the main source of economic growth. When change order occur performance of projects momentously affected.  Change orders often have a serious impact on the quality, time and cost. Eventually it results in disputes, delays, and dissatisfactions among stakeholders and ultimately results in failures of projects. In past several studies have been done to evaluate the causes of change order and its effects. Attempts have been made to quantify these impacts by many researchers, but the aim of this study is to identify the causes of change order in two different phases i.e. preconstruction and construction stage. Views were taken from relevant experts over included factors after in-depth literature review from past researches. A questionnaire was made and floated with different construction players from clients, consultants and contractors side. The data was analyzed by SPSS using average index technique. The analysis of data showed that, Mistakes in specifications, Mistakes in design and Lack of experience in selecting construction team by client are the most critical factors during preconstruction phase. Whereas, Design modification by owner, change in scope at later stage and Delays in payment by client are most critical factors of construction phase, responsible for change order. The extensive discussion of these factors revealed various parameters related to Pakistan construction. This study will enable the clients, consultants and contractors to be aware of factors which causes changes in orders and their consequences on project completion. By the identification of possible reasons, the right decisions can be made to mark the project successful.

2020 ◽  
Vol 3 (4) ◽  
pp. 1349
Author(s):  
Hendy Eka Putra ◽  
Hendrik Sulistio

The implementation of the construction project caused miscommunication, this made the contract became a reference during implementation. In the implementation of construction projects, there are often changes that not according to contract, for example: work volume changes, specifications changes, type or method of work changes, schedules changes , design changes, and others. These changes are commonly known as change orders. There are several things that cause a change order, for example: incompletable contract, design does not fit in the field, unsupportive weather, and others. This research is to determine the effect of change order in the aspects of cost, quality, and time in multi-storey building construction projects. Researchers used data from the responses of respondents consisting of contractors, consultants, and owners. The questionnaire made proposes several aspects of change orders and their effects on cost, quality, and time. Analysis of research data was carried out with the help of the SmartPLS 3.0 application program. The influence of change orders on costs is the lack of costs due to the addition of work items, while on quality is the quality decrease due to additional work volume, and on time is the delay in project completion due to changes in completed work.ABSTRAKPelaksanaan proyek konstruksi menyebabkan terjadi perbedaan pendapat yang disebabkan oleh pihak yang terlibat, hal ini membuat kontrak menjadi sangat penting dan menjadi acuan selama pelaksanaan. Pada pelaksanaan proyek konstruksi sering terjadi perubahan-perubahan yang akhirnya tidak sesuai dengan kontrak sebelumnya contohnya seperti: perubahan volume pekerjaan, perubahan spesifikasi, perubahan jenis atau metode pekerjaan, perubahan jadwal, perubahan design, dan lain-lain. Perubahan ini umum sekali terjadi dalam proyek konstruksi dan lebih sering dikenal sebagai change order.  Ada beberapa hal yang menyebabkan perlunya dilakukan change order, misalnya: kontrak yang dibuat tidak lengkap, design yang ada tidak sesuai dengan kondisi lapangan, cuaca yang tidak mendukung, dan lain-lain. Penelitian ini dilakukan untuk mengetahui besar pengaruh change order dalam aspek biaya, mutu, dan waktu dalam proyek konstruksi gedung bertingkat. Peneliti menggunakan data dari hasil tanggapan responden yang terdiri dari kontraktor, konsultan, dan pemilik. Kuesioner yang dibuat mengajukan beberapa aspek mengenai change order serta pengaruhnya terhadap biaya, mutu, dan waktu. Analisis data penelitian dilakukan dengan bantuan program aplikasi SmartPLS 3.0. Pengaruh change order terhadap biaya adalah kurangnya biaya akibat penambahan item pekerjaan, sedangkan terhadap mutu adalah menurunnya kualitas bangunan akibat penambahan volume pekerjaan, dan terhadap waktu adalah terjadinya keterlambatan penyelesaian proyek akibat perubahan pekerjaan yang telah selesai.


2021 ◽  
Vol 318 ◽  
pp. 02003
Author(s):  
Hassan Kamal Alhilli ◽  
Sedki I. Rezoqi

Changes are a common phenomenon in the construction industry, impacting the project's cost, time, and performance. The purpose of this work is to a comprehensive review relating to variation order causes. Also, the aim here is to determine variation order causes in the building’s construction. More importantly, explore the relationship between these causes. However, the importance of specifying the causes for change orders is the first step in managing variation orders to reduce the harmful effect on a project. The field survey was conducted for several institutions such as health (Karkh’s health), higher education (University of Baghdad and University of Kufa). As a result, a field visit was made to the project sites. They were then, Conducting interviews with the resident engineer, the consultant, and the contractor. A developer tool called cause (variation orders) breakdown structure (CBS) included 12 causes at the first level, including 103 sub-causes. There is a relationship between the variation orders causes, which is evident in the third level. The study recommends adopting (CBS) a comprehensive reference for variation order causes in projects due to facilitating their management processes. Future research could examine the relative importance of variation order causes, in addition to using a fuzzy cognitive map to find the extent of each cause’s influence on the other.


2019 ◽  
Vol 13 (1) ◽  
pp. 218-228
Author(s):  
Dinh Tuan Hai

Background: Claims have increasingly become inevitable in construction projects. A great amount of money, time, and merit of claims are the most critical factors that prudent companies should not overlook. Objective: The objective of the study is to survey claim practices in the Vietnamese construction industry by collecting data from both contractors and consultants. Material and Methods: This paper presents findings that the lack of awareness of the on-site people is the major problem of claims management. Moreover, the inadequacy of supporting evidence, originating from the unawareness of personnel as well as improper documentation system, is also a serious problem causing the loss of chances to recover incurred damages. Conclusion: To overcome these problems, it is recommended that the management should pay more attention to these aspects in order to have effective claim management, by which unnecessary losses could substantially be reduced and deserving compensation would be recovered.


As the intricacy of construction projects is amassed, prospects for tribulations are mounting, depicting negative impact on projects’ cost, time and excellence. Thus, eliciting claims that aredisruptive to projects, time consuming and exorbitant. BIM holds enormousprobable in prosperous claim management practices. The progression of BIM can enrich knowledge sharing for information of a building or facility. It forms a vitalbase for decision making throughout the life cycle phase from the conceptual design to demolition. BIM is also, a valuable multidisciplinary cohesive source of information technology that posts benefits and disputes in the construction industry. The main aspiration of this paper is to appraise how and to what magnitude BIM can help evading and plummeting claims in Jordan construction industry.The paper ran a literature review on recent research, industry reports, and other sources to seehow they identified claims, its classifications, benefits, impacts and challenges of BIM on construction projects.Also, the paper acknowledgedcontemporaneous challenges in the claims field and the construction industry as whole. The attained outcomes have shown that BIM overtakes traditional claim management practices in many aspects including recognizing and investigating claims, where the benefits are comprehended in time and cost savings, less change orders, less rework. Moreover, the information and knowledge management that BIM postulates can improve many aspects of claim management.


Author(s):  
Zain Ghazi Al-Kofahi ◽  
Amirsaman Mahdavian ◽  
Amr Oloufa

It is vital to investigate the system dynamics (SD) between the change orders and labor productivity to identify the causes of the productivity loss of the construction projects. Most productivity loss studies were financed from the contractor’s part and rely on the contractor’s data. This research highlighted the problem of productivity loss resulting from issuance of a change order by utilizing a previously developed SD model. It conducted a sensitivity analysis to evaluate the impact of overtime, overmanning, temperature and learning on the behavior of the SD model quantifying change orders' impact on labor productivity. Based on the results, SD provides more reliable results comparing with the measured mile analysis (MMA) approach for the compensation request, considering the leading factors affecting the productivity loss other than the change order. The model developed in this study can accept or reject the responsibility of a change order for occurrence of productivity loss.


2009 ◽  
Vol 36 (3) ◽  
pp. 439-449 ◽  
Author(s):  
Yi Zou ◽  
Sang-Hoon Lee

Change orders are ubiquitous in construction projects, and effective and efficient control of changes is critical to project success. There have been many empirical suggestions as to how to manage changes for best project outcomes, but this research is specifically aimed at exploring the relationship between project characteristics and the implementation of project change management best practices (PCMBP). Construction project data for this research are derived from the Construction Industry Institute (CII) benchmarking and metrics (BM&M) database. Binary logistic regressions and factorial analysis of variance (ANOVA) are performed to find out the differences among diverse types of projects in terms of the extents to which the PCMBP elements have been implemented. The findings can assist construction industry practitioners with using PCMBP more purposefully in accordance with specific project characteristics so that they will be better able to develop and administer their project execution plans.


2020 ◽  
Vol 3 (1) ◽  
pp. 175
Author(s):  
Dominicus Edwin ◽  
Mega Waty

In every project, one thing that often happens is a change order. Change order is a change of work after the contract is signed by the owner and contractor. These changes can occur at the beginning, middle, or in construction projects. To minimize change orders, a change order correlation analysis can be done using the original data, with the parameters change order ratio in addition (CORA) and change order ratio in substraction (CORS). The data used in this study uses two original change order contract data on projects in Banten Province. This study produced 4 correlation results obtained from Pearson correlation in the SPSS program. The results of the correlation of the weight of each work to CORA on project 1 did not show any correlation. The results of the correlation of weights for each work with CORA project 2 and the results of the correlation of weights with CORS project 2 showed a significant correlation at the 95% degree of confidence. The results of the correlation of the weight of each work with CORS project 1 showed a very significant correlation at the 99% degree of confidence.AbstrakDalam setiap proyek, salah satu hal yang sering terjadi ialah change order. Change order adalah perubahan pekerjaan setelah kontrak yang ditandatangani oleh pemilik dan kontraktor. Perubahan itu dapat terjadi pada awal, tengah, ataupun pada dalam proyek konstruksi. Untuk meminimalisir change order maka dapat dilakukan analisis korelasi change order menggunakan data asli, dengan parameter change order ratio in addition (CORA) dan change order ratio in substraction (CORS). Data yang digunakan pada studi ini menggunakan dua data asli kontrak change order pada proyek konstruksi jalan aspal di Provinsi Banten. Baik data proyek 1 maupun data proyek 2 memiliki data kontrak change order biaya awal dan data biaya setelah terjadinya change order. Studi ini menghasilkan 4 hasil korelasi yang di dapat dari korelasi pearson pada program SPSS. Hasil korelasi bobot tiap pekerjaan terhadap CORA pada proyek 1 tidak menunjukan adanya korelasi. Hasil korelasi bobot tiap pekerjaan dengan CORA proyek 2 dan hasil korelasi bobot dengan CORS proyek 2 menunjukan adanya korelasi yang signifikan pada tingkat derajat kepercayaan 95%. Hasil korelasi bobot tiap pekerjaan dengan CORS proyek 1 menunjukan adanya korelasi yang sangat signifikan pada tingkat derajat kepercayaan 99%.


2021 ◽  
Vol 4 (1) ◽  
pp. 50-64
Author(s):  
Ja’far A. Aldiabat Al-Btoosh

Variation order (VO) is one of the main issues faced by the construction industry in Jordan. Many researchers had investigated on the causes of VO and proposed procedures to minimize and control this issue; however, the VO is affecting the construction industry badly even at moment. Building Information Modeling (BIM) is a powerful management system that can make a significant difference in the project costs. However, BIM has not been examined as a tool to minimize the VO in Jordan. The main target of this study is to utilize BIM applications in reducing the effect of VO on the governmental projects in Jordan. In order to achieve this target, the researcher has designed a questionnaire to gather data related to VO causes and the BIM capability to solve this problem. The data collected from the questionnaires were analyzed statistically. The result from the analysis found that the consultant initiated the highest VO of 50% followed by the clients and the contractors of 20% and 10% unforeseen variation respectively. Moreover, it is found that BIM Design Applications, Facility Operations Simulation, Exploration Design Scenarios, BIM Design Detection and BIM Quantity Take-off and Cost Estimation were significantly capable of minimizing VO. The results show positive relationship with the application of BIM in minimizing VO in the construction industry in Jordan. © 2018. JASET, International Scholars and Researchers Association


Author(s):  
Mega Waty ◽  
Hendrik Sulistio

A Change Order is a written and legal work order that changes the scope of the original contract, with compensation that has been agreed upon by the owner and the contractor. Changes can be in the form of adding or reducing the scope of work, changing materials, or changing schedules. Change Order causes the cost of contract items to swell, planning errors and negligence as well as changes in scope that can be reduced by sharpening planning results. The scope of research on road construction in Indonesia, especially in DKI Jakarta and Banten provinces. This study aims to determine the identification of change orders in road construction projects. Data obtained from real data on road construction projects from 2013-2018 on 16 road construction project packages in the form of road construction project addendum contracts. Based on the addendum contract, added work, less work, addition of new items and removal of work items are determined. The identification of change order risk is seen from three aspects, namely the addition and reduction of work items, the removal of items and the addition of new items and the wishes of the owner, thereby increasing the cost of the change order contract. This study found 732 changes in construction work items. Risk identification is obtained from the frequency of changes above 35% which is an intermediate frequency that tends to increase the occurrence of change orders. The results of risk identification were obtained for 31 construction work items, the highest percentage was for Thermoplastic Road Marking work, followed by 30 other construction work items. Keywords: risk identification; change orders; road construction projects  AbstrakChange Order adalah perintah kerja tertulis dan sah  yang mengubah lingkup kontrak semula, dengan kompensasi  yang sudah disetujui oleh pemilik dan  kontraktor.  Perubahan dapat berupa penambahan atau pengurangan lingkup pekerjaan, perubahan material, atau perubahan jadwal. Change Order menyebabkan biaya  item kontrak membengkak, kesalahan perencanaan dan kelalaian serta perubahan ruang lingkup yang dapat dikurangi dengan mempertajam hasil perencanaan.. Lingkup penelitian pada konstruksi jalan di Indonesia khususnya  provinsi DKI Jakarta dan Banten. Penelitian  bertujuan untuk  mengetahui  identifikasi change order proyek konstruksi jalan. Data didapat dari data riil proyek konstruksi jalan dari tahun 2013- 2018 pada 16 paket proyek konstruksi jalan berupa kontrak addendum proyek konstruksi jalan. Berdasarkan kontrak addendum maka ditentukan pekerjaan tambah, pekerjaan kurang, penambahan item baru dan penghilangan item pekerjaan. Identifikasi risiko change order dilihat dari tiga aspek yakni penambahan dan pengurangan item pekerjaan, penghilangan item dan penambahan item baru dan keinginan dari pihak owner sehingga meningkatkan biaya kontrak change order.  Penelitian ini mendapatkan 732 perubahan  item pekerjaan konstruksi.  Identifikasi risiko didapat dari  frekuensi perubahan diatas 35% yang merupakan frekuensi menengah yang cenderung meningkatkan terjadinya change order. Hasil identifikasi risiko didapat pada  31 item pekerjaan konstruksi, yang tertinggi persentase pada pekerjaan  Marka Jalan Termoplastik, diikuti 30 item pekerjaan konstruksi lainnya.


2020 ◽  
Vol 17 (2) ◽  
pp. 715-728
Author(s):  
Abdulhamid Al-Gheth ◽  
Md. Sayuti Bin Ishak

Globally, construction delay is the main factors which have a high impact on countries’ economy and development. The present paper reports an exploratory research study of previous international research into delay factors affecting project delivery. The objective of this study was to deliver an overview of construction delays in order to classify the main groups of delays and compare the UAE construction industry with international studies. In total, 14 groups were found to contribute to causing construction delays. Studies of the global and UAE construction industry are in agreement that the leading group of factors that affect project completion are management factors; then, the second group comprises financial factors.